| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹46.6 LAdmitted-Finance | -40.99% | ₹46.6 L | L1 | Admitted-Finance |
| 2 | L2₹47.4 LAdmitted-Finance | -40.00% | ₹47.4 L | L2 | Admitted-Finance |
| 3 | L3₹48.1 LAdmitted-Finance | -39.11% | ₹48.1 L | L3 | Admitted-Finance |
| 4 | L4₹50.1 LAdmitted-Finance | -36.57% | ₹50.1 L | L4 | Admitted-Finance |
| 5 | L5₹62.2 LAdmitted-Finance | -21.21% | ₹62.2 L | L5 | Admitted-Finance |
Tender Value
₹79.0 L
EMD Value
₹1.6 L
Closing Date
22 Jan 2026, 6:00 pmClosed
se
wdsc tonk
refer bids
2026_WDSC_527529_1
nit 30/25-26
Open Tender
Civil Works - Water Works
180 days
tonk
refer bids
2 documents required · 2 mandatory
₹1,000
refer bids
₹1.6 L
Yes
se office wdsc tonk
28 Jan 2026
14 Jan 2026
23 Jan 2026
14 Jan 2026
22 Jan 2026
14 Jan 2026
14 Jan 2026 - 22 Jan 2026
20 Jan 2026
as per bsr specification
Dag belling 5 to 7.5 cm (RDPR BSR 01-04-2025 Item No-6B)
jungle clearance (BSR RD & PR 2025 ItemNo. 192 )
Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect ( Item no-1& 2 ch-v WRD BSR 2023 tonk less 10% C.P. )1b. Hard / dense soil
Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect ( Item no-1& 2 ch-v WRD BSR 2023 tonk less 10% C.P. 1c. Hard soil mixed with kankar/boulders, morrum
जे.सी.बी. मशीन/ट्रेक्टर मय स्क्रेपर द्वारा मिटटी खुदाई कार्य, खोदी हुई मिटटी के डगलों को तोडने (Breaking of clods), घास एवं कंकर, पत्थर को अलग करना (Sorting of grass & pebbles) एवं बण्ड (Bund) का सेक्शन (काट क्षेत्रफल में)/प्रोफाइल संधारित करना मय चढाना एवं उतारना प्रारंभिक लीड 250 मी. एवं लिफ्ट 3 मी. तक। Draft based on chapter 5th of irrigation page number 32 to 34 (दिनाँक 01/02/2017 से मान्य) ईकाई 1 घन मी.
सीमेंट कंक्रीट 1 सीमेंट : 4 बजरी तथा 8 गिट्टी / 1 सीमेंट, 3 बजरी तथा6 गिट्टी पत्थर की 20 मिमी नामीय माप की नींव में डालना,कूटना तथा तराई आदि सहित एनीकट के लिए। #170(अ)1:4:8 वाईब्रटर व मिक्सर का उपयोग नही करने पर 3 प्रतिशत की कटोती की जावेगी। (RDPR BSR 01-04-2025)
,uhdV gsrq iRFkj dh fpukbZ lhesaV ctjh elkys esa 1% 6 esa #166(अ) RDPR BSR 01-04-2025
Cement concrete well mixed with cement mortar (1:2:4) laid in position complete excluding curing with aggregate size upto 20mm HB.)
lhesaV IykLVj nhokj ij 1%6 vuqikr eS lhesaV es ctjh feykdj tksM+ks dks dwjsnus rFkk 14 fnu rd fu;fer rjkbZ lfgr 25 eh-eh- eksVkbZ ¼dsoy tyjks/kh lajpukvksa ds mi;ksx gsrq (RDPR BSR 01-04-2025 Item No-77 (अ)
Earth work in rough (borrow area) excavation for embankment in hard soil, Morrum of highly weathered strata dry or moist, including laying in 20 cm layers ( before compaction) and breaking of clods, sorting of grass, pebbles etc. and dressing when compacted manually or by plain roller with initial lead 250 mtr and lift up 1.50 mtr (excluded charge for compaction and watering),including loading and unloading whenever required comp. in all respect. Deduct in item no 16 (a) to (d) above if Standard Proctor's density to be achived is at least 90% ( Item no-16 &17 ch-v WRD BSR 2023 tonk less 10% C.P. )
Compaction of earth or highly weathered strata a. by manually or plain roller , (density 90 % of Proctor) ( Item no-18 a ch-v WRD BSR 2023 tonk less 10% C.P. )
Watering of earth inc. cost of carriage of water (up to 1 Km ) (Item no-28 a ch-v WRD BSR -2023 tonk less 10% C.P. )
सड़क के निश्चित केम्बर तथा ग्रेड में ग्रेवल, कंकर, क्वैरी रविश एवं कोर्स एग्रीगेट को 15 सेमी से (बिना कुटी) कम मोटाई में बिछाना, फैलाना तथा 8-10 टन भार के रोलर से दबाना, कूटना तथा समस्त लीड के साथ पानी खर्च तथा औजार, मशीनरी का किराया सहित। BSR RD & PR 2025 item 138+139+185F
Lip cutting and final dressing as per desgined section including re-handling and disposal of excuvated earth in layers 20cm on embankments etc BSR Irri. Dept. 2023 ItemNo. 19 A Chapter V (Deduct 10 % Rate)
RR Dry Stone Pitching of Course Rubble BSR RD & PR ItemNo. 167
Raised & cut pointing in cement sand mortar 1:3.
Sign board
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.56 MB
bid.pdf
Tender Documents • 2.47 MB
BOQ_941510.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid