| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.2 CrAccepted-AOC K 80 MAJITHIA ENCALVE PATIALA | PATIALA | PUNJAB | 140401 | ₹3.2 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹3.5 Cr+₹24.8 L (7.64%)Rejected-AOC | ₹3.5 Cr+₹24.8 L (7.64%) | L2 | Rejected-AOC L2 |
| 3 | L3₹3.7 Cr+₹43.7 L (13.5%)Rejected-AOC | ₹3.7 Cr+₹43.7 L (13.5%) | L3 | Rejected-AOC L3 |
| 4 | L4₹3.8 Cr+₹51.6 L (15.9%)Rejected-AOC | ₹3.8 Cr+₹51.6 L (15.9%) | L4 | Rejected-AOC L4 |
| 5 | Rejected-Technical 4 KRISHNA COLONY AGRA ROAD JAIPUR | - | - | Rejected-Technical Non Responsive |
Tender Value
₹3.8 Cr
EMD Value
₹7.6 L
Closing Date
14 Mar 2022, 5:00 pmClosed
Executive Engineer
Room No. 209, 1st floor, Sub Divisional Complex Rajpura
PROVIDING SEWERAGE NETWORK IN VILLAGE ASARPUR , BLOCK SANOUR, TEHSIL and DISTRICT PATIALA.
2022_WSS_81706_1
Sewerage Scheme Assarpur Block Sanour
Open Tender
Civil Works - Water Works
Item Rate
183 days
O/o EE WSSD Rajpura
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,000
₹7.6 L
O/o CE South WSSD Patiala
23 Aug 2022
20 Jan 2022
15 Mar 2022
20 Jan 2022
14 Mar 2022
20 Jan 2022
14 Feb 2022
Amount
Earthwork in excavation depth not exceeding 2.0 mt
Earth work in excavation by mechanical means (3D /JCB) over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m, 3 mtr and 1.5 respectively
For depth not exceeding 3.0 mt. below ground level for all kind of soil except rocky.
For depth 3.0 mt. to 4.5 Mt
Providing & fixing timbering on face of trenches if required for sewer & manholes for item no.29.4 and 29.5 irrespective of depth measuring each timbered surface of trench on which timbering is done Type II polling board frame system type timbering
For trench having width up to 1.0 Mtr.
For trench having width above 2.0 Mtr. up to 3.0 Mtr.
Exra for filling earth in 15 cm layers and compaction.For item no. 29.1 to 29.2 & 29.4 to 29.5
Cement Conc .1:6:12
Cement Conc .1:2:4
RCC M-30 (in F & P)
B.B. in 1:5 in Foundation & Plinth
B.B. in 1:5 in Super structure
12.5 mm thick cement plaster in 1:2
Cement rendering on plaster 1mm th.
20 mm thick cement plaster in 1:2
Centring & Shutter ing for Vertical surfaces
Centring & Shutter ing for flat surfaces
Prov. Lowering,Cutting & Jointing of UPVC pipes into trenches
Prov.& fixing of RCC Man hole covers & frames including cem. Conc. Coping 1:2:4 around the frame.
560 mm i/d (heavy duty)
Prov.of orange color safety footrest including fixing in manholes with cem. Conc. block 1:2:4 complete
Cold twisted deformed steel
Floating coat of 1.5 mm thick neat cement laid in one operation to the topping
Add difference of rate of Steel
Add difference of rate of bricks in Patiala Distt. (Total Bricks - 405394/ 1000 = 405.394)
Add difference of rate of cement.
Less difference of rate of sand in Patiala Distt. (Lohandkhad)
Less difference of rate of bajri 12mm in Patiala Distt. (Mirthal)
Less difference of rate of bajri 40mm in Patiala Distt.(Mirthal)
Cost of Fine sand to be poured around UPVC pipes as per Quarry site rate+Contractor Profit
Earth,Surkhi, Sand, Earth, Fly Ash, Bajri, Ballast, Stone Boulders, Kankar and Building Rubbish, Earth
Carriage of Bajri 12 mm (Mirthal)
Up to 223 Km ( 228-005 )
Carriage of Bajri 40 mm (Mirthal)
Up to 223 Km ( 228-005 )
Carriage of Coarse sand (Lohandkhad)
Up to 147 Km (152-005)
Carriage of Fine Sand ( Phill)
up to 90 Km (95-05)
Dismantling of Bituminuos courses of flxible pavements by mechanical means and disposal of dismantled materials upto a lead of 1000 meters, stacking serviceable and unserviceable materials seperately as per technical clause 202 of MORT& H specifications
Dismentalling of Brick or flage stone flooring with conc .base
Dismantling brick or flagged stone flooring without concrete base
Dismentalling of Cement Concrete 1:6 :12 with 40mm gauage stone
Dismentaling of C.Con (1:2:4)
Earth work excavation in ordinary soil exclusive of compensation of earth
Kassi work undressed
Cement Concrete 1:8:16 with 40mm gauage stone
Prov. & laying 60 mm thick factory made C.Conc.interlocking tiles M35
Reconditiong of Metalled Road with dismantled and new material
Providing surface coating on metalled road
Laying Of C. Conc (1:2:4) ( By manual mean)
Dry brick on Edge paving sand grouted over 50mm thick brick aggregate
60% with dismentaled bricks
40%with New bricks
Making connection of sewer line with existing manhole etc. complete.
Excavation manually in trenches for pipe lines with straight or open cutting in streets and lanes in builtup area where width of street / Lane from wall to wall is less than 3 meter including trimming and dressing sides levelling of beds of trenches to correct grade, cutting joint holes, refilling consolidation,watering , including the cost of dewatering of rain water, diversion for traffic, night signals. Providing & fixing caution boards, watching, fencing, etc. and removal of surplus soil from the site upto 15 meter distance complete in all respects.
Dismantling/taking out AC/PVC Pipe from trench as per site.
Relaying of dismantled Water supply line, fixing & jointing of P.V.C. Pipes as per ISI-4985 (ISI marked with the prior approval of Engineer-in-Charge) along the Trenches and laying the same in Trenches to correct alignment and gradients, cutting, jointing and testing complete as per specifications. 90mm o/d pipe of 6 Kgf. / sqcm
With New material @ 40%
With old material @ 60%
Extra for Providing & fixing specials @ 5% of pipe cost.
HARJEET SINGH
SUPER INDUSTRIAL CORPORATION
Oberoi Construction Corporation
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .