Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.0 LAdmitted-Finance | -36.50% | ₹5.0 L | L1 | Admitted-Finance |
| 2 | L2₹5.2 LAdmitted-Finance | -34.90% | ₹5.2 L | L2 | Admitted-Finance |
| 3 | L3₹5.2 LAdmitted-Finance | -34.50% | ₹5.2 L | L3 | Admitted-Finance |
| 4 | L4₹5.3 LAdmitted-Finance | -32.50% | ₹5.3 L | L4 | Admitted-Finance |
| 5 | L5₹5.4 LAdmitted-Finance | -32.10% | ₹5.4 L | L5 | Admitted-Finance |
Updated dates
Tender Value
₹7.9 L
EMD Value
₹15,840
Closing Date
1 Apr 2026, 2:00 pmClosed
General Manager (Works)
Office of Additional Chief Executive Officer, Shri Amarnathji Shrine Board, Jammu/Srinagar
Construction of paths between tentage sites and STP at Baltal including fencing of STP and stacking old.
2026_SASB_306420_2
SASB/eNIT/2026/04
Open Tender
Civil Works
30 days
Baltal Axis
Please refer Tender documents.
2 documents required · 2 mandatory
₹944
J and K Bank 0110040100014077
₹15,840
18 Apr 2026
19 Mar 2026
2 Apr 2026
19 Mar 2026
1 Apr 2026
19 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Engagement of labour for dismantling of existing SASB fencing with angles and barbed wires and stacking it at SASB store as per direction of Engineer-in-charge. | |||||
| 2Engagement of labour for erection with repairs including fixing of poles and tightening with binding wires and alike of barbed wire fencing in 7 horizontal rows and poles at 2.4m apart and 0.60m deep at ground from existing material including carriage of material to site from store. | |||||
| 3Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth All kinds of soil | |||||
| 4Providing and laying in position cement concrete of specified grade including curing excluding cost of centring and shuttering all works up to plinth level.1:4:8(1 cement :4 coarse sand : 8 graded stone aggregate 40 mm nominal size) nallah stone | |||||
| 5Chequerred precast cement concrete tiles 22mm thick in footpath and courtyard, jointed with neat cement slurry mixed with pigment to match the shade of the tiles, including rubbing, cleaning and curing complete, on 20 mm thick bed of cement mortar 1:4 ( 1 cement : 4 coarse sand) . Dark shade using ordinary cement. | |||||
| 6Carriage of material by MT to site from source at 70 Km. | |||||
stage.html
html • 0.04 MB
techsummary_994919.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.23 MB
BOQ_994919.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid