Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.9 LAccepted-AOC | L1 | Accepted-AOC accepted | |
| 2 | L2₹6.0 L+₹6,918.48 (1.16%)Rejected-Finance | L2 | Rejected-Finance HIGHEST RATE REJECTED | |
| 3 | L3₹6.6 L+₹63,887.48 (10.8%)Rejected-Finance | L3 | Rejected-Finance HIGHEST RATE REJECTED | |
| 4 | L4₹6.6 L+₹63,887.48 (10.8%)Rejected-Finance | L4 | Rejected-Finance HIGHEST RATE REJECTED | |
| 5 | L5₹6.9 L+₹96,615.65 (16.3%)Rejected-Finance | L5 | Rejected-Finance HIGHEST RATE REJECTED |
| Sl No | Description | Qty | Unit | Manoharan Kanjamalai L3 | Nithesh L1 | N PALANIVEL L6 | Aravinth builders L2 | vinotha L5 | sri gokul nidhi construction L4 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00Construction of Passenger Shelter at Kaikatti in Sattanathapuram Panchayat | |||||||||
| 2.00 | Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification | 14.63 | cum | 250 ₹3,657.5 | 212 ₹3,101.56 | 263 ₹3,847.69 | 200 ₹2,926 Lowest | 263 ₹3,847.69 | 259 ₹3,789.17 |
| 3.00 | Supplying and filling in basement with filling M sand in layer of not more than 15 cm thick well rammed etc., complete. | 7.04 | cum | 2,500 ₹17,600 | 1,700 ₹11,968 Lowest | 2,540 ₹17,881.6 | 2,000 ₹14,080 | 2,540 ₹17,881.6 | 2,490 ₹17,529.6 |
| 4.00 | Cement concrete 1:4:8 mix ( one cement four sand and eight aggregate) using 40mm gauge hand broken granite tone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying with standard specfication | 4.53 | cum | 6,100 ₹27,633 | 5,525 ₹25,028.25 Lowest | 6,430 ₹29,127.9 | 6,000 ₹27,180 | 6,430 ₹29,127.9 | 6,300 ₹28,539 |
| 5.00 | Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete | 6.57 | cum | 10,000 ₹65,700 | 6,376 ₹41,890.32 Lowest | 10,151 ₹66,692.07 | 8,500 ₹55,845 | 10,151 ₹66,692.07 | 9,948 ₹65,358.36 |
| 6.00 | Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete | 4.88 | cum | 10,000 ₹48,800 | 7,651 ₹37,336.88 Lowest | 10,292 ₹50,224.96 | 9,000 ₹43,920 | 10,292 ₹50,224.96 | 10,087 ₹49,224.56 |
| 7.00 | Brick work in cm 1:5 mix(one cement and five sand )using country bricks ground maded of size 23 x 11 x 7 cm including curing,finishing and cost & Conveyance of all materials etc., complete. | 5.06 | cum | 6,150 ₹31,119 | 5,300 ₹26,818 Lowest | 6,279 ₹31,771.74 | 5,800 ₹29,348 | 6,279 ₹31,771.74 | 6,154 ₹31,139.24 |
| 8.00 | Brick work in cm 1:5 mix(one cement and five sand )using country bricks ground maded of size 23 x 11 x 7 cm including curing,finishing and cost & Conveyance of all materials etc., complete. | 7.12 | cum | 6,200 ₹44,144 | 5,500 ₹39,160 Lowest | 6,372 ₹45,368.64 | 5,800 ₹41,296 | 6,372 ₹45,368.64 | 6,244 ₹44,457.28 |
| 9.00 | Supplying and erecting centering for sides Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm x 60cm x and B.G 10 stiffened with M.S angles of size 25mm x 25mm x '3mm laid over silver Oak (C.W) joists of size 10cm x 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification.SUTTERING | 44.1 | SQM | 500 ₹22,050 | 496 ₹21,873.6 | 550 ₹24,255 | 450 ₹19,845 Lowest | 550 ₹24,255 | 537 ₹23,681.7 |
| 10.00 | Supplying and erecting centering for sides Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm x 60cm x and B.G 10 stiffened with M.S angles of size 25mm x 25mm x '3mm laid over silver Oak (C.W) joists of size 10cm x 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification. CENTERING | 25.13 | SQM | 1,000 ₹25,130 | 950 ₹23,873.5 Lowest | 1,095 ₹27,517.35 | 1,000 ₹25,130 | 1,095 ₹27,517.35 | 1,073 ₹26,964.49 |
Tender Value
₹7 L
EMD Value
₹7,000
Closing Date
28 Oct 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
block development office sirkali BP
block development office sirkali BP
Construction of Passenger Shelter at Kaikatti in Sattanathapuram Panchayat
2026_RDTN_711411_1
2364/2026/A4 05.10.2026
Open Tender
Civil Works
Item Rate
block development office sirkali
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹7,000
Yes
23 Nov 2026
6 Oct 2026
28 Oct 2026
7 Oct 2026
28 Oct 2026
9 Oct 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Passenger Shelter at Kaikatti in Sattanathapuram Panchayat | - | - | - | - |
| 2 | Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification | 14.63 | cum | 263.78 | ₹3,859.1 |
| 3 | Supplying and filling in basement with filling M sand in layer of not more than 15 cm thick well rammed etc., complete. | 7.04 | cum | 2,540.95 | ₹17,888.29 |
| 4 | Cement concrete 1:4:8 mix ( one cement four sand and eight aggregate) using 40mm gauge hand broken granite tone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying with standard specfication | 4.53 | cum | 6,430.22 | ₹29,128.9 |
| 5 | Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete | 6.57 | cum | 10,151.92 | ₹66,698.11 |
| 6 | Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete | 4.88 | cum | 10,292.99 | ₹50,229.79 |
| 7 | Brick work in cm 1:5 mix(one cement and five sand )using country bricks ground maded of size 23 x 11 x 7 cm including curing,finishing and cost & Conveyance of all materials etc., complete. | 5.06 | cum | 6,279.3 | ₹31,773.26 |
| 8 | Brick work in cm 1:5 mix(one cement and five sand )using country bricks ground maded of size 23 x 11 x 7 cm including curing,finishing and cost & Conveyance of all materials etc., complete. | 7.12 | cum | 6,372.17 | ₹45,369.85 |
| 9 | Supplying and erecting centering for sides Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm x 60cm x and B.G 10 stiffened with M.S angles of size 25mm x 25mm x '3mm laid over silver Oak (C.W) joists of size 10cm x 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification.SUTTERING | 44.1 | SQM | 547.5 | ₹24,144.75 |
| 10 | Supplying and erecting centering for sides Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm x 60cm x and B.G 10 stiffened with M.S angles of size 25mm x 25mm x '3mm laid over silver Oak (C.W) joists of size 10cm x 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification. CENTERING | 25.13 | SQM | 1,095 | ₹27,517.35 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.44 MB
pricebid.pdf
Tender Documents • 0.40 MB
Technicalbid.pdf
Tender Documents • 1.05 MB
BOQ_854682.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .