Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.9 LAccepted-Finance | L1 | Accepted-Finance Paper Complete | |
| 2 | L2₹12.0 L+₹15,478.32 (1.30%)Accepted-Finance 99 SUSHILA BIHAR BHUD BULANDSHAHAR | L2 | Accepted-Finance Paper Complete | |
| 3 | L3₹12.1 L+₹19,050.24 (1.60%)Accepted-Finance D 151 SHYAM PARK EXTENSION SAHIBABAD GHAZIABAD | GHAZIABAD | GHAZIABAD | UTTAR PRADESH | L3 | Accepted-Finance Paper Complete |
Tender Value
₹11.9 L
EMD Value
₹1.2 L
Closing Date
12 Oct 2026, 5:00 pmClosed
Executive Office
Executive Officer Nagar Palika Parishad Bulandshah
10workTender00007
2026_DOLBU_1193024_1
595 Date 05-10-2026
Open Tender
Civil Works
Percentage
90 days
Executive Officer Nagar Palika Parishad Bulandshah
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,416
Executive Officer Nagar Palika Parishad Bulandshah
₹1.2 L
16 Oct 2026
6 Oct 2026
13 Oct 2026
6 Oct 2026
12 Oct 2026
6 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling Of old damaged Brick work in cement mortar | 4.97 | cum | 600 | ₹2,982 |
| 2 | Excavation work for of Soil including, lift upto 1.50 M and lead Upto 30m | 162 | cum | 132 | ₹21,384 |
| 3 | Cement Concrete with 2cm gauge brick ballast fine sand & cement proportion of 1:4:8 Complete work as per S.I. No. 281 | 16.2 | cum | 6,100 | ₹98,820 |
| 4 | RCC Work with cement, approved coarse sand and 2 cm gauge approved stone grit in proportions of 1:1.5:3 in Raft foundation and Footing | 16.2 | cum | 8,100 | ₹1,31,220 |
| 5 | RCC Work with cement, approved coarse sand and 2 cm gauge approved stone grit in proportions of 1:1.5:3 in Column or Wall | 28.8 | cum | 9,310 | ₹2,68,128 |
| 6 | RCC Work with cement, approved coarse sand and 2 cm gauge approved stone grit in proportions of 1:1.5:3 in Slab | 11.88 | cum | 9,030 | ₹1,07,276.4 |
| 7 | Supply, Fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and technical specifications including supply of all material, labour, Tools & Plants etc. required for proper completion of work | 39.5 | Qtl | 8,631 | ₹3,40,924.5 |
| 8 | Providing & Fixing of 110mm Internal dia P.V.C.pipe pressure of 6Kg/ Cm2 | 18 | Rm | 190 | ₹3,420 |
| 9 | Cartage for disposal of malba/Surpluse earth upto 5.0Km | 97.2 | Cum | 183.5 | ₹17,836.2 |
| 10 | Providing cost of dewatering including cost of boaring, laying of 4'' dia PVC pipe, Hire charges of 7.50 KV Deisel pumping Set, Hire Charges of PVC pipe & cost of 4'' dia plastic pipe for disposal of water as required distance also including wages of repairing leakage during operation with hire charges of tractor including loading and unloading of pumping set. | 50 | Hrm | 250 | ₹12,500 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 13.00 MB
BOQ_2251816.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .