Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹9.4 LAccepted-AOC B M DASAR WARD NO 6 TUKDOJI NAGAR GHUGUS TAH DIST CHANDRAPUR | GHUGUS | CHANDRAPUR | MAHARASHTRA | 442505 | 1 | Accepted-AOC Lowest amount quoted | |
| 2 | Rejected-Technical C O SUNIL DHABEKAR WARD NO 6 GHUGUS TAH DIST CHANDRAPUR GHUGUS 442505 | CHANDRAPUR | CHANDRAPUR | MAHARASHTRA | 442505 | - | Rejected-Technical Amount quoted is higher than L1 |
Tender Value
₹13.6 L
EMD Value
₹17,000
Closing Date
1 Mar 2023, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
G. DEVARAJAN
AGM office Wani Area Chandrapur
Shifting of weigh bridge No. 02 near weigh bridge No. 03 and 04 at Penganga OCP of Wani Area.
2023_WCL_271006_1
WCL wa4350-civ-e037-2022-23/791
Open Tender
Civil Works - Others
Item Rate
60 days
AGM office Wani Area Chandrapur
Please refer Tender documents.
3 documents required · 3 mandatory
₹17,000
26 Mar 2023
13 Feb 2023
2 Mar 2023
13 Feb 2023
1 Mar 2023
14 Feb 2023
13 Feb 2023 - 20 Feb 2023
Amount
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. All kinds of soil
Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete.
Granular Sub-base with Well Graded Material (CBR>30 or more) (Table:- 400-1 & Table 400-2) Construction of granular sub-base by providing well graded material like natural sand crushed gravel or crushed stone having CBR >30, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator or plant mix method at OMC, and compacting with vibratory rollers of 80 to 100 kN static weight to achieve the desired density, complete as per Clause 401 of Specification.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources: 6 graded stone aggregate 40 mm nominal size derived from natural sources).
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources).
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, ifnishing and reinforcement- All work up to plinth level : 1:1.5:3 (1 cement: 1.5 coarse sand (zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources).
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources).
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more.
Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete
Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts
Centering and shuttering including strutting, propping etc. and removal of form for Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
Total impact of GST for the purpose of CTC
Sunil Kumar Sharma
stage.html
html • 0.04 MB
techsummary_280410.pdf
PDF • 1.18 MB
finsummary_280410.pdf
PDF • 1.18 MB
PNGP200.pdf
PDF • 1.18 MB
finance_280410.pdf
PDF • 0.10 MB
BOQ Comparative Chart
xlsx • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .