Loading…
Loading…
Tender Value
₹4.9 L
EMD Value
₹9,818
Closing Date
28 Aug 2026, 1:30 pm5d left
EE PWD HD
ONKARMAL JETIA ROAD HOWRAH
Emergent work of S B Barrack rooms around Nabanna premises during the year 2026-27
2026_WBPWD_5019390_3
WBPWD/EE/HD/NIeT31/2026/27
Open Tender
CIVIL WORKS
Percentage
21 days
HOWRAH
Referred to Tender Documents.
4 documents required · 4 mandatory
₹9,818
21 Aug 2026
21 Aug 2026
31 Aug 2026
21 Aug 2026
28 Aug 2026
21 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 2.8
Earth work in excavation by mechanical means (Hydraulic excavator)
/ manual means in foundation trenches or drains (not exceeding 1.5 m
in width or 10 sqm on plan), including dressing of sides and ramming of
bottoms, for all lift, including getting out the excavated soil and disposal
of surplus excavated soil as directed, within a lead of 50 m.
2.8.1
All kinds of soil. | 1 | cu.m | 260.3 | ₹260.04 |
| 2 | 2.38
Filling with available fly ash and earth (excluding rock) in trenches or
embankment in layers (each layer should not exceed 15 cm), with
intermediate layer of compacted earth (Soil density of 98%) after every
four layers of compacted depth of fly ash, sides & top layer of filling shall
be done with earth having total minimum compacted thickness 30 cm or
as decided by Engineer -in-charge, including compacting each layer by
rolling/ ramming and watering, all complete as per drawing and direction
of Engineer -in - charge. | - | cu.m | 308.2 | - |
| 3 | 11.2
Dry brick on edge flooring in required pattern with bricks of class
designation 7.5 on a bed of 12 mm mud mortar, including filling joints with
Jamuna sand, with common burnt clay non modular bricks. | 1 | sq.m | 792.05 | ₹791.26 |
| 4 | 4.1
Providing and laying in position cement concrete of specified grade
excluding the cost of centering and shuttering - All work up to plinth
level : 4.1.3
1:2:4 (1 cement : 2 coarse sand (zone-III) derived from
natural sources : 4 graded stone aggregate 20 mm nominal
size derived from natural sources) | - | cu.m | 7,878.5 | - |
| 5 | 6.1
Brick work with common burnt clay F.P.S. (non modular) bricks of class
designation 7.5 in foundation and plinth in:
6.1.2
Cement mortar 1:6 (1 cement : 6 coarse sand) | - | cu.m | 7,132.25 | - |
| 6 | 6.4
Brick work with common burnt clay F.P.S. (non modular) bricks of class
designation 7.5 in superstructure above plinth level up to floor V level in
all shapes and sizes in :
6.4.2
Cement mortar 1:6 (1 cement : 6 coarse sand) | 1 | cu.m | 9,105.95 | ₹9,096.84 |
| 7 | 13.6
20 mm cement plaster of mix :
13.6.2
1:6 (1 cement: 6 coarse sand) | 1 | sq.m | 466.05 | ₹466 |
| 8 | Using correction factor on DSR-2023 on account of GST @ 0.973 | - | unit | 1 | - |
| 9 | Cost Index @ 22.00% on DPAR'2023 items | - | unit | 0.23 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.38 MB
Tendernotice_2.pdf
PDF • 0.57 MB
BOQ_5091682.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].