Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.6 LAccepted-AOC | ₹10.6 L | L1 | Accepted-AOC Lottery Winner L1 |
| 2 | L1₹10.6 LRejected-AOC | ₹10.6 L | L1 | Rejected-AOC L1 |
| 3 | L1₹10.6 LRejected-AOC | ₹10.6 L | L1 | Rejected-AOC L1 |
| 4 | L1₹10.6 LRejected-AOC C CLASS CONTRACTOR | NA | NA | 121004 | ₹10.6 L | L1 | Rejected-AOC L1 |
| 5 | L1₹10.6 LRejected-AOC | ₹10.6 L | L1 | Rejected-AOC L1 |
Tender Value
₹10.7 L
EMD Value
₹10,657
Closing Date
10 Aug 2026, 5:30 pmClosed
Project Administrator, ITDA, Rairangpur
At-Ward No-03, Mandir Sahi, PO/PS-Rairangpur, Dist-Mayurbhanj
Repair and Renovation of the 300 seated Boys Hostels at DL College Bahalda under Bahalda Block.
2026_STSCD_137056_11
BidIdentificationNo02/2026-27
Open Tender
Civil Works - Buildings
Percentage
90 days
DL College Bahalda
As per DTCN.
2 documents required · 2 mandatory
₹6,000
₹10,657
Yes
13 Sept 2026
27 Jul 2026
11 Aug 2026
27 Jul 2026
10 Aug 2026
27 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Removing old lime or cement plaster from walls including racking joints 12 mm. deep and removing debries withn in 50 meters lead. Ground Floor | 0.8 | Sqm. | 58.95 | ₹47.16 |
| 2 | First Floor | 0.8 | Sqm. | 86.09 | ₹68.87 |
| 3 | Dismantling and removing old tile flooring including removing the base coarse and stacking the usful materials for reuse etc.coomplete (A/R Page-223 , item No.28) Ground Floor | 0.4 | Sqm. | 275.55 | ₹109.94 |
| 4 | First Floor | 0.4 | Sqm. | 402.4 | ₹160.56 |
| 5 | Dismantling and removing 2.5 cm thick grading concrete from roof slab cleaning the surface lowering and removing the debris within 50 m lead etc complete Ground Floor | 31.42 | Sqm. | 132.65 | ₹4,168.26 |
| 6 | First Floor | 67.61 | Sqm. | 193.72 | ₹13,097.02 |
| 7 | 2.5cm thick grading concrete (1:2:2) on roof slab using 6mm size hard granite chips including watering, curing etc.complete Ground Floor | 31.42 | Sqm. | 384.9 | ₹12,094.71 |
| 8 | First Floor | 67.61 | Sqm. | 425.35 | ₹28,757.06 |
| 9 | 12mm thick cement plaster in (1:6) for Brick work including cost of conveyance, royalty ,curing and all cost of materials and labours….etc completed. Ground Floor | 86.4 | Sqm. | 189.3 | ₹16,354.95 |
| 10 | First Floor | 86.4 | Sqm. | 194.05 | ₹16,765.34 |
stage.html
html • 0.16 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_603323.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.53 MB
DTCN2.pdf
Tender Documents • 1.07 MB
BOQ_603323.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .