Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.3 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹1.4 L+₹11,326.64 (8.63%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹1.5 L+₹14,162.05 (10.8%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹1.5 L+₹18,752.72 (14.3%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.5 L
EMD Value
₹4,500
Closing Date
6 Oct 2026, 6:00 pmClosed
office of the executive engineer rew angoffice of
office of the executive engineer rew ang
C/O FENCING OF GRAVEYARD NEAR ZIYARAT AKHOON SHAH BLOCK VERINAG
2026_RDPR_326277_51
ENIT118of2026-27
Open Tender
Civil Works
Percentage
30 days
anantnag
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
office of the executive engineer rew ang
₹4,500
9 Oct 2026
29 Sept 2026
7 Oct 2026
29 Sept 2026
6 Oct 2026
29 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Surface Dressing of the ground including removing vegetation and in-equalities not exceeding 15cm deep and disposal of rubbish, lead upto 50m and lift upto 1.5m in all kinds of soil | 56 | Sqm | 24.12 | ₹1,350.72 |
| 2 | P/L cement concrete of specified grade excluding the cost of centering & shuttering using M15. (1:2:4) and by using 20 mm | 2.29 | Cum | 6,591.25 | ₹15,093.96 |
| 3 | BRICK WORK WITH COMMON BURNT CLAY BRICKS FPS OF CLASS DESIGNATION 75 IN FOUNDATION & plinth in cement mortor 1: 6 mix | 3.43 | Cum | 7,571.55 | ₹25,970.42 |
| 4 | Extra for Brick work with common burnt clay bricks in Superstucture above plinth level | 3.43 | Cum | 1,455.65 | ₹4,992.88 |
| 5 | Structural Steel Work in Built Up Sections Incld Cutting Bending Hoisting complete job incld to coats of enamel paint | 677.16 | Kgs | 138.2 | ₹93,583.51 |
| 7 | P/F Centring and shuttering including strutting, propping etc. and removal of formwork complete job | 11.1 | Sqm | 286.35 | ₹3,178.49 |
| 8 | Carriage of material by MT of 30 KMs | 3.12 | Cum | 504.96 | ₹1,575.48 |
| 9 | Bricks | 1,630 | No. | 2.01 | ₹3,276.3 |
| 10 | Add Provision for Sign Board photos & carriage of Cement unforseen items etc | 1 | LS | 1,000 | ₹1,000 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.60 MB
BOQ_1104141.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .