Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹36.4 LAccepted-AOC 7TH MILE UPPER SHILLONG P O NONGLYER SHILLONG MEGHALAYA | EAST KHASI HILLS | MEGHALAYA | 793009 | L1 | Accepted-AOC Awarded | |
| 2 | L2₹38.6 L+₹2.2 L (6.16%)Rejected-Finance 7TH MILE UPPER SHILLONG P O NONGLYER SHILLONG MEGHALAYA | EAST KHASI HILLS | MEGHALAYA | 793009 | L2 | Rejected-Finance Being L2 | |
| 3 | L3₹41.0 L+₹4.6 L (12.7%)Rejected-Finance C O M KHARKARANG LUMJINGSUK BLOCK A MADANRTING SHILLONG 793021 | SHILLONG | EAST KHASI HILLS | MEGHALAYA | 793021 | L3 | Rejected-Finance Being L3 | |
| 4 | L4₹47.3 L+₹10.9 L (30.1%)Rejected-Finance | L4 | Rejected-Finance Being L4 | |
| 5 | L5₹48.2 L+₹11.8 L (32.5%)Rejected-Finance LAMA VILLA DYMMIEW SHILLONG 793002 | EAST KHASI HILLS | MEGHALAYA | 793002 | L5 | Rejected-Finance Being L5 |
| Sl No | Description | Qty | Unit | H K Enterprise L7 | M/S BISWA CONSTRUCTION L1 | M/S DEEDAR ENTERPRISE L6 | Bhuiya Construction L3 | M/S SKYSCRAPER CONSTRUCTION L4 | M/S DIL SINGH BISWA AND CO L5 | M/S RAGHU NATH SAH L2 | madan enterprise L9 | M/s J. C. CONSTRUCTION L8 | R K ENGINEERING ASSEMBLE L10 | M S Umesh and Co L11 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Surface excavation n.exc (not exceeding) 30 cm deep and averaging 15cm deep and getting out complete all as specified and directed. | 150 | Sqm | 35 ₹5,250 Lowest | 100 ₹15,000 | 45 ₹6,750 | 40 ₹6,000 | 55 ₹8,250 | 70 ₹10,500 | 50 ₹7,500 | 60 ₹9,000 | 48 ₹7,200 | 65 ₹9,750 | 62 ₹9,300 |
| 2.00 | Excavating in trenches, n exc 1.5 m wide and n exc 1.5 m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. n exc 10 sq m on plan and n exc 1.5 m in depth and getting out complete all as specified and as directed . | 125.16 | Cum | 340 ₹42,554.4 Lowest | 700 ₹87,612 | 575 ₹71,967 | 450 ₹56,322 | 567 ₹70,965.72 | 455 ₹56,947.8 | 400 ₹50,064 | 500 ₹62,580 | 490 ₹61,328.4 | 620 ₹77,599.2 | 700 ₹87,612 |
| 3.00 | Material and labour for broken stone boulders Hardcore of gauge n exc. 63 mm, deposited, spread and levelled in layers n exc. 15 cm thick, watered and rammed to a true surface complete all as specified and directed. | 10 | Cum | 2,345 ₹23,450 Lowest | 2,800 ₹28,000 | 3,120 ₹31,200 | 2,700 ₹27,000 | 3,240 ₹32,400 | 3,300 ₹33,000 | 2,500 ₹25,000 | 3,100 ₹31,000 | 2,800 ₹28,000 | 3,300 ₹33,000 | 3,320 ₹33,200 |
| 4.00 | M & L for PCC 1:4:8 type D-2 using 40mm graded stone aggregate as in foundation, filling and mass concrete complete all as specified and directed. | 10 | Cum | 6,000 ₹60,000 | 5,000 ₹50,000 | 8,770 ₹87,700 | 6,000 ₹60,000 | 9,700 ₹97,000 | 7,980 ₹79,800 | 4,900 ₹49,000 Lowest | 9,700 ₹97,000 | 7,500 ₹75,000 | 8,900 ₹89,000 | 7,980 ₹79,800 |
| 5.00 | Material and labour for 75mm thick cement concrete 1:2:4 type B2 using 40 mm graded stone aggregates as in sub base complete all as specified and directed. | 150 | Sqm | 400 ₹60,000 Lowest | 650 ₹97,500 | 1,129 ₹1,69,350 | 700 ₹1,05,000 | 1,160 ₹1,74,000 | 780 ₹1,17,000 | 450 ₹67,500 | 1,100 ₹1,65,000 | 900 ₹1,35,000 | 1,300 ₹1,95,000 | 780 ₹1,17,000 |
| 6.00 | Supply and fix 110mm dia PVC (SWR) pipes single socketed in any length with rubber ring joints, laid in trenches or in floors complete all as specified and directed. | 20 | Rm | 500 ₹10,000 | 400 ₹8,000 | 444 ₹8,880 | 450 ₹9,000 | 450 ₹9,000 | 500 ₹10,000 | 150 ₹3,000 Lowest | 440 ₹8,800 | 470 ₹9,400 | 450 ₹9,000 | 500 ₹10,000 |
| 7.00 | Material and labour for machine pressed precast concrete interlocking paver block of approved quality set & jointed in cement slurry and pointed in grey cement and no pigment to match confirming to IS 15658-2006 of 80 mm thickness, M-40 Grade including 25 mm thick sand cushioning complete all as specified and directed. | 150 | Sqm | 2,100 ₹3,15,000 | 1,650 ₹2,47,500 | 2,133 ₹3,19,950 | 1,800 ₹2,70,000 | 2,000 ₹3,00,000 | 2,018 ₹3,02,700 | 1,300 ₹1,95,000 Lowest | 2,200 ₹3,30,000 | 2,250 ₹3,37,500 | 2,100 ₹3,15,000 | 2,212 ₹3,31,800 |
| 8.00 | Material and labour for applying two or more coats of 100% premium acrylic emulsion paint having VOC less than 50gm/litre and UV resistance as per IS-15489:2004, Alkali & fungal resistance, dirt resistance exterior paint of required shade (Company Depot Tinted) with silicon additives @1.43 litre/10 Sqm over and including priming coat of exterior primer applied @ 0.90 litre/10 Sqm over new surfaces. | 50 | Sqm | 380 ₹19,000 | 135 ₹6,750 | 289 ₹14,450 | 300 ₹15,000 | 300 ₹15,000 | 290 ₹14,500 | 90 ₹4,500 Lowest | 290 ₹14,500 | 290 ₹14,500 | 300 ₹15,000 | 290 ₹14,500 |
| 9.00 | Material and labour for TMT bars 10 mm dia and over, cut to length, bent to shape required, including cranking, bending spirally for hooping for columns, hooking ends and binding with and including mild steel wire (annealed) not less than 0.9 mm dia or securing with clips, complete all as specified and directed. | 250 | Kg | 115 ₹28,750 | 100 ₹25,000 Lowest | 110 ₹27,500 | 120 ₹30,000 | 125 ₹31,250 | 128 ₹32,000 | 160 ₹40,000 | 119 ₹29,750 | 130 ₹32,500 | 125 ₹31,250 | 126 ₹31,500 |
| 10.00 | Material and labour for TMT bars 5 mm dia and over upto and including 10 mm dia in stirrups, spacers & binders, cut to length, bent to shapes required, including cranking, bending spirally for hooping for columns, hooking ends and binding with and including mild steel wire (annealed) not less than 0.9mm dia or securing with clips complete all as specified and directed. | 200 | Kg | 115 ₹23,000 | 100 ₹20,000 Lowest | 110 ₹22,000 | 120 ₹24,000 | 125 ₹25,000 | 128 ₹25,600 | 170 ₹34,000 | 119 ₹23,800 | 130 ₹26,000 | 125 ₹25,000 | 126 ₹25,200 |
Tender Value
₹43.0 L
EMD Value
₹85,900
Closing Date
11 Oct 2025, 6:00 pmClosed
GE I AF SHILLONG
GE (I) (AF) Shillong Elephant Falls Camp PO Nonglyer Shillong-793009
PROVN OF OVERHEAD WATER FILLING POINT FOR FIRE TENDER AND ALLIED WORKS AT AF STN LAITKOR PEAK
2025_MES_730744_1
8101/24/E8
Open Tender
Civil Works
Item Rate
180 days
GE I AF Shillong
Please refer Tender documents.
9 documents required · 9 mandatory
₹500
GE I AF SHILLONG
₹85,900
Yes
13 Nov 2025
13 Sept 2025
13 Oct 2025
13 Sept 2025
11 Oct 2025
4 Oct 2025
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .