SEKAR HIRUDHAYAM
TECHNIP ENERGIES INDIA LIMITED, CHENNAI
SUPPLY OF API 610 PUMPS FOR LPGTU AND OFFSITE UTILITY FOR NUMALIGARH REFINERY EXPANSION PROJECT
2022_NRL_693106_2
TP/082176C/NRL/PQ/044
Open Tender
Mechanical Tools and Equipment
Supply
300 days
NUMALIGARH
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
Exempted
13 Apr 2023
5 Dec 2022
26 Dec 2022
5 Dec 2022
24 Dec 2022
13 Dec 2022
5 Dec 2022 - 7 Dec 2022
Design, Engineering, Procurement, Manufacturing, Packaging, Inspection,Testing, transportation, Road survey (If required) of RICH AMINE PUMP (1P38 PA 9601 A/B) with accessories, Commissioning spares,Special Tools, Drawing and documents as per vendor data requirement in Part II of SR, First fill of all lubricants (oil, grease) and barrier fluid as required and consumables, required for pre-commissioning, trial runs and six months continuous running and Training for Owner's Engineers at site.
Design, Engineering, Procurement, Manufacturing, Packaging, Inspection,Testing, transportation, Road survey (If required) of LEAN AMINE BOOSTER PUMP (1P38-PA-9501 A/B) with accessories, Commissioning spares,Special Tools, Drawing and documents as per vendor data requirement in Part II of SR, First fill of all lubricants (oil, grease) and barrier fluid as required and consumables, required for pre-commissioning, trial runs and six months continuous running and Training for Owner's Engineers at site.
Design, Engineering, Procurement, Manufacturing, Packaging, Inspection,Testing, transportation, Road survey (If required) of SPENT CAUSTIC PUMP (1P38-PA-8801 A/B) with accessories, Commissioning spares,Special Tools, Drawing and documents as per vendor data requirement in Part II of SR, First fill of all lubricants (oil, grease) and barrier fluid as required and consumables , required for pre-commissioning, trial runs and six months continuous running and Training for Owner's Engineers at site.
Design, Engineering, Procurement, Manufacturing, Packaging, Inspection,Testing, transportation, Road survey (If required) of OXIDIZED CAUSTIC PUMP (1P38-PA-8703 A/B) with accessories, Commissioning spares,Special Tools, Drawing and documents as per vendor data requirement in Part II of SR, First fill of all lubricants (oil, grease) and barrier fluid as required and consumables , required for pre-commissioning, trial runs and six months continuous running and Training for Owner's Engineers at site.
Design, Engineering, Procurement, Manufacturing, Packaging, Inspection,Testing, transportation, Road survey (If required) of REGENERATED CAUSTIC CIRCULATION PUMP (1P38-PA-8702 A/B) with accessories, Commissioning spares,Special Tools, Drawing and documents as per vendor data requirement in Part II of SR, First fill of all lubricants (oil, grease) and barrier fluid as required and consumables , required for pre-commissioning, trial runs and six months continuous running and Training for Owner's Engineers at site.
Design, Engineering, Procurement, Manufacturing, Packaging, Inspection,Testing, transportation, Road survey (If required) of INTERSTAGE CAUSTIC CIRCULATION PUMP (1P38-PA-8701 A/B) with accessories, Commissioning spares,Special Tools, Drawing and documents as per vendor data requirement in Part II of SR , First fill of all lubricants (oil, grease) and barrier fluid as required and consumables , required for pre-commissioning, trial runs and six months continuous running and Training for Owner's Engineers at site.
Design, Engineering, Procurement, Manufacturing, Packaging, Inspection,Testing, transportation, Road survey (If required) of CLOSED CAUSTIC BLOWDOWN PUMP (1P38-PA-7001 A/B) with accessories, Commissioning spares,Special Tools, Drawing and documents as per vendor data requirement in Part of SR , First fill of all lubricants (oil, grease) and barrier fluid as required and consumables , required for pre-commissioning, trial runs and six months continuous running and Training for Owner's Engineers at site.
Design, Engineering, Procurement, Manufacturing, Packaging, Inspection,Testing, transportation, Road survey (If required) of SOLVENT CIRCULATION PUMP (1P38-PA-1201 A/B) with accessories, Commissioning spares,Special Tools, Drawing and documents as per vendor data requirement in Part of SR, First fill of all lubricants (oil, grease) and barrier fluid as required and consumables , required for pre-commissioning, trial runs and six months continuous running and Training for Owner's Engineers at site.
Design, Engineering, Procurement, Manufacturing, Packaging, Inspection,Testing, transportation, Road survey (If required) of OCTANE BOOSTER PUMPS (1S75-PA-9311 A/B) with accessories, Commissioning spares,Special Tools, Drawing and documents as per vendor data requirement in Part II of SR , and First fill of all lubricants (oil, grease) and barrier fluid as required and consumables , required for pre-commissioning, trial runs and six months continuous running.
Design, Engineering, Procurement, Manufacturing, Packaging, Inspection,Testing, transportation, Road survey (If required) of HGU NAPTHA FEED PUMP5 (1S72-PA-1212 / 1213) with accessories, Commissioning spares,Special Tools, Drawing and documents as per vendor data requirement in Part II of SR , First fill of all lubricants (oil, grease) and barrier fluid as required and consumables , required for pre-commissioning, trial runs and six months continuous running and Training for Owner's Engineers at site.
Design, Engineering, Procurement, Manufacturing, Packaging, Inspection,Testing, transportation, Road survey (If required) of HGU LPG FEED PUMP (1S76-PA-1003 A/B) with accessories, Commissioning spares,Special Tools, Drawing and documents as per vendor data requirement in Part II of SR , First fill of all lubricants (oil, grease) and barrier fluid as required and consumables, required for pre-commissioning, trial runs and six months continuous running and Training for Owner's Engineers at site.
Design, Engineering, Procurement, Manufacturing, Packaging, Inspection,Testing, transportation, Road survey (If required) of LPG TRANSFER PUMP (1S76-PA-1004 A/B) with accessories, Commissioning spares,Special Tools, Drawing and documents as per vendor data requirement in Part II of SR , First fill of all lubricants (oil, grease) and barrier fluid as required and consumables, required for pre-commissioning, trial runs and six months continuous running and Training for Owner's Engineers at site.
Design, Engineering, Procurement, Manufacturing, Packaging, Inspection,Testing, transportation, Road survey (If required) of LPG OFFSPEC TRANSFER PUMP (1S76-PA-1005 A/B) with accessories, Commissioning spares,Special Tools, Drawing and documents as per vendor data requirement in Part II of SR , First fill of all lubricants (oil, grease) and barrier fluid as required and consumables, required for pre-commissioning, trial runs and six months continuous running and Training for Owner's Engineers at site.
Design, Engineering, Procurement, Manufacturing, Packaging, Inspection,Testing, transportation, Road survey (If required) of MTBE PUMPS (1S75-PA-9313 A/B) with accessories, Commissioning spares,Special Tools, Drawing and documents as per vendor data requirement in Part II of SR , First fill of all lubricants (oil, grease) and barrier fluid as required and consumables, required for pre-commissioning, trial runs and six months continuous running and Training for Owner's Engineers at site.
Design, Engineering, Procurement, Manufacturing, Packaging, Inspection,Testing, transportation, Road survey (If required) of MAIN HC FLARE KOD PUMP (1U61-PA-6101 A/B) with accessories, Commissioning spares,Special Tools, Drawing and documents as per vendor data requirement in Part II of SR , First fill of all lubricants (oil, grease) and barrier fluid as required and consumables, required for pre-commissioning, trial runs and six months continuous running and Training for Owner's Engineers at site.
Design, Engineering, Procurement, Manufacturing, Packaging, Inspection,Testing, transportation, Road survey (If required) of MAIN ACID FLARE KOD PUMP (1U61-PA-6201-A/B) with accessories, Commissioning spares,Special Tools, Drawing and documents as per vendor data requirement in Part II of SR , First fill of all lubricants (oil, grease) and barrier fluid as required and consumables, required for pre-commissioning, trial runs and six months continuous running and Training for Owner's Engineers at site.
Kirloskar Ebara Pumps Limited
RUHRPUMPEN INDIA PRIVATE LIMITED
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .