Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.7 LAccepted-Finance | ₹5.7 L | L1 | Accepted-Finance LOW RATE |
| 2 | L2₹7.8 LRejected-Finance | ₹7.8 L | L2 | Rejected-Finance HIGH RATE |
| 3 | L3₹8.0 LRejected-Finance | ₹8.0 L | L3 | Rejected-Finance HIGH RATE |
| Sl No | Description | Qty | Unit | UMESH ELECTRICAL INFRASTRUCTURE L1 | CHANDRA CONSTRUCTION L3 | M/S D.K. CONSTRUCTION L2 |
|---|---|---|---|---|---|---|
| 1.00Supply of following Decentralized materials at the works site as per RESSPO norms | ||||||
| 1.01 | Stone pad 300x300x75 mm | 30 | No | 5 ₹150 | 20 ₹600 | 20 ₹600 |
| 1.02 | Top, Dropper channel clamp with bolts & nuts for PCC Pole | 120 | No | 100 ₹12,000 | 200 ₹24,000 | 220 ₹26,400 |
| 1.03 | E-bracket with nuts & bolts | 90 | No | 70 ₹6,300 | 200 ₹18,000 | 220 ₹19,800 |
| 1.04 | X-arm holding clamp with nuts & bolts | 30 | No | 100 ₹3,000 | 250 ₹7,500 | 220 ₹6,600 |
| 1.05 | All lugs 120 mm2 | 92 | No | 40 ₹3,680 | 35 ₹3,220 | 40 ₹3,680 |
| 1.06 | All lugs 70 mm2 | 16 | No | 30 ₹480 | 50 ₹800 | 40 ₹640 |
| 1.07 | Stay clamp with nut & bolts for PCC Pole | 60 | Set | 10 ₹600 | 190 ₹11,400 | 240 ₹14,400 |
| 1.08 | Stay Insulator | 60 | No | 5 ₹300 | 60 ₹3,600 | 140 ₹8,400 |
| 2.00Cartage of following materials from ESC, Mirzapur to work site including loading & unloading charge | ||||||
Tender Value
Refer Docs
EMD Value
₹7,700
Closing Date
29 Jun 2026, 2:00 pmClosed
SUPERINTENDING ENGINEER EDC MIRZAPUR
Fataha Mirzapur
Supply of De centralized materials increasing capacity of TF under Business Plan 2026 27 in EDD-Kachhawa Mirzapur
2026_PVVNV_1154670_3
14/EDC(M)/2026-27
Open Tender
Electrical Works
90 days
SUPERINTENDING ENGINEER EDC MIRZAPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
Executive Engineer(A)
₹7,700
1 Jul 2026
22 Jun 2026
30 Jun 2026
22 Jun 2026
29 Jun 2026
22 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Supply of following Decentralized materials at the works site as per RESSPO norms | |||||
| 1.01 | Stone pad 300x300x75 mm | 30 | No | 14 | ₹420 |
| 1.02 | Top, Dropper channel clamp with bolts & nuts for PCC Pole | 120 | No | 15 | ₹1,800 |
| 1.03 | E-bracket with nuts & bolts | 90 | No | 16 | ₹1,440 |
| 1.04 | X-arm holding clamp with nuts & bolts | 30 | No | 17 | ₹510 |
| 1.05 | All lugs 120 mm2 | 92 | No | 18 | ₹1,656 |
| 1.06 | All lugs 70 mm2 | 16 | No | 19 | ₹304 |
| 1.07 | Stay clamp with nut & bolts for PCC Pole | 60 | Set | 20 | ₹1,200 |
| 1.08 | Stay Insulator | 60 | No | 21 | ₹1,260 |
| 2Cartage of following materials from ESC, Mirzapur to work site including loading & unloading charge | |||||
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.45 MB
BOQ_2179815.xls
BOQ • 0.26 MB
TermsCondition.pdf
Tender Documents • 0.93 MB
Download all tender documents and submit your bid