Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.2 LAdmitted-Finance | +0.00% | ₹1.2 L | L1 | Admitted-Finance |
| 2 | L2₹1.2 L+₹2,312.63 (2.00%)Admitted-Finance | +2.00% | ₹1.2 L+₹2,312.63 (2.00%) | L2 | Admitted-Finance |
| 3 | L3₹1.2 L+₹5,781.57 (5.00%)Admitted-Finance | +5.00% | ₹1.2 L+₹5,781.57 (5.00%) | L3 | Admitted-Finance |
Tender Value
₹1.2 L
EMD Value
₹2,400
Closing Date
1 Sept 2026, 2:00 pmClosed
D.G.(S_D)
5, S.N. BANERJEE ROAD Kolkata-700 013
REPAIRING OF TILTED BOUNDARY WALL, PAINTING OF BOUNDARY WALL ALONG WITH RESTORATION OF THE DEPRESED COMPUND AT KABITIRTHA PUMPING STATION.
2026_KMC_1039148_1
KMC/(S_D)/DPS/26-27/02
Open Tender
CIVIL WORKS
Percentage
15 days
KABITIRTHA PUMPING STATION.
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹2,400
7 Sept 2026
25 Aug 2026
3 Sept 2026
25 Aug 2026
1 Sept 2026
25 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES
ETC. 1. Dismantling all types of masonry excepting cement concrete
plain or reinforced, stacking serviceable materials at site and
removing rubbish as directed within a lead of 75 m. (a) In ground floor including roof. | - | CUM | 447 | - |
| 2 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc A. BRICK
WORKS 7. Brick work with 1st class bricks in cement mortar (1:4) (a)In foundation and plinth. ( 3rd Corrigenda & addenda dated
04.06.2018) | 1 | CUM | 5,682 | ₹5,681.43 |
| 3 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc A. BRICK
WORKS 16. 125 mm. thick brick work with 1st class bricks in cement
mortar (1:4) in ground floor. ( 3rd Corrigenda & addenda dated
04.06.2018) | 1 | SQM | 736 | ₹735.93 |
| 4 | SECTION 1. ------------BUILDING WORKS (I) PLASTERING,
POINTING ETC. A. ORIGINAL WORKS 1.Plaster (to wall, floor,
ceiling etc.) with sand and cement mortar including rounding off or
chamfering corners as directed and raking out joints including
throating, nosing and drip course, scaffolding/staging where
necessary (Ground floor).[Excluding cost of chipping over concrete
surface](ii) With 1:4 cement mortar (a) 20 mm thick plaster(3rd
Corrigenda & addenda dated 04.06.2018) | 0.6 | SQM | 194 | ₹116.38 |
| 5 | SECTION 1. ------------BUILDING WORKS (I) PLASTERING,
POINTING ETC. A. ORIGINAL WORKS 15 Neat cement punning
about 1.5mm thick in wall, dado, window sill, floor etc. NOTE:Cement
0.152 cu.m per100 sq.m. | 1 | SQM | 34 | ₹34 |
| 6 | BUILDING WORKS (F) STRUCTURAL STEEL WORKS, GRILLS,
GATES ETC. A. ORIGINAL WORKS 13. (a) M.S.or W.I. Ornamental
grill of approved design joints continuously welded with M.S, W.I.
Flats and bars of windows,railing etc. fitted and fixed with necessaryscrews and lugs in ground floor. (Add extra @ 1% for each addl. floorupto 4th floor and @ 1.25%for each addl. floor above 4th floor) ((ii) Grill weighing above 16Kg./sq.mtr and above. (MODE OF MEASUREMENT):-The weight of grill per sq.m. will be determined by taking the physical weight of fabricated grill and dividing the same by covered area of the same.
N.B. No shop priming will be allowed to facilitate inspection of
workmanship. Weight of grill is to be taken after final grinding and
finishing the weld. (3rd Corrigenda & addenda dated 04.06.2018) | 0.2 | QUINTAL | 9,696 | ₹1,939.2 |
| 7 | SECTION 1. ------------BUILDING WORKS (J)WHITE WASH,
COLOUR WASH, DISTEMPER B. MISCELLANEOUS ITEMS
1.Scraping of moss, blisters etc.thoroughly from exterior surface of
walls necessitating the use of scraper, wire brush etc.(Payment
against this item will be made only when this has been done on the
specific direction of the Engineer-in-charge) | - | SQM | 7 | - |
| 8 | SECTION 1. ------------BUILDING WORKS (J)WHITE WASH,
COLOUR WASH, DISTEMPER A. ORIGINAL WORKS 8 Applying
Exterior grade Acrylic primer of approved quality and brand on
plastered or cencrete surface old or new surface to receive decorative
textured (matt finish) or smooth finish acrylic exterior emulsion paint
including scraping and preparing the surface throughly, complete as
per manufacturer's specification and as per direction of the EIC. In
Ground Floor: (b) Two Coats [This item to be done under specific
instruction of the Superintending Engineer]N.B.:-Extra for each
additional floor in external walls refer item 1 of subhead C | 1 | PER 100 SQUARE METER | 4,510 | ₹4,509.55 |
| 9 | SECTION 1. ------------BUILDING WORKS (J)WHITE WASH,
COLOUR WASH, DISTEMPER A. ORIGINAL WORKS 17 Protective
and Decorative Acrylic exterior emulsion paint of approved quality, as
per manufacturer's specification and as per direction of
Engineer-in-Charge to be applied over acrylic primer as required. The
rate includes cost of material, labour, scaffolding and all incidental
charges but excluding the cost of primer. In Ground floor (Two Coat)
b) Premium 100% Acrylic Emulsion N.B. The items [17 (b) & 17(c)] of
subhead A are to be selected only with written permission of
Superintending Engineer for very resticted and small areas of a
building. | - | SQM | 84 | - |
| 10 | SECTION 1. ------------BUILDING WORKS (K) PAINTING,
VERNISHING ETC A. ORIGINAL WORKS 1 (a) Priming one coat on
steel or other metal surface with synthetic oil bound primer of
approved quality including smoothening surfaces by sand papering
etc (This item is applicable to new work or old work when the original
surface has been exposed by removal of old paint.) | 1 | SQM | 29 | ₹29 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
form.pdf
Tender Documents • 0.50 MB
BOQ_2552232.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .