Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹77,616Accepted-AOC 986 11 MULTI FASTNERS PRIVATE LIMITED DIAMOND PARK GATE NO 2 MAKARPURA GIDC VADODARA GUJARAT 390010 UDYAM GJ 24 0005047 24AABCM3424A1Z9 R M MSME STATUS AS VERIFIED | VADODARA | GUJARAT | 390010 | L1 | Accepted-AOC L1 Bidder | |
| 2 | L1₹82,922Accepted-AOC PLOT NO 50 MAJOR INDUSTRIAL ESTATE ERNAKULAM ERNAKULAM KERALA 683109 | 683109 | L1 | Accepted-AOC L1 Bidder | |
| 3 | L1₹3.5 LAccepted-AOC | L1 | Accepted-AOC L1 Bidder | |
| 4 | L2Rejected-Finance M 3 INDUSTRIAL ESTATE GOKUL ROAD GOKUL ROAD INDUSTRIAL ESTATE DHARWARD KARNATAKA 580030 | DHARWAD | KARNATAKA | 580030 | L2 | Rejected-Finance L2 Bidder | |
| 5 | L2Rejected-Finance 13 B FRIENDS INDL ESTATE FOCAL POINT LUDHIANA PUNJAB 141010 | LUDHIANA | PUNJAB | 141010 | L2 | Rejected-Finance L2 Bidder |
Tender Value
Refer Docs
Closing Date
26 Dec 2022, 3:00 pmClosed
Mr. Nilesh Sathe
thyssenKrupp Industrial Solutions (India) Private Limited (Formerly Uhde India Private Limited) Uhde House, L B S Marg, Vikhroli (W), Mumbai - 400083, India
SUPPLY OF FASTENERS FOR P25 PROJECT AT IOCL PANIPAT REFINERY
2022_REFHQ_160150_1
6745-PPM-000-CA-PI39
Limited
Mechanical - Piping, materials, flanges, valves, seals
Supply
90 days
IOCL Panipat Refinery
Please refer Tender documents.
6 documents required · 6 mandatory
Exempted
21 Feb 2024
9 Dec 2022
27 Dec 2022
9 Dec 2022
26 Dec 2022
16 Dec 2022
SUPPLY OF FASTENERS
SBOLT, B18.2.1/B18.2.2, WITH 2 HEAVY HEXAGON NUTS, A193GR.B7/A194GR.2H, ADD. INFORMATION, 1.LENGTH OF STUD BOLT DOES NOT INCLUDE, THE HEIGHT OF THE POINTS., 2.FOR GENERAL TECHNICAL REQUIREMENTS, REFER DOC. 6745-PIP-000-EC-0001
SBOLT, B18.2.1/B18.2.2, WITH 2 HEAVY HEXAGON NUTS, A193GR.B7/A194GR.2H, ADD. INFORMATION, 1.LENGTH OF STUD BOLT DOES NOT INCLUDE, THE HEIGHT OF THE POINTS., 2.FOR GENERAL TECHNICAL REQUIREMENTS, REFER DOC. 6745-PIP-000-EC-0001
SBOLT, B18.2.1/B18.2.2, WITH 2 HEAVY HEXAGON NUTS, A193GR.B7/A194GR.2H, ADD. INFORMATION, 1.LENGTH OF STUD BOLT DOES NOT INCLUDE, THE HEIGHT OF THE POINTS., 2.FOR GENERAL TECHNICAL REQUIREMENTS, REFER DOC. 6745-PIP-000-EC-0001
SBOLT, B18.2.1/B18.2.2, WITH 2 HEAVY HEXAGON NUTS, A193GR.B7/A194GR.2H, ADD. INFORMATION, 1.LENGTH OF STUD BOLT DOES NOT INCLUDE, THE HEIGHT OF THE POINTS., 2.FOR GENERAL TECHNICAL REQUIREMENTS, REFER DOC. 6745-PIP-000-EC-0001
SBOLT, B18.2.1/B18.2.2, WITH 2 HEAVY HEXAGON NUTS, A193GR.B7/A194GR.2H, ADD. INFORMATION, 1.LENGTH OF STUD BOLT DOES NOT INCLUDE, THE HEIGHT OF THE POINTS., 2.FOR GENERAL TECHNICAL REQUIREMENTS, REFER DOC. 6745-PIP-000-EC-0001
SBOLT, B18.2.1/B18.2.2, WITH 2 HEAVY HEXAGON NUTS, A193GR.B7/A194GR.2H, ADD. INFORMATION, 1.LENGTH OF STUD BOLT DOES NOT INCLUDE, THE HEIGHT OF THE POINTS., 2.FOR GENERAL TECHNICAL REQUIREMENTS, REFER DOC. 6745-PIP-000-EC-0001
SBOLT, B18.2.1/B18.2.2, WITH 2 HEAVY HEXAGON NUTS, A193GR.B7/A194GR.2H, ADD. INFORMATION, 1.LENGTH OF STUD BOLT DOES NOT INCLUDE, THE HEIGHT OF THE POINTS., 2.FOR GENERAL TECHNICAL REQUIREMENTS, REFER DOC. 6745-PIP-000-EC-0001
SBOLT, B18.2.1/B18.2.2, WITH 2 HEAVY HEXAGON NUTS, A193GR.B7/A194GR.2H, ADD. INFORMATION, 1.LENGTH OF STUD BOLT DOES NOT INCLUDE, THE HEIGHT OF THE POINTS., 2.FOR GENERAL TECHNICAL REQUIREMENTS, REFER DOC. 6745-PIP-000-EC-0001
SBOLT, B18.2.1/B18.2.2, WITH 2 HEAVY HEXAGON NUTS, A193GR.B7/A194GR.2H, ADD. INFORMATION, 1.LENGTH OF STUD BOLT DOES NOT INCLUDE, THE HEIGHT OF THE POINTS., 2.FOR GENERAL TECHNICAL REQUIREMENTS, REFER DOC. 6745-PIP-000-EC-0001
SBOLT, B18.2.1/B18.2.2, WITH 2 HEAVY HEXAGON NUTS, A193GR.B7/A194GR.2H, ADD. INFORMATION, 1.LENGTH OF STUD BOLT DOES NOT INCLUDE, THE HEIGHT OF THE POINTS., 2.FOR GENERAL TECHNICAL REQUIREMENTS, REFER DOC. 6745-PIP-000-EC-0001
SBOLT, B18.2.1/B18.2.2, WITH 2 HEAVY HEXAGON NUTS, A193GR.B7/A194GR.2H, ADD. INFORMATION, 1.LENGTH OF STUD BOLT DOES NOT INCLUDE, THE HEIGHT OF THE POINTS., 2.FOR GENERAL TECHNICAL REQUIREMENTS, REFER DOC. 6745-PIP-000-EC-0001
SBOLT, B18.2.1/B18.2.2, WITH 2 HEAVY HEXAGON NUTS, A193GR.B7/A194GR.2H, ADD. INFORMATION, 1.LENGTH OF STUD BOLT DOES NOT INCLUDE, THE HEIGHT OF THE POINTS., 2.FOR GENERAL TECHNICAL REQUIREMENTS, REFER DOC. 6745-PIP-000-EC-0001
SBOLT, B18.2.1/B18.2.2, WITH 2 HEAVY HEXAGON NUTS, A193GR.B7/A194GR.2H, ADD. INFORMATION, 1.LENGTH OF STUD BOLT DOES NOT INCLUDE, THE HEIGHT OF THE POINTS., 2.FOR GENERAL TECHNICAL REQUIREMENTS, REFER DOC. 6745-PIP-000-EC-0001
SBOLT, B18.2.1/B18.2.2, WITH 2 HEAVY HEXAGON NUTS, A193GR.B7/A194GR.2H, ADD. INFORMATION, 1.LENGTH OF STUD BOLT DOES NOT INCLUDE, THE HEIGHT OF THE POINTS., 2.FOR GENERAL TECHNICAL REQUIREMENTS, REFER DOC. 6745-PIP-000-EC-0001
SBOLT, B18.2.1/B18.2.2, WITH 2 HEAVY HEXAGON NUTS, A193GR.B7/A194GR.2H, ADD. INFORMATION, 1.LENGTH OF STUD BOLT DOES NOT INCLUDE, THE HEIGHT OF THE POINTS., 2.FOR GENERAL TECHNICAL REQUIREMENTS, REFER DOC. 6745-PIP-000-EC-0001
SBOLT, B18.2.1/B18.2.2, WITH 2 HEAVY HEXAGON NUTS, A193GR.B7/A194GR.2H, ADD. INFORMATION, 1.LENGTH OF STUD BOLT DOES NOT INCLUDE, THE HEIGHT OF THE POINTS., 2.FOR GENERAL TECHNICAL REQUIREMENTS, REFER DOC. 6745-PIP-000-EC-0001
SBOLT, B18.2.1/B18.2.2, WITH 2 HEAVY HEXAGON NUTS, A193GR.B7/A194GR.2H, ADD. INFORMATION, 1.LENGTH OF STUD BOLT DOES NOT INCLUDE, THE HEIGHT OF THE POINTS., 2.FOR GENERAL TECHNICAL REQUIREMENTS, REFER DOC. 6745-PIP-000-EC-0001
SBOLT, B18.2.1/B18.2.2, WITH 2 HEAVY HEXAGON NUTS, A193GR.B7/A194GR.2H, ADD. INFORMATION, 1.LENGTH OF STUD BOLT DOES NOT INCLUDE, THE HEIGHT OF THE POINTS., 2.FOR GENERAL TECHNICAL REQUIREMENTS, REFER DOC. 6745-PIP-000-EC-0001
SBOLT, B18.2.1/B18.2.2, WITH 2 HEAVY HEXAGON NUTS, A193GR.B7/A194GR.2H, ADD. INFORMATION, 1.LENGTH OF STUD BOLT DOES NOT INCLUDE, THE HEIGHT OF THE POINTS., 2.FOR GENERAL TECHNICAL REQUIREMENTS, REFER DOC. 6745-PIP-000-EC-0001
SBOLT, B18.2.1/B18.2.2, WITH 2 HEAVY HEXAGON NUTS, A193GRB7M/A194GR2HM, ADD. INFORMATION, 1.LENGTH OF STUD BOLT DOES NOT INCLUDE, THE HEIGHT OF THE POINTS., 2.NACE REQ. ACC. TO NACE MR-0103 AND DOC., 6745-PIP-000-EC-0005(EXPOSED BOLTING), 3.FOR GENERAL TECHNICAL REQUIREMENTS, REFER DOC. 6745-PIP-000-EC-0001
SBOLT, B18.2.1/B18.2.2, WITH 2 HEAVY HEXAGON NUTS, A193GRB7M/A194GR2HM, ADD. INFORMATION, 1.LENGTH OF STUD BOLT DOES NOT INCLUDE, THE HEIGHT OF THE POINTS., 2.NACE REQ. ACC. TO NACE MR-0103 AND DOC., 6745-PIP-000-EC-0005(EXPOSED BOLTING), 3.FOR GENERAL TECHNICAL REQUIREMENTS, REFER DOC. 6745-PIP-000-EC-0001
SBOLT, B18.2.1/B18.2.2, WITH 2 HEAVY HEXAGON NUTS, A193GRB7M/A194GR2HM, ADD. INFORMATION, 1.LENGTH OF STUD BOLT DOES NOT INCLUDE, THE HEIGHT OF THE POINTS., 2.NACE REQ. ACC. TO NACE MR-0103 AND DOC., 6745-PIP-000-EC-0005(EXPOSED BOLTING), 3.FOR GENERAL TECHNICAL REQUIREMENTS, REFER DOC. 6745-PIP-000-EC-0001
SBOLT, B18.2.1/B18.2.2, WITH 2 HEAVY HEXAGON NUTS, A193GRB7M/A194GR2HM, ADD. INFORMATION, 1.LENGTH OF STUD BOLT DOES NOT INCLUDE, THE HEIGHT OF THE POINTS., 2.NACE REQ. ACC. TO NACE MR-0103 AND DOC., 6745-PIP-000-EC-0005(EXPOSED BOLTING), 3.FOR GENERAL TECHNICAL REQUIREMENTS, REFER DOC. 6745-PIP-000-EC-0001
SBOLT, B18.2.1/B18.2.2, WITH 2 HEAVY HEXAGON NUTS, A193GRB7M/A194GR2HM, ADD. INFORMATION, 1.LENGTH OF STUD BOLT DOES NOT INCLUDE, THE HEIGHT OF THE POINTS., 2.NACE REQ. ACC. TO NACE MR-0103 AND DOC., 6745-PIP-000-EC-0005(EXPOSED BOLTING), 3.FOR GENERAL TECHNICAL REQUIREMENTS, REFER DOC. 6745-PIP-000-EC-0001
SBOLT, B18.2.1/B18.2.2, WITH 2 HEAVY HEXAGON NUTS, A193GRB7M/A194GR2HM, ADD. INFORMATION, 1.LENGTH OF STUD BOLT DOES NOT INCLUDE, THE HEIGHT OF THE POINTS., 2.NACE REQ. ACC. TO NACE MR-0103 AND DOC., 6745-PIP-000-EC-0005(EXPOSED BOLTING), 3.FOR GENERAL TECHNICAL REQUIREMENTS, REFER DOC. 6745-PIP-000-EC-0001
SBOLT (GALV.), B18.2.1/B18.2.2, WITH 2 HEAVY HEXAGON NUTS, A193GR.B7/A194GR.2H, (HDG), ADD. INFORMATION, 1.LENGTH OF STUD BOLT DOES NOT INCLUDE, THE HEIGHT OF THE POINTS., 2.FOR GENERAL TECHNICAL REQUIREMENTS, REFER DOC. 6745-PIP-000-EC-0001
SBOLT (GALV.), B18.2.1/B18.2.2, WITH 2 HEAVY HEXAGON NUTS, A193GR.B7/A194GR.2H, (HDG), ADD. INFORMATION, 1.LENGTH OF STUD BOLT DOES NOT INCLUDE, THE HEIGHT OF THE POINTS., 2.FOR GENERAL TECHNICAL REQUIREMENTS, REFER DOC. 6745-PIP-000-EC-0001
SBOLT (GALV.), B18.2.1/B18.2.2, WITH 2 HEAVY HEXAGON NUTS, A193GR.B7/A194GR.2H, (HDG), ADD. INFORMATION, 1.LENGTH OF STUD BOLT DOES NOT INCLUDE, THE HEIGHT OF THE POINTS., 2.FOR GENERAL TECHNICAL REQUIREMENTS, REFER DOC. 6745-PIP-000-EC-0001
SBOLT (GALV.), B18.2.1/B18.2.2, WITH 2 HEAVY HEXAGON NUTS, A193GR.B7/A194GR.2H, (HDG), ADD. INFORMATION, 1.LENGTH OF STUD BOLT DOES NOT INCLUDE, THE HEIGHT OF THE POINTS., 2.FOR GENERAL TECHNICAL REQUIREMENTS, REFER DOC. 6745-PIP-000-EC-0001
SBOLT (GALV.), B18.2.1/B18.2.2, WITH 2 HEAVY HEXAGON NUTS, A193GR.B7/A194GR.2H, (HDG), ADD. INFORMATION, 1.LENGTH OF STUD BOLT DOES NOT INCLUDE, THE HEIGHT OF THE POINTS., 2.FOR GENERAL TECHNICAL REQUIREMENTS, REFER DOC. 6745-PIP-000-EC-0001
SBOLT (GALV.), B18.2.1/B18.2.2, WITH 2 HEAVY HEXAGON NUTS, A193GR.B7/A194GR.2H, (HDG), ADD. INFORMATION, 1.LENGTH OF STUD BOLT DOES NOT INCLUDE, THE HEIGHT OF THE POINTS., 2.FOR GENERAL TECHNICAL REQUIREMENTS, REFER DOC. 6745-PIP-000-EC-0001
SBOLT (GALV.), B18.2.1/B18.2.2, WITH 2 HEAVY HEXAGON NUTS, A193GR.B7/A194GR.2H, (HDG), ADD. INFORMATION, 1.LENGTH OF STUD BOLT DOES NOT INCLUDE, THE HEIGHT OF THE POINTS., 2.FOR GENERAL TECHNICAL REQUIREMENTS, REFER DOC. 6745-PIP-000-EC-0001
SBOLT (GALV.), B18.2.1/B18.2.2, WITH 2 HEAVY HEXAGON NUTS, A193GR.B7/A194GR.2H, (HDG), ADD. INFORMATION, 1.LENGTH OF STUD BOLT DOES NOT INCLUDE, THE HEIGHT OF THE POINTS., 2.FOR GENERAL TECHNICAL REQUIREMENTS, REFER DOC. 6745-PIP-000-EC-0001
SBOLT (GALV.), B18.2.1/B18.2.2, WITH 2 HEAVY HEXAGON NUTS, A193GR.B7/A194GR.2H, (HDG), ADD. INFORMATION, 1.LENGTH OF STUD BOLT DOES NOT INCLUDE, THE HEIGHT OF THE POINTS., 2.FOR GENERAL TECHNICAL REQUIREMENTS, REFER DOC. 6745-PIP-000-EC-0001
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .