| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.2 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹2.3 L+₹10,510 (4.76%)Admitted-Finance | L2 | Admitted-Finance |
Tender Value
₹3 L
EMD Value
₹6,000
Closing Date
6 Aug 2026, 6:00 pmClosed
FAYAZ AHMED SHEIKH
EXECUTIVE ENGINEER OFFICE REW RAMBAN
AS PER NIT
2026_RDPR_317336_3
NIT NO 16 OF REW RAMBAN 2026 27 UNDER HEAD SBM AND MPLADS
Open Tender
Civil Works
Percentage
30 days
RAMBAN
AS PER NIT
2 documents required · 2 mandatory
₹600
Rural Development and Panchayati Raj
₹6,000
7 Aug 2026
22 Jul 2026
7 Aug 2026
22 Jul 2026
6 Aug 2026
22 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil | - | cum | 479.3 | - |
| 2 | Providing and laying of dry soling hand packed,in foundation and trenches inclusive of all carriages complete job | 1 | cum | 900 | ₹899.1 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). | 1 | cum | 5,202.9 | ₹5,197.7 |
| 4 | Dry random rubble masonry with hard stone in foundation and plinth: Without bond stone (Nallah) | 1 | cum | 2,973.8 | ₹2,970.83 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size). | - | cum | 5,733.6 | - |
| 6 | Providing and laying in position Reinforced cement concrete in Suspended floors, roofs, stair cases, lintels, chajjas, balconies etc. all work upto floor V level of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:1.5:3 (1 cement :1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | - | cum | 9,821.85 | - |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form work for:foundations ,footings bases of column | - | sqm | 718.2 | - |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form work for: Suspended floors, roofs, landings, balconies etc | 1 | sqm | 286.35 | ₹286.06 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form work for: edges of slab and breaks in floors and walls under 20cm wide | - | rmt | 262.3 | - |
| 10 | Steel Reinforcement for RCC work including cutting, bending, binding and placing in position all complete (TMT bars of Fe500 Grade) | - | kgs | 123.25 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.34 MB
BOQ_1039466.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .