Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹1.7 LAccepted-Finance | l1 | Accepted-Finance QUALIFIED | |
| 2 | l2₹2.1 L+₹37,075 (21.8%)Accepted-Finance | l2 | Accepted-Finance QUALIFIED | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹2 L
EMD Value
₹2,000
Closing Date
13 May 2020, 11:00 amClosed
SUPERINTENDING ENGINEER
EDC III BULANDSHAHR
ELECTRIFICATION WORK DUE TO NATURAL DESESTER PRONE AREAS BY INVITING RUNNING TENDER IN THE AREA OF EDD III BULANDSHAHR UNDER EDC III BULANDSHAHR
2020_PVVNL_465506_1
T-04/EDC-III/BSR/2020-2021
Open Tender
Electrical Works
Lump-sum
8 days
BULANDSHAHR
ELECTRIFICATION WORK DUE TO NATURAL DESESTER PRONE AREAS BY INVITING RUNNING TENDER IN THE AREA OF EDD III BULANDSHAHR UNDER EDC III BULANDSHAHR
2 documents required · 2 mandatory
₹1,180
ICICI BANK
₹2,000
Yes
14 May 2020
4 May 2020
13 May 2020
4 May 2020
13 May 2020
4 May 2020
Amount
fo|qr forj.k [k.M&r`rh;] cqyUn'kgj ds vUrxZr jfuax fufonk ds ek/;e ls lEHkkfor nSoh; vkink] oh0vkbZ0ih0 ds vkxeu dk;ZØe ij vkdfLed ejEer] vkdfLed okgu nq?kZVukvksa ds dkj.k ih0lh0lh0 iksy] Økl vkeZ ,l0Vh0ih0 iksy ,oa ykbZu bR;kfn {kfrxzLr gksus ij iquZLFkkfir@ejEer djus dk dk;ZA
Carriage of fallowings from ESC BSR to pit site on kachcha pacaa road including loading and unloading chagres at both ends, required ccompletion of work, distance about to 0 to 70 Km. approx.
PCC Pole ESC Bulandshahr to site .
Carriage of All line Material from store to j.e store Sub-station as ACSR Weasel conductor, ABC conductor GI Wire, Earth Wire. Earth wire, M.S. Channel, Angle, Stay & Earthig Rods, Barbed Wire. Disc Insulator etc.
Erection of Single support including complete H.T./L.T. fittings as per RESPO Drawing and as per direction of Engineer incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.
Grouting of Single support shall be grouted with cement, sand and birck ballast/stone ballast in ratio 1:4:8 =30x3030 cms. including the cost of Cement, Sand, Brick Ballast/Stone Ballast, etc. as per actual size requirement, as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work.
Carriage of line Material from J.E store to Site as ACSR Weasel Conductor, ABC Conductor GI Wire, Earth Wire. M.S. Chanel, Angle, Stay & Earthig Rods, Barbed Wire. Disc Insulator etc.
Dismantling of 25 KVA/63 KVA Insulator from damaged double pole.
Dismantling of 100 KVA Transformer from damaged double pole.
Mounting of 25 KVA/63KVA Transformer or double pole.
Mounting of 100 KVA T/F on doble pole.
Laying, sagging. Stringing and binding and jumpering etc. of following Conductor on the newly erected poles as per RESPO manual and as per direction of Supervising Engineer. It includes the cost of labour, T&P, carrier etc. requried for proper completion of work.
fixing of Stay rod with Stay wire in proper way with Nozelling
Grouting of Stay rods
Re-sagging of loose and bad sag of L.T./H.T. Line.
Tightening of Stay
Grouting of PCC/STP Pole old.
Change of following broken/Damaged/Missing items of ht/lt lines
Disc Insulator.
Pin Insulator.
Bolt & nut off size.
Bended X-Arm/Angle/Channel.
Ailgnment of tilted PCC/STP Pole.
F clamp.
Stay Clamps.
Stay Insulator.
Making of pilinth of the Damaged/Broken STP of the welded 03 nos. Angle iron piece with the pole.
Dismantling of STP/PCC Poles.
The following material is required to the following material is required to be supplied by the contractor.
Stay Clamps.
Stay Insulator.
F Bracket.
X-Arm Holding Clamp.
F clamp.
Earth clamp
Stay clamp
Bolt & nut off size.
Carriage of followings from ESC BSR to pit site on kachcha pacaa road including loading and unloading chagres at both ends, required ccompletion of work, distance about to 0 to 70 Km. approx.
Carriage of 33 KV PCC Pole /STP pole
Carriage of All line Material from store to j.e store Sub-station as ACSR Weasel conductor, ABC conductor GI Wire, Earth Wire. Earth wire, M.S. Channel, Angle, Stay & Earthig Rods, Barbed Wire. Disc Insulator etc.
Erection of Single support including complete H.T./L.T. fittings as per RESPO Drawing and as per direction of Engineer incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. Installation of Single support 33 kv pole including fixing of fittings.
Grouting of 33 kv Stays Rods
Straightning of 33 kv tilted Poles.
Replacement of Damaged X Arms of 33 kv
Replacement of Damaged Disc Insulators.
Replacement of Damaged of Pin Insulators.
Vivek Electricals
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .