Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.4 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹2.4 L+₹2,447.65 (1.01%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹2.5 L+₹5,355.76 (2.21%)Rejected-Finance | L3 | Rejected-Finance L3 |
Tender Value
₹2.4 L
EMD Value
₹4,847
Closing Date
17 Jan 2026, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
PRADHAN LAVA GITBEONG GRAM PANCHAYAT
OFFICE OF THE PRADHAN LAVA GITBEONG GRAM PANCHAYAT
CONSTRUCTION OF CEMENT CONCRETE FOOTPATH FROM PURNA BAHADUR HOUSE TOWARDS NIM TSHERING HOUSE AT NOKDARA LAVA GITBEONG G P WORK ID 109646654
2025_GTA_979392_1
03/LGGP-15th CFC/2025-26
Open Tender
CIVIL WORKS
Percentage
45 days
LAVA
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
₹4,847
30 Jan 2026
24 Dec 2025
20 Jan 2026
24 Dec 2025
17 Jan 2026
24 Dec 2025
Earthwork in excavation of foundation trenches or drains in all sorts of soils(Including mixed soils but excluding laterite or sandstone), including removing, spreading or stacking the spoils within a lead of 75 m as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.
(A) Labour for laying 150 mm to 200 mm boulder soling including rough dressing hand packing and ramming down small pieces in the interstics without rolling but including ramming and preparing the bed to proper level and filling up all joints with sandy clay or earth.
B.Cost of Boulder
Cement concrete with graded jhama khoa(30 mm size) excluding shuttering in ground floor and foundation 1:3:6 propotion
Hire labour charges for Shuttering with hard wood for precast RC Slab curved or straight, and striking out the same including fitting, fixing the precast slab in position with necessary carriage and haulage, hosting etc. complete in all respect. (Only the area in contact to concrete to be measured)
Cost of PIB
18 % including GST
Labour Cess @ 1 % including GST
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 8.29 MB
BOQ_2387215.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .