Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 LAccepted-Finance | L1 | Accepted-Finance as per boq | |
| 2 | L2₹2.0 L+₹4,330 (2.24%)Accepted-Finance | L2 | Accepted-Finance as per boq | |
| 3 | L3₹2.0 L+₹6,600 (3.42%)Accepted-Finance | L3 | Accepted-Finance as per boq |
Tender Value
₹1.9 L
EMD Value
₹1,940
Closing Date
28 Feb 2024, 12:00 pmClosed
Superintending Engineer
EUDC, SRE
work for VCB shifting
2024_PVVNL_896176_2
ET No. 122/W/EUDC/SRE/2023-24
Open Tender
Electrical Works
Lump-sum
21 days
saharanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
Superintending Engineer
₹1,940
Yes
6 Mar 2024
22 Feb 2024
28 Feb 2024
22 Feb 2024
28 Feb 2024
22 Feb 2024
Amount
Proper opening of 3x300sqmm 11kv cable from of incoming No. 3&4 VCBs after removing back cover alongwith Nuts, bolts & sealing arrangement.
Proper opening of 3x185sqmm 11kv cable from of outgoing feeder VCBs after removing back cover alongwith Nuts, bolts & sealing arrangement.
Proper Opening of Busbar from 11kv VCB's so as to unlock them for transportation.
Shifting of 11KV I/C VCB pannels from existing control room to Newly constrected control room after opening of pannels and its accessories with proper rolling arrangement.
Shifting of 11KV O/G VCB pannels from existing control room to Newly constrected control room after opening of pannels and its accessories with proper rolling arrangement.
Installation of 11kv VCB Pannels I/C and O/G in proper alignment at jain bagh-2 control Room with all accessosries in linear arragement.
Fixing of 11kv Busbar in the VCB pannels including proper tapping and insulation alongwith earthing arrangement to there strip to be provided.
Shifting and fixing of 11kv cable from existing control room to Newly constructed control room including pullingout of cables from old cable trench of old control room to newly constructed trench after digging of trench in standard.
Shifting other equipment of I/C-3, I/C-4 including installation peroperly alongwith battery, battery set, connections in proper end.
Earthing of incoming VCB pannels I/C No. 3&4 by means of MS strip 50x6mm & connecting to pipe boaring type earthing as per resspo norms.
Proper wiring in site new control room to insure smooth DC output and in panels for smooth functioning.
Arragnement of proper testing for shifted control panel in new control room where cardboard arrangement to be done for fuse setup room where providing & climping of lugs of proper size, complete work. All material provided by contractor.
Arrangement of lighting equipements in newly consturcted control room. Material provided by the contractor.
M/s Raj Kishor Contractor
GYAS PAL CONTRACTOR
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .