| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹2.3 L+₹46.93 (0.02%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹2.3 L+₹93.86 (0.04%)Rejected-AOC 18 SANKAR BOSE ROAD KOLKATA | L3 | Rejected-AOC L3 | |
| 4 | L4₹2.3 L+₹117.33 (0.05%)Rejected-AOC JANNAGAR RATUA MALDA WEST BENGAL PIN 732205 | MALDA | MALDA | WEST BENGAL | 732205 | L4 | Rejected-AOC L4 |
Tender Value
₹2.3 L
EMD Value
₹5,000
Closing Date
14 Aug 2026, 6:00 pmClosed
Executive Engineer (AM), Malda-II (AM) Division
Executive Engineer (AM), Malda-II (AM) Division, Madhabnagar, Mokdampur, Malda, Administrative Building (1st Floor), Mokdampur-732103, Malda.
Extension of Pipe Line at Kharbari Jhamuria State Govt. Owned and Operated Major RLI Scheme at Mouza-Kharbari, J.L. No-149 Plot No-402 in Ratua-II Block of Ratua (A-M) Sub-Division within Malda-II (A-M) Division, Malda under Non-Plan Programme.
2026_WRDD_1036319_1
WRDD/EEAM /MLD-II/NIT-02e/26-27
Open Tender
MECHANICAL
Percentage
90 days
Mouza-Kharbari, Ratua-II Block
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,000
21 Aug 2026
5 Aug 2026
17 Aug 2026
6 Aug 2026
14 Aug 2026
6 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Earth work in excavation of foundation trenches or drains in all sorts of soil (including mixed soil but excluding laterite or sand stone) including removing spreading of stacking the spoils within lead of 75m as directed and including trimminmg the sides of the trtenches, levelling dressing and rumming the bottoms, depth of the exacavation not exceeding 1.5 m( not required shoring) | 7.06 | m3 | 119.27 | ₹842.05 |
| 1.02 | Earth work in excavation of field trenches as per design section and alignment for laying of pipe lines (PVC, RCC, ACP etc.) upto a depth of 1500 mm all sorts of soils including removing, spreading or stacking extra earth as directed. The item includes necessary trimming of sides trenches, levelling, dressing and ramming the bottom as required complete | 701.49 | m3 | 99.01 | ₹69,454.52 |
| 1.03 | Laying of P.V.C pipes of different diameters within field tranches in curve / straight line using P.V.C fittings viz bend.Tee,Reducer etc and making leak proof joints with couplers after roughening the surface with wire brush and emery paper and applying solvent cement. all complete as per direction of E.I.C (b) 140 mm dia PVC Pipe | 1,290 | m | 10.14 | ₹13,080.6 |
| 1.04 | Filling in foundation or plinth by fine sand in layers not exceeding 150 mm as directed and consolidated the same by through saturation with water ramming complete including the cost of supply of sand. | 2.23 | m3 | - | - |
| 1.05 | Single brick flat soling of picked Jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. | 19.18 | Sq. mt. | 322 | ₹6,175.96 |
| 1.06 | Brick work with Ist class brick in cement mortar (1 : 6) .
(a) In foundation and plinth. | 5.44 | m3 | 4,919 | ₹26,759.36 |
| 1.07 | 125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in ground floor. (a) Spout chamber drains walls | 6 | Sq. mt. | 676 | ₹4,056 |
| 1.08 | Ordinary Cement concrete (Mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement , if any, in ground floor as per relevant IS codes.(a) Pakur vareity. | 1.75 | m3 | 4,816.6 | ₹8,429.05 |
| 1.09 | Ordinary Cement concrete (Mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement , if any, in ground floor as per relevant IS codes.(a) Pakur vareity. | 0.38 | m3 | 5,399.85 | ₹2,051.94 |
| 1.1 | Hire & labour charges of shuttering with centering and necessary staging upto 4 mtrs using approved stout props & thick hard wood planks of approved thickness with required bracing for concrete slabs, bems, columns, lintels curved or straight including fitting fixing and striking out affer completion of works(upto the roof of ground floor) 25mm to 30 mm thick wooden shuttering. | 11.81 | Sq. mt. | 328 | ₹3,873.68 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.55 MB
Tendernotice_2.pdf
PDF • 0.94 MB
Tendernotice_3.pdf
PDF • 0.95 MB
BOQ_2545778.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .