Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹81.9 LAccepted-AOC GRAM NAGLA KHUJI POST DADON ATROLI ALIGARH UTTAR PRADESH | ALIGARH | ALIGARH | UTTAR PRADESH | ₹81.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹89.7 LRejected-Finance | ₹89.7 L | L2 | Rejected-Finance L2 |
| 3 | L3₹90.2 LRejected-Finance | ₹90.2 L | L3 | Rejected-Finance L3 |
| 4 | L4₹99.4 LRejected-Finance | ₹99.4 L | L4 | Rejected-Finance L4 |
| Sl No | Description | Qty | Unit | M/S K. K. CONSTRUCTION L2 | M/S SHAILENDRA PANDEY L3 | M/S PRATAP NIRMAN SANSTHAN L4 | M/S JEET CONSTRUCTION L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in filling for maintaining internal side slope of canal including all cost of labour material ,lead &lift with proper dressing and manual compaction of work. | 2,505 | M3 | 94 ₹2.4 L | 120 ₹3.0 L | 160 ₹4.0 L | 122.5 ₹3.1 L |
| 2.00 | Earth work in Excavation of Toe wall,rib manually or by tractor where ever possible including all lead and Lift, excluding mechanical compaction but inclusive of manual compaction and dressing to profiles. | 4,134.72 | M3 | 65 ₹2.7 L | 60 ₹2.5 L | 70 ₹2.9 L | 77.7 ₹3.2 L |
| 3.00 | Preparation of sub grade before laying of Boulder pitching excluding cost of earth work. including all cost of labour and T&P etc. required for proper completion of work. | 2,421 | M2 | 10 ₹24,210 | 12 ₹29,052 | 20 ₹48,420 | 14.8 ₹35,830.80 |
| 4.00 | Centering & Shuttering for C.C work with all lead & lift required for proper completion of work including cost of all material , labour, T&P etc. required for proper completion of work. | 1,247.8 | M2 | 150 ₹1.9 L | 170 ₹2.1 L | 200 ₹2.5 L | 155.4 ₹1.9 L |
| 5.00 | Laying P.C.C.( 1:3:6)cement concrete including all cost of labour, material ,T&P etc required for proper completion of work. | 42.59 | M3 | 7,600 ₹3.2 L | 9,000 ₹3.8 L | 6,900 ₹2.9 L | 8,300 ₹3.5 L |
| 6.00 | Laying C.C.( 1:1.5:3)cement concrete including all cost of labour material ,T&P required for proper completion of work. | 246.97 | M3 | 9,650 ₹23.8 L | 9,500 ₹23.5 L | 9,000 ₹22.2 L | 8,726.03 ₹21.6 L |
| 7.00 | Laying local sand in proper position including all cost of labour,material T&P etc. required for proper completion of work. | 226.4 | M3 | 1,150 ₹2.6 L | 1,600 ₹3.6 L | 700 ₹1.6 L | 1,450 ₹3.3 L |
| 8.00 | laying Geo textile sheet below boulder pitching | 2,118.48 | M2 | 70 ₹1.5 L | 90 ₹1.9 L | 180 ₹3.8 L | 89.17 ₹1.9 L |
| 9.00 | Supplying and Laying mirzapur stone(20-40)kg boulder in Bottom Toe wall in 8SWG wire create of size 3.0X1.5X1m, mesh size 100mmX100mm woven double knotted including cost of all materials, labour ,T& P etc required for proper copletion of work. | 450 | M3 | 5,150 ₹23.2 L | 4,800 ₹21.6 L | 5,220 ₹23.5 L | 4,150 ₹18.7 L |
| 10.00 | Supplying and Laying mirzapur stone(20-40)kg boulder in Slope including cost of all materials, labour ,T& P etc required for proper copletion of work. | 679.19 | M3 | 4,150 ₹28.2 L | 4,100 ₹27.8 L | 5,220 ₹35.5 L | 3,585.05 ₹24.3 L |
Tender Value
₹1.1 Cr
EMD Value
₹2.3 L
Closing Date
13 Feb 2026, 3:00 pmClosed
S.E, Irrigation Construction Circle, Basti
S.E, Irrigation Construction Circle, Basti
Boulder Pitching Work for the Protection of the Right Bank from km 105.700 to 106.000 of Basti Branch in Distt- Siddharthnagar.
2026_UPIDC_1112432_2
09/S.E/2025-26
Open Tender
Civil Works
120 days
Bansi
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,332
₹2.3 L
18 Mar 2026
6 Feb 2026
13 Feb 2026
6 Feb 2026
13 Feb 2026
7 Feb 2026
Earth work in filling for maintaining internal side slope of canal including all cost of labour material ,lead &lift with proper dressing and manual compaction of work.
Earth work in Excavation of Toe wall,rib manually or by tractor where ever possible including all lead and Lift, excluding mechanical compaction but inclusive of manual compaction and dressing to profiles.
Preparation of sub grade before laying of Boulder pitching excluding cost of earth work. including all cost of labour and T&P etc. required for proper completion of work.
Centering & Shuttering for C.C work with all lead & lift required for proper completion of work including cost of all material , labour, T&P etc. required for proper completion of work.
Laying P.C.C.( 1:3:6)cement concrete including all cost of labour, material ,T&P etc required for proper completion of work.
Laying C.C.( 1:1.5:3)cement concrete including all cost of labour material ,T&P required for proper completion of work.
Laying local sand in proper position including all cost of labour,material T&P etc. required for proper completion of work.
laying Geo textile sheet below boulder pitching
Supplying and Laying mirzapur stone(20-40)kg boulder in Bottom Toe wall in 8SWG wire create of size 3.0X1.5X1m, mesh size 100mmX100mm woven double knotted including cost of all materials, labour ,T& P etc required for proper copletion of work.
Supplying and Laying mirzapur stone(20-40)kg boulder in Slope including cost of all materials, labour ,T& P etc required for proper copletion of work.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.48 MB
Lot_2.pdf
Tender Documents • 2.97 MB
BOQ_2057516.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid