| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.9 LAccepted-AOC | ₹11.9 L | L1 | Accepted-AOC L1-Accepted |
| 2 | L2₹12.3 LRejected-Finance | ₹12.3 L | L2 | Rejected-Finance L2-Rejected |
| Sl No | Description | Qty | Unit | R. BHOOLOGANATHAN L2 | SriAruthraEngginiring Contractor L1 |
|---|---|---|---|---|---|
| 1.00Providing for Grill Fencing arrangments at Neivasal Naacha Oorani in Neivasal Panchayat | |||||
| 2.00 | Earthwork exacavation and depositing on bank with initial lead and lift including all clauses of soils such as per S.S. 20B for Narrow foundation etc., complete | 32.4 | Cum | 265 ₹8,586 | 263.5 ₹8,537.4 Lowest |
| 3.00 | Filling in foundation and basement with M.Sand in layer of not more than 15cm thick including all charges etc.complete | 5.4 | cum | 1,730 ₹9,342 | 1,725 ₹9,315 Lowest |
| 4.00 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete | 8.1 | cum | 5,490 ₹44,469 | 5,487.2 ₹44,446.32 Lowest |
| 5.00 | Supplying and erecting centering shuttering including necessary supports for the plane surgace in foundation and basement and in all floors for RCC column footing column plinth beam, beams, roof slab, slaircase steps, bed blocks,critical pier etc., | 216 | Sqm | 575 ₹1,24,200 | 547.5 ₹1,18,260 Lowest |
| 6.00 | Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum | 19.04 | Cum | 6,890 ₹1,31,185.6 | 6,880.5 ₹1,31,004.72 Lowest |
| 7.00 | Supply and fixing of hollow section including all labour charges etc., complete | 5,543.28 | Kg | 130 ₹7,20,626.4 | 125.2 ₹6,94,018.66 Lowest |
| 8.00 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
(Refer Clause 1 & 7 of Section 2 of Instruction to Bidders (ITB) of SBD) | 1 | Nos | 1,86,913.62 ₹1,86,913.62 | 1,81,004.78 ₹1,81,004.78 Lowest |
Tender Value
₹12 L
EMD Value
₹12,000
Closing Date
23 Feb 2026, 3:00 pmClosed
Bdo,Thirumayam
Pt.union Office,Thirumayam
Providing for Grill Fencing arrangments at Neivasal Naacha Oorani in Neivasal Panchayat
2026_RDTN_662149_1
Tym/NNT/Work
Open Tender
Civil Works
Item Rate
Thirumayam
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹12,000
12 Aug 2026
20 Feb 2026
23 Feb 2026
20 Feb 2026
23 Feb 2026
20 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing for Grill Fencing arrangments at Neivasal Naacha Oorani in Neivasal Panchayat | - | - | - | - |
| 2 | Earthwork exacavation and depositing on bank with initial lead and lift including all clauses of soils such as per S.S. 20B for Narrow foundation etc., complete | 32.4 | Cum | - | - |
| 3 | Filling in foundation and basement with M.Sand in layer of not more than 15cm thick including all charges etc.complete | 5.4 | cum | - | - |
| 4 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete | 8.1 | cum | - | - |
| 5 | Supplying and erecting centering shuttering including necessary supports for the plane surgace in foundation and basement and in all floors for RCC column footing column plinth beam, beams, roof slab, slaircase steps, bed blocks,critical pier etc., | 216 | Sqm | - | - |
| 6 | Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum | 19.04 | Cum | - | - |
| 7 | Supply and fixing of hollow section including all labour charges etc., complete | 5,543.28 | Kg | - | - |
| 8 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
(Refer Clause 1 & 7 of Section 2 of Instruction to Bidders (ITB) of SBD) | - | Nos | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.11 MB
BOQ_794899.xls
BOQ • 0.50 MB
Tym-Doc.pdf
Tender Documents • 0.12 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].