Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.3 LAccepted-AOC AT BIRAKISHOREPUR PO ATHAGARH DIST CUTTACK PIN 754029 | ATHAGARH | CUTTACK | ODISHA | 754029 | ₹8.3 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹8.2 L−₹9,228.23 (1.12%)Rejected-AOC | ₹8.2 L−₹9,228.23 (1.12%) | L2 | Rejected-AOC Rejected |
| 3 | L2₹8.3 LSame as L1Rejected-AOC | ₹8.3 LSame as L1 | L2 | Rejected-AOC Rejected |
| 4 | L2₹8.3 LSame as L1Rejected-AOC | ₹8.3 LSame as L1 | L2 | Rejected-AOC Rejected |
| 5 | L2₹8.3 LSame as L1Rejected-AOC | ₹8.3 LSame as L1 | L2 | Rejected-AOC Rejected |
Tender Value
₹5.0 L
EMD Value
₹9,713
Closing Date
15 May 2026, 2:00 pmClosed
EXECUTIVE OFFICER NAC ATHGARH
Executive Officer NAC Athgarh
Construction of Construction of Ladies and Gents Toilet near BenuSagar Pond in w.no 02
2026_ORULB_128662_5
ATH-NAC-01/2026-27
Open Tender
Civil Works - Roads
Percentage
ATHGARH
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,720
₹9,713
Yes
23 Sept 2026
2 May 2026
19 May 2026
2 May 2026
15 May 2026
2 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation in all kind of soil with all leads and lift including dressing and leveling the bed sides up to required depth and depositing the excavated materials at places away from the work site with all leads and lifts, T&P for shoring, shuttering, dewatering if required etc. complete as per the drawing, designing including cost of all labour, T&P etc. as required for the work complete as directed by the engineer- in- charge. | 25.45 | Cum | 300.83 | ₹7,656.12 |
| 2 | Filling in foundation trenches, plinths, sites of foundation, in the space below the grade level slab and other underground structures with good quality river sand (inclusive of cost, conveyance, royalties, taxes, loading and unloading) laying in layers not exceeding 225mm in thickness, filling, watering and compacting / ramming, in each layers or complete as per specification, drawing and direction of the Engineer-in-Charge. | 7.71 | Cum | 1,475.7 | ₹11,377.65 |
| 3 | Cement concrete (1:3:6) with 4cm. Size crusher broken hard Granite metal including cost of all labour, materials with all taxes, lead,T & P etc all complete. | 4.05 | Cum | 5,941 | ₹24,061.05 |
| 4 | RCC M-20 by using 12mm to 20mm size crusher broken hard granite chips including cost,conveyance & royalty of all materials ( Column Base) | 1 | Cum | 6,421.38 | ₹6,414.96 |
| 5 | RCC M-20 by using 12mm to 20mm size crusher broken hard granite chips including cost,conveyance & royalty of all materials ( Column & Roof Beam) | 1 | Cum | 18,144.02 | ₹18,125.88 |
| 6 | RCC M-20 by using 12mm to 20mm size crusher broken hard granite chips including cost,conveyance & royalty of all materials (Plinth Beam) | - | Cum | 7,295.51 | - |
| 7 | RCC M-20 by using 12mm to 20mm size crusher broken hard granite chips including cost,conveyance & royalty of all materials ( Lintel) | - | Cum | 14,118.05 | - |
| 8 | RCC M-20 by using 12mm to 20mm size crusher broken hard granite chips including cost,conveyance & royalty of all materials (Roof Chhaja) | - | Cum | 13,700.82 | - |
| 9 | Straightening, cutting, bending and binding, welding and jointing (if necessary ) coiled/ bent up MS Rods /Tor Steel/deformed rods etc. including hoisting, placing in position, tying the grills binding with 18 to 20 gauge binding wire required for R.C.C work including cost, conveyance, taxes of all materials, cost of all labour, T&P etc. as required for the work complete (weight of binding wire will not be considered) as directed by Engineer-in-charge. (Payment will be made on actual weight of M.S rods or Tor steel linear measurements of rod for finished item of works. 5% wastage and lap length are included in the finished rate). | - | Qtl | 8,712.1 | - |
| 10 | Providing brick masonry in cement mortar (1:6) in f&p including cost, conveyance & royalty of all materials etc. | - | Cum | 5,731.2 | - |
stage.html
html • 0.07 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_589314.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 25.87 MB
BOQ_589314.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .