| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹24.3 LAccepted-AOC | ₹24.3 L | L-1 | Accepted-AOC Lowest |
| 2 | L-2₹32.4 LRejected-AOC | ₹32.4 L | L-2 | Rejected-AOC Highest |
| Sl No | Description | Qty | Unit | THE NEW LUCKY COOP LC SOCIETY LTD L2 | THE NEW RANBIR COOPERATIVE LABOUR AND CONSTRUCTION SOCIETY LTD L1 |
|---|---|---|---|---|---|
| 1.00 | Earthwork Undressed involving an avg. horizontal throw upto 2 mtr. and an avg. Vertical Lift upto 0.5 mtr. including Breaking of Clods CSR Item 6.2 (a) | 1 | Cum | 90 ₹90 | 84 ₹84 |
| 2.00 | Earthwork Undressed With Combined Lead Upto 15m including breaking of clods. CSR Item 6.2 (b) | 1 | Cum | 150 ₹150 | 130 ₹130 |
| 3.00 | Earthwork filling In 0.152m Layers in foundation including Ramming, Watering And Consolidation under bed. CSR Item 6.8 (b-i) | 1 | Cum | 2 ₹2 | 1.25 ₹1.25 |
| 4.00 | Re-handling of earthwork recently executed CSR Item 6.2 (a)-note II | 1 | Cum | 190 ₹190 | 170 ₹170 |
| 5.00 | Dressing of New Earthwork CSR Item 6.3 (i) | 1 | Sqm | 80 ₹80 | 79 ₹79 |
| 6.00 | Dag belling single kassi stroke minimum 7.5 cm depth. CSR Item 6.18 (a) | 1 | KM | 1,500 ₹1,500 | 1,300 ₹1,300 |
| 7.00 | Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of Bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres. | 1 | Cum | 200 ₹200 | 100 ₹100 |
| 8.00 | Dismantling Brick Work in Cement 8.5(b) | 1 | Cum | 20 ₹20 | 15 ₹15 |
| 9.00 | Dressing of Bed and Preparation of Sub-grade for Lining. CSR Item 19.1 | 1 | Sqm | 200 ₹200 | 100 ₹100 |
| 10.00 | First Class Burnt Brick laid in 1:6 Cement Sand Mortar for Bed & Side walls CSR Item 11.3 (i) | 1 | Cum | 800 ₹800 | 750 ₹750 |
Updated dates
Tender Value
₹4.4 Cr
EMD Value
₹87,320
Closing Date
5 May 2026, 11:00 amClosed
Divisional Engineer, Fazilka and Harike Division
Divisional Engineer, Fazilka and Harike Division
ESTIMATE FOR LINING / RELINING OF WATERCOURSES OF O/L 107114-L OF PATTI DY , RAIPUR BLEEM DISTRICT- TARNTARN UNDER UBDC CANAL SYSTEM.(LENGTH 1382 MTR)
2026_WR_159857_108
NIT 04 of 2026
Open Tender
Civil Works
60 days
Tarn Taran
Please refer Tender documents.
4 documents required · 4 mandatory
₹2,000
₹87,320
Yes
14 May 2026
8 Apr 2026
5 May 2026
8 Apr 2026
5 May 2026
8 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Earthwork Undressed involving an avg. horizontal throw upto 2 mtr. and an avg. Vertical Lift upto 0.5 mtr. including Breaking of Clods CSR Item 6.2 (a) | - | Cum | - | - | BI01010001010000000000000515BI0100001114 |
| 2 | Earthwork Undressed With Combined Lead Upto 15m including breaking of clods. CSR Item 6.2 (b) | - | Cum | - | - | BI01010001010000000000000515BI0100001115 |
| 3 | Earthwork filling In 0.152m Layers in foundation including Ramming, Watering And Consolidation under bed. CSR Item 6.8 (b-i) | - | Cum | - | - | BI01010001010000000000000515BI0100001116 |
| 4 | Re-handling of earthwork recently executed CSR Item 6.2 (a)-note II | 1 | Cum | - | - | BI01010001010000000000000515BI0100001117 |
| 5 | Dressing of New Earthwork CSR Item 6.3 (i) | 1 | Sqm | - | - | BI01010001010000000000000515BI0100001118 |
| 6 | Dag belling single kassi stroke minimum 7.5 cm depth. CSR Item 6.18 (a) | - | KM | - | - | BI01010001010000000000000515BI0100001119 |
| 7 | Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of Bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres. | - | Cum | - | - | BI01010001010000000000000515BI0100001120 |
| 8 | Dismantling Brick Work in Cement 8.5(b) | - | Cum | - | - | BI01010001010000000000000515BI0100001121 |
| 9 | Dressing of Bed and Preparation of Sub-grade for Lining. CSR Item 19.1 | - | Sqm | - | - | BI01010001010000000000000515BI0100001122 |
| 10 | First Class Burnt Brick laid in 1:6 Cement Sand Mortar for Bed & Side walls CSR Item 11.3 (i) | - | Cum | - | - | BI01010001010000000000000515BI0100001123 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.17 MB
Tendernotice_2.pdf
PDF • 0.60 MB
TB51.xls
Tender Documents • 0.05 MB
BOQ_335828.xls
BOQ • 0.33 MB