| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹83.1 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹88.7 L+₹5.6 L (6.70%)Rejected-AOC | L2 | Rejected-AOC L2 |
Tender Value
₹86.9 L
EMD Value
₹87,000
Closing Date
8 Jul 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Addl. Collector (Dev) / Project Director, DRDA
DRDA, Dharmapuri
1. B.Thurinjipatti - Jayanthi colony road KM 0/0 - 0/650 2.Ajjampatti - Sethapalaiyam road KM 0/0-1/140 3.Pudur - Kariyathathanur road KM 0/0-0/7
2023_RDTN_331799_1
Roc.No.1231/2023/R2 Dt.15.06.2023 MGSMT P97
Open Tender
Civil Works
Item Rate
180 days
DRDA
Can be seen in the tender documents
2 documents required · 2 mandatory
₹0
₹87,000
7 Aug 2023
26 Jun 2023
8 Jul 2023
26 Jun 2023
8 Jul 2023
26 Jun 2023
Amount
Strengthening of the road from B.Thurinjipatti - Jayanthi colony road Km.0/0-0/650 (Plastic Waste)
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes scrubs, saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201 in all etc complete
Picking up existing BT surface upto 5 to 10 cm of old metalled surface, cambering, sectioning of carriage way etc., complete
collection and supply of carted earth from approved quarry an average lead 1km including cost and conveyance of all materials to site anf labour charges etc.
Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for side berms.
Providing and laying 75mm compacted thick WBM Grade III using 1 cum of 63mm to 11.20mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre- measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III) revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for TOP LAYER
Applying tack coat over WBIM vrfice treated with primer) using 4Kg of bituminous emulsion per 10 Sqm including cost of binminous emulsion which will be supplied) departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants. employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification.
Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 23.232Kg of bitumen and 1.168 Kg of Plastic waste for 10 Sqm. of premix carpet including laying of seal coat 'A' over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com.
Road Making with Hot applied Thermoplastic Compund
Provision for HM Stone
Provision for Name Board
Routine Maintenance** after completion of construction works (Lump-sum Amount for each year Per Km.)
For 1st year maintenance
For 2nd year maintenance
For 3rd year maintenance
For 4th year maintenance
For 5th year maintenance
Strenthening of road from Ajjampatti- Sethapalayiyam road Km. 0/0-140
Clearing the scrub jungles including cutting the scrubs and removing away from site etc complete
Picking up existing BT surface upto 5 to 10 cm of old metalled surface, 4 cambering, sectioning of carriage way etc., complete
collection and supply of carted earth from approved quarry an average lead 1km including cost and conveyance of all materials to site anf labour charges etc.
Collection and supply of Girrty gravel for side berms and labour charges for filling etc complete
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam (WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying PRIME COAT over the WMM surface using 7.00 Kg of Bituminous Emulsion SS I for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying prime coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification.
Providing and laying TACK COAT over the WMM surface (treated with primer) using 2.50 Kg of Bituminous Emulsion RS I for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification.
Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks, paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Road Marking with Hot applied Thermoplastic Compund
Supply and Fixing of HM Stone
Supply and Fixing of KM Stone
Provision for Sign Board
Provision for Name Board
Routine Maintenance** after completion of construction works (Lump-sum Amount for each year Per Km.)
For 1st year maintenance
For 2nd year maintenance
For 3rd year maintenance
For 4th year maintenance
For 5th year maintenance
Strenthining of road from Pudur- Kariyathathanur road K.0/0-0/7 (Plastic waste)
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes scrubs, saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201 in all etc complete
Picking up existing BT surface upto 5 to 10 cm of old metalled surface, cambering, sectioning of carriage way etc., complete
collection and supply of carted earth from approved quarry an average lead 1km including cost and conveyance of all materials to site anf labour charges etc.
Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for side berms.
Providing and laying 75mm compacted thick WBM Grade III using 1 cum of 63mm to 11.20mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre- measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III) revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for TOP LAYER
Applying tack coat over WBIM vrfice treated with primer) using 4Kg of bituminous emulsion per 10 Sqm including cost of binminous emulsion which will be supplied) departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants. employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification.
Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 23.232Kg of bitumen and 1.168 Kg of Plastic waste for 10 Sqm. of premix carpet including laying of seal coat 'A' over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com.
Road Making with Hot applied Thermoplastic Compund
Provision for HM Stone
Provision for Name Board
Routine Maintenance** after completion of construction works (Lump-sum Amount for each year Per Km.)
For 1st year maintenance
For 2nd year maintenance
For 3rd year maintenance
For 4th year maintenance
For 5th year maintenance
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
SIVA KUMAR
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .