Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹49.4 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹50.9 L+₹1.5 L (2.94%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹51.2 L+₹1.8 L (3.62%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹52.6 L+₹3.1 L (6.37%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹58.0 L+₹8.6 L (17.3%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹83.9 L
EMD Value
₹1.7 L
Closing Date
7 Aug 2026, 6:00 pmClosed
Executive Engineer PWD(RandB)nagrota Jammu
Executive Engineer PWD RandB Divison Nagrota
Construction of Kote and Stone at NCC Training Academy Nagrota (under Capex Budget 2026-27)
2026_PWDJK_316610_9
Short e-NIT No. 44 of 2026-2027/Nagrota Dated 17-07-2026
Open Tender
Civil Works
Percentage
150 days
Executive Engineer PWD(RandB)nagrota Jammu
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,500
Yes
Executive Engineer PWD RandB Divison Nagrota
₹1.7 L
Yes
14 Aug 2026
17 Jul 2026
8 Aug 2026
17 Jul 2026
7 Aug 2026
18 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | General site clearance, including levelling of ground, if any including disposal of mulba, (Subject to actual site conditions). | 4 | No | 553 | ₹2,212 |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil : | 132.84 | Cum | 479.3 | ₹63,670.21 |
| 3 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 46.66 | Cum | 218.4 | ₹10,190.54 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 35.82 | Cum | 5,202.9 | ₹1,86,367.88 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 28.28 | Cum | 5,733.6 | ₹1,62,146.21 |
| 6 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 73.95 | Cum | 7,788.4 | ₹5,75,952.18 |
| 7 | Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work including pumping of R.M.C. from transit mixer to site of laying , excluding the cost of centering, shuttering finishing and reinforcement including cost of admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer- in - charge. Note: - Cement content considered in this item is @ 330 kg/ cum. Excess/ less cement used as per design mix is payable/ recoverable separately. All works above plinth level upto floor V level | 92.78 | Cum | 9,911.1 | ₹9,19,551.86 |
| 8Centering and shuttering including strutting, propping etc. and removal of form work for: | |||||
| 8.01 | Foundations, footings, bases for columns | 274.56 | Sqm | 286.35 | ₹78,620.26 |
| 8.02 | Suspended floors, roofs, landings, balconies and access platforms. | 308.85 | Sqm | 718.2 | ₹2,21,816.07 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.33 MB
BOQ_1033417.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .