| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAccepted-AOC JP NAGAR GALI NO 3 NAINI PRAYAGRAJ | PRAYAGRAJ | PRAYAGRAJ | UTTAR PRADESH | ₹1.4 Cr Quoted ₹1.2 Cr | L1 | Accepted-AOC AS PER LOA |
| 2 | L2₹1.3 CrRejected-Finance 25A CHAK HARINANDAN NAIN PRAYAGRAJ | PRAYAGRAJ | PRAYAGRAJ | UTTAR PRADESH | ₹1.3 Cr | L2 | Rejected-Finance AS PER RATE |
| 3 | L3₹1.6 CrRejected-Finance 108 BADA CHAKA NAINI ALLAHABAD | ALLAHABAD | PRAYAGRAJ | UTTAR PRADESH | ₹1.6 Cr | L3 | Rejected-Finance AS PER RATE |
| 4 | L4₹1.7 CrRejected-Finance | ₹1.7 Cr | L4 | Rejected-Finance AS PER RATE |
| 5 | L5₹1.8 CrRejected-Finance MIRZAPUR UTTAR PRADESH UP | ₹1.8 Cr | L5 | Rejected-Finance AS PER RATE |
Tender Value
₹2.6 Cr
EMD Value
₹15.2 L
Closing Date
13 Feb 2026, 3:00 pmClosed
SE, PRAYAGRAJ CIRCLE, PWD, PRAYAGRAJ
SE, PRAYAGRAJ CIRCLE, PWD, PRAYAGRAJ
Widening and Strengthening work of Meja Railway Station to Ramnagar Paranipur Marg Chaiange 10 000 to 13 175
2026_CEALD_1111157_1
450/10Com(P)-PRJ.CIRCLE/2025 DATED 20.01.2026
Open Tender
Civil Works - Roads
PRAYAGRAJ
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹15.2 L
SE, PRAYAGRAJ CIRCLE, PWD, PRAYAGRAJ
17 Mar 2026
31 Jan 2026
13 Feb 2026
31 Jan 2026
13 Feb 2026
31 Jan 2026
6 Feb 2026
Excavation in Soil using Hydraulic Excavator and Tippers with Disposal upto 1000 metres. Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m
Construction of Embankment with Material Deposited from Roadway Cutting Construction of embankment with approved material obtained from right of way with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.
Construction of Subgrade and Earthen Shoulders Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2
Granular Sub-Base with Graded Material (Table:- 400-1) Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401
Wet Mix Macadam (Plant Mix Method) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
Prime coat Providing and applying primer coat with SS1 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means.
Dense Graded Bituminous Macadam Grading 2 Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects.
Tack coat Providing and applying tack coat with bitumen (VG-10) using bitumen pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical
Bituminous Concrete Providing and laying bituminous concrete with 100 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects
Excavation for Structures Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.
PCC 1:3:6 in Foundation Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
Stone masonary. Stone Masonry Work in Cement Mortar 1:3 in Foundation complete as per Drawing and Technical Specifications.
Pointing Pointing with cement mortar (1:3 ) on brick work in substructure as per Technical Specifications
Plastering Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical Specifications
Laying Reinforced cement concrete pipe NP4/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets . 600 mm
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.94 MB
BOQ_2052553.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid