| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.7 LAccepted-AOC | L1 | Accepted-AOC L1 bidder | |
| 2 | L2₹20.5 L+₹55,596 (2.79%)Rejected-Finance INDEX NO D 35 ADG NEI GUWAHATI OLD HASIMARA POST HASIMARA DIST ALIPURDUAR WB PIN 735215 | ALIPURDUAR | WEST BENGAL | 735215 | L2 | Rejected-Finance Other than L1 bidder | |
| 3 | L3₹20.7 L+₹76,214 (3.83%)Rejected-Finance | L3 | Rejected-Finance Other than L1 bidder | |
| 4 | L4₹20.7 L+₹77,204 (3.88%)Rejected-Finance | L4 | Rejected-Finance Other than L1 bidder | |
| 5 | L5₹20.7 L+₹79,353 (3.99%)Rejected-Finance | L5 | Rejected-Finance Other than L1 bidder |
Tender Value
₹20 L
EMD Value
₹40,000
Closing Date
19 Feb 2020, 6:00 pmClosed
CWE (AF) Bagdogra
Commander Works Engineers (AF) Bagdogra Bagdogra Airport (WB) Pin- 734 421 Tele 0353 - 2898308
REPAIR/ MAINT OF CENTRAL AC PLANT AND PACKAGE AC PLANT AT AF STATION HASIMARA UNDER GE (AF) HASIMARA
2020_MES_319803_1
8425/HAS/2019-20/E8
Open Tender
Machineries/ Mechanical Engg Items
Item Rate
240 days
Hasimara
MES Contractor enlisted as Class E category c(i) having deposited Standing Security of Rs 50,000.00 with dept. Contractors not enlisted in MES should meet the MES enlistment criteria corresponding to appropriate class and category.
10 documents required · 10 mandatory
₹500
GE (AF) Hasimara
₹40,000
Yes
1 May 2020
30 Jan 2020
24 Feb 2020
30 Jan 2020
19 Feb 2020
14 Feb 2020
30 Jan 2020 - 19 Feb 2020
Amount
Note 1: (Applicable for all parts/items) : The bidders/ contractors are advised to read tender document, all drawings & all corrigendum/amendments and general condition of contracts before entry/quoting the rates. Note 2:- Attention to bidder is hereby invited to upload revised BOQ if published during their bid submission. Uploading of incorrect/ pre-revised BOQ shall be treated as non bonafide and rejected. Fixed credit has been given in technical documents which shall be taken into account during acceptance of bid/tender.
Dismantling of Compressor set Model No. SM18554RC for central type air-conditioner 12.5 TR of Make: Denfoss Scroll type compressor and refitting new compressor, leak testing, carrying out pressure test by charging Nitrogen gas and removing the nitrogen gas and charging of refrigerant gas including charging of additional gas as required and providing washers, gaskets and testing for smooth functioning all as specified and directed. Note:- i) Refrigerant gas required for the job will be measured and paid seperately under relevant items as supply only. (ii) Compressor will be measured and paid seprately as supply only.
Supply only Compressor 12.5 TR Scroll type Model No. SM18554RC complete all as specified and directed. Make: Denfoss or equivalent.
Supply & fixing Dryer size 5/8 , length 165 mm complete as per existing one and all as directed
Supply & fixing Water Temperature sensor complete as per existing one all as specified and directed.
Supply & fixing Controller complete as per existing one all as specified and directed.
Supply & fixing Main Contactor complete as per existing one and all as specified and directed.
Supply & fixing PCB control power supply unit incomimg 230 V outgoing 15 V, 1 Amp complete as per existing one complete all as specified and directed.
Dismantling condense unit assembly and repair/ replacement of copper tube, testing complete and refixing the same complete all as specified and directed. Note: Cost of Tansportation from site to workshop (If any ) and back is deemed to be included in the quoted rate.
Dismantling chiller unit assembly and repair/ replacement of copper tube and testing complete and re-fixing the same all as specified and directed. Note: Cost of Tansportation from site to workshop (If any ) and back is deemed to be included in the quoted rate.
Supply & fixing Water pressure guage and valve 5/8" capacity 7 kg/cm2 complete as per existing one all as specified and directed.
Servcing and overhaulling of induced draft top discharge counterflow type FRP cooling tower (Rectanguler/ Round bottle shape) capacity with FRP body and base, incl repairs to damage water spray headers, cooling tower fills and supporting base frame as per site requirement incl testing for proper fuctioning complete all as specified and directed . Note : cost of spare parts required is deemed to be included in the quoted rate.
Taking out / purging of refrigerant gas from the system of A/C plant 3 x 15 TR capacity for carrying out vacuum test by vacuuming the whole A/C plant with the help of vacuum pump and checking the complete system for leakages, Carrying out the pressure test by charging the nitrogen gas in the system and checking of any leakage point, repair / rectification of the same and removing the nitrogen gas from the system and charging of refrigerant gas including charging of additional gas as required complete all as specified and directed. Note: (i) The arrangement of T&P and Nitrogen gas shall be contractors responsibility) (ii) Refrigerant gas shall be measured and paid separately as supply only.
All as per item No. 13.00 above for 3 x 30 TR unit of A/C plant for (I Lab).
Dismantling of complete existing defective copper tubing of loader / unloader and control switches LP/HP/OP pressure gauge and S&F new copper pipe heavy-duty ¼” dia soft quality RM for compressor connection, loader / unloader , control device / pressure control switch, pressure gauge, hand shut off valve including S & F ¼” brass flair nut for all copper tube and clipped on copper plate of required size including cupper tubing accessories as per size requirement complete all as specified and directed.
S&F in repair Loader / Unloader valve of existing size of model SMC-65 compressor complete all as speified and directed. Make: Rotex/ASCO parkar or equivalent
S&F in repair pilot control solenoid valve for SMC-65 compressor complete all as speified and directed.
S&F in repair thermostat expansion valve suitable for 15 to 30 TR complete all as speified and directed. Make: Sporlan, Danfoss or equivelent.
S&F in repair of liquid line stainer filter for SMC-4-65 complete all as specified and directed.
S&F in repair of liquid line stainer filter for SMC-8-65 complete all as specified and directed
S&F in repair discharge service valve of compressor of ACCEL make Model SMC-4-65 complete all as specified and directed
S&F in repair suction service valve of compressor of ACCEL make Model SMC-4-65 complete all as specified and directed
S&F in repair discharge service valve of compressor of ACCEL make Model SMC-8-65 complete all as specified and directed.
S&F in repair shaft seal assembly of compressor of ACCEL make Model SMC -4-65 and 8-65 complete all as specified and directed.
Dismantling complete Compressor set, 30 TR capacity of make ACCEL, Model SMC-8-65 and overhauling the compressor by repair and checking of worn out holes of studs and providing over size studs with nuts, washers and gaskets. Remetalling, rethreadind and balancing of piston, replacement of piston ring, scrapper ring, split pin, castle nut, bushing for piston pin and set of sealing ring of compressor including necessary machine work and replacement of other defective spares, re-assembling the compressor set after repair and testing for smooth functioning complete all as specified and directed. Note:- i) Spare parts shall be measured and paid as supply only under relevent items. (ii) Cost of Tansportation from site to workshop (If any ) and back is deemed to be included in the quoted rate.
supply only suction valve ring plate for compressor set, 30 TR capacity of Make: Accel , Model: SMC-8-65 complete all as specified and directed
All as per serial item No. 26.00 above but Discharge valve ring plate complete.
All as per serial item No. 26.00 above but Safty valve assembly complete.
All as per serial item No. 26.00 above but connecting rod bolt complete.
All as per serial item No. 26.00 above but Lock nut crankshaft complete.
All as per serial item No. 26.00 above but Split pin complete.
All as per serial item No. 26.00 above but Half section of BRG 0.75mm under size complete.
All as per serial item No. 26.00 above but Bushing with detachable collar complete.
All as per serial item No. 26.00 above but Piston with pin and rings complete.
All as per serial item No. 26.00 above but Bushing for piston pin complete.
All as per serial item No. 26.00 above but Valve spring complete.
All as per serial item No. 26.00 above but Spring for unloading pin complete.
All as per serial item No. 26.00 above but Set of Gasket SMC 8-65 complete.
All as per serial item No. 26.00 above but Set of sealing ring complete.
All as per serial item No. 26.00 above but Set of Neoprene O ring complete.
All as per serial item No. 26.00 above but Cylinder linder with suction valve complete.
All as per serial item No. 26.00 above but Seeger ring complete.
All as per serial item No. 26.00 above but Suction Strainer for SMC 8-65 complete.
All as per serial item No. 26.00 above but Oil Strainer complete.
All as per serial item No. 26.00 above but Hand shut off valve complete.
All as per serial item No. 26.00 above but Set of dowty ring complete.
All as per serial item No. 26.00 above but Set of Aluminum packing complete.
All as per serial item No. 26.00 above but Oil pump repair kit complete.
All as per serial item No. 26.00 above but Oil pump complete.
All as per serial item No. 26.00 above but Unloader cylinder assembly complete.
All as per serial item No. 26.00 above but Single frame for unloading complete.
All as per serial item No. 26.00 above but Oil pressure valve complete.
Dismantling complete Compressor set, 15 TR capacity of make Accel, Model SMC-4-65 and overhauling the compressor by repair and checking of wornout holes of studs and providing over size studs with nuts & washers and gaskets, remetalling, rethreading and balancing of piston, replacement of piston ring, scrapper ring, split pin, castle nut, bushing for piston pin and set of sealing ring of compressor including necessary machine work and replacement of other defective spares, re-assembling the compressor set after the repair and testing for smooth functioning complete all as specified and directed. Note:- i) Spare parts shall be measured and paid as supply only under relevent item. (ii) Cost of Tansportation from site to workshop (If any ) and back is deemed to be included in the quoted rate.
supply only suction valve ring plate for compressor set, 15 TR capacity of Make: Accel , Model: SMC-8-65 complete all as specified and directed.
All as per serial item No. 54.00 above but Discharge valve ring plate complete.
All as per serial item No. 54.00 above but Safety valve assembly complete.
All as per serial item No. 54.00 above but connecting rod bolt complete.
All as per serial item No. 54.00 above but Lock nut crank shaft complete.
All as per serial item No. 54.00 above but Split pin complete.
All as per serial item No. 54.00 above but Half section of BRG 0.75mm under size complete.
All as per serial item No. 54.00 above but Bushing with collar 0.75mm under size complete.
All as per serial item No. 54.00 above but Piston with pin and rings complete.
All as per serial item No. 54.00 above but Bushing for piston pin complete.
All as per serial item No. 54.00 above but Valve spring complete.
All as per serial item No. 54.00 above but Spring for unloading ring complete.
All as per serial item No. 54.00 above but Set of Gasket SMC 4-65 complete.
All as per serial item No. 54.00 above but Set of sealing ring complete.
All as per serial item No. 54.00 above but Set of Neoprene O ring complete.
All as per serial item No. 54.00 above but Cylinder liner with suction valve complete.
All as per serial item No. 54.00 above but Seeger ring complete.
All as per serial item No. 54.00 above but Suction stainer SMC 4-65 complete
All as per serial item No. 54.00 above but Oil Strainer complete.
All as per serial item No. 54.00 above but Hand shut off valve complete.
All as per serial item No. 54.00 above but Set of dowty ring complete.
All as per serial item No. 54.00 above but Set of Aluminum packing complete.
All as per serial item No. 54.00 above but Oil pump repair kit complete.
All as per serial item No. 54.00 above but Oil pump complete.
All as per serial item No. 54.00 above but Unloader cylinder assembly complete.
All as per serial item No. 54.00 above but Single frame for unloading complete.
All as per serial item No. 54.00 above but Oil pressure regulator valve complete.
Dismantling the power supply of electric motor any type including carrying to workshop with necessary transportation and opening the complete motor, rewinding the rotor with super enameled copper wire as per the existing gauge with necessary insulation, sticks and varnishing, including replacement of shaft bearing 02 Nos complete of capacity 15 to 20 HP complete all as specified and directed.
All as per item No. 81.00 above but of capacity 5 to 7.5 HP electric motor any type.
Dismantling complete Centrifugal /Mono Block pump set of any type and overhauling the pump re-threading of wornout holes of studs and providing over size studs with nuts & washers, remetalling, rethreading and balancing of shaft, replacement of gunmetal bush bearing, gland packing of pump set and refitting the same after the repair/replacement duly all as specified and tested for smooth functioning of capacity 5 to 7.5 HP complete all as specified and directed.
Dismantling the existing unserviceable compressor of capacity 2.5 Ton, 3 phase, 440 Volt, and S & F New comperssor 2.5 Ton, 3 phase, 440 volt for split type air conditioner complete all as specified and as directed. Make : Carrier / Kirloskar / Tecumesh
Taking out the unserviceable air filter of AHUs 3 x 2.5 Ton capacity of 3 phase package type, S & F new air filter made out of Aluminum Sheet frame structure of suitable size and felt filter complete all as specified and as directed.
Supply only Refrigerant Gas R- 22 in the central AC plant where ever required to fill complete all as specified and as directed. Make : Mafron or equivalent.
Supply only Refrigerant Gas R- 134a in the central AC plant where ever required to fill complete all as specified and as directed. Make : Mafron or equivalent.
Supply only Refrigerant Gas R- 407C in the central AC plant where ever required to fill complete all as specified and as directed. Make : Mafron or equivalent.
Supply and filling of compressor oil suitable for R-22 gas wherever required to fill complete all as specified and directed. Make : Freeze Oil or equivalent.
Supply and filling of compressor oil suitable for R-134a gas wherever required to fill complete all as specified and directed. Make : Freeze Oil or equivalent.
Dismantling the existing unservceable sensing unit of ductable Spit AC 7.5 TR, S & F new sensing unit of ductable split AC unit 7.5 TR complete all as specified and as directed.
Dismantling the existing unserviceable outdoor blower motor of the following capacities, S & F new outdoor blower motor 0.5 HP/ 1.0 HP as required for below mentioned plants, complete all as specified and as directed.
Moter for 7.5 TR capacity
Moter for 8.5 TR capaicity
Dis-connecting and removing the burnt out electrical accessories i.e. Main Contactor ML - 3 with coil Voltage of 230 Volt capacity and replacing the same with new one of the same capacity including connecting and testing complete all as specified and directed. Make : L & T or equivalent.
All as per item No 93.00 above but for Main Contactor ML - 4 with coil Voltage of 230 Volt complete all as specified and directed. Make L & T
All as per item No 93.00 above but contactor 4 pole 25 Amp from existing position without any damage and S & F new contactor 4 pole 25 Amp complete all as specified and as directed.
All as per item No 93.00 above but for ML Relay including connector block 20 to 32 Amps complete all as specified and directed. Make: L&T or equivalent
All as per item No 93.00 above but for ML Relay including connector block 6 to 10 Amps complete all as specified and directed. Make : L &T or equivalent.
All as per item No 92 here-in-before but for MN relay including connector block 28 to 42 Amps Make : L & T
All as per item No 93.00 here-in-before but for Ammeter 0 to 100 Amps CT type including suitable CT coils of 03 Nos complete all as specified and directed.
All as per item No 93.00 here-in-before but for Volt meter 0 to 500 Volts complete all as specified and directed.
All as per item No 93.00 here-in-before but of indicating lamp set (RYB) LED type complete all as specified and directed.
Supply and replacement of temporature gauge (thermometer) digital type 0-50o C complete all as specified and directed.
S & F Rotary switch 3 position complete all as specified and directed. Make : C&S/ kaycee
Dismantling the Unserviceable copper tube and insulation tube, Supply and fixing of Copper tube 5/8" spare parts suitable for 7.5 TR ductable split type AC plant complete all as specified and as directed.
All as per item No 104.00 above but for copper tube 1/2"
All as per item No 104.00 above but for copper tube 1/4"
All as per item No 104.00 above but for copper tube 3/8"
All as per item No 104.00 here-in-before but for Insulation tube 5/8"
All as per item No 104.00 here-in-before but for Insulation tube 1/2"
All as per item No 104.00 here-in-before but for Insulation tube 1/4"
All as per item No 104.00 here-in-before but for Insulation tube 3/8"
M&L for perimeter setting complete all as specified and as directed.
Repairs to Pakage type air conditioner in situ position of capacity mentioned below of any make and any type by replacing unserviceable compressor and other parts from the machine including charging of refrigerant gas after vaccuming and leak testing including brazing the suction / discharge tubes where required and cleaning of condensing unit to achieve proper cooling effect, checking of electronic circuit of machine and repair where necessary by replacing electronic parts and changing of wirings with of PVC insulated wires as per existing type and testing, commissioning complete all as specified and as directed. Note : (i) Compressor and other parts needed for repair shall be measured and paid separately under relevent item given in schedule 'A' here in after as supply only. (ii) Existing refrigerant gas shall be preserved in a empty cylinder for re-use in new compressor and additional requirement of refrigerant charging shall be measured and paid separately under relevant item of this schedule. (iii) Repair of canvas cover of Blower unit (AHU) if damage by the out source shall be supplied by contractor at his own and rate for the same are deemed to included with the unit rate. (a) 3X2.5 TR capacity installed at Bomb Dump, Base Ops
Supply only new compressor 2.5 TR capacity 3 phase 440 V complete all as specified and directed. Make: Emerson/Carreir
Supply Condenser unit assembly 3 x 2.5 TR complete as per existing all as specified and directed.
All as per item No 113.00 above but for 8.5 TR capacity installed at Instrument Lab and Safety Section.
De-scaling of the Condenser unit of 3x35 TR capacity by circulating de-scaling agent (HCL) through Condenser by forced feed type method by removing the end cover of the condenser, cleaning each tube of the condenser carefully without damaging the tube by brushing, re- fixing back and end cover with rubber washers and teflon tape which is ever is necessary complete all as specified and directed.
All as per item No 117.00 above but for 3 X 12 TR capacity.
All as per item No 117.00 above but for 3 X 15 TR capacity.
All as per item No 117.00 above but for 3 X 30 TR capacity.
De-scaling of the Chiller unit of 24 TR capacity TR Compressor unit by circulating, de-scaling agent (HCL) through Chiller and chiller lines by forced feed type method through the cleaning joints, flushing and washing out the units thoroughly and re-fixing back of the joints with rubber washers and teflon tape whichever is necessary complete all as specified and directed.
Cleaning of the Evaporation coils (AHU Coils) of the 70 TR capacity with cleaning solvent by forced feed method to remove unwanted dust formed on the cooling coils fins, cleaning of the filters, greasing to the AHU blower bearings etc and testing complete all as specified and directed.
M/S ANNI ENTERPRISE
M/S S K BOSE AND CO
Shree Ram Construction
BEEPEE AND COMPANY
SARKAR ENGINEERING CO.
KD SAHA and CO.INDIA
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .