Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
Closing Date
19 Feb 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE ENGINEER REW KUPWARA
EXECUTIVE ENGINEER REW KUPWARA
Development of Eidgah by way of channel fencing stage 2
2022_RDPR_160490_1
NIT No147 2021-22 3rdFresh
Open Tender
Civil Works
Item Rate
60 days
EXECUTIVE ENGINEER REW KUPWARA
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Yes
EXECUTIVE ENGINEER REW KUPWARA
Yes
19 Feb 2022
14 Feb 2022
19 Feb 2022
14 Feb 2022
19 Feb 2022
14 Feb 2022
14 Feb 2022 - 14 Feb 2022
60 days
Amount
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:in all kinds of soils
Providing & Laying of dry stone soling dry hand packed including all types of carriages
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)
Centring and shuttering incld. Strutting, proping etc & removal of form work for Founadtions, footings, bases of columns for mass concrete
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
12mm Cement plaster of mix: 1 : 4 ( 1 cement : 4 fine sand)
Hand-packing stones in wire-crates; excluding cost of crates and stones
Laying of earth filing behind crate work to level the surface of Eid-Gah I/C carriage by MT 5k m
Supply of 2nd class stones for crate work, including all types of carriages
Cost of crates ,black annealed wire crates of size 8 S.W.G of mesh size 100mm x 100 mm , incuding carriages by all means
Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
Providing and fixing G.I. chain link fabric fencing of required width in mesh size 50x50 mm including strengthening with 2 mm dia wire or nuts, bolts and washers as required complete as per the direction of Engineer-incharge. Made of G.I. wire of dia 4 mm
Carriage of materials sand bajri By Mech.Transport, incld. loading, unloading etc. from source to site of work 30 KM
Painting steel work with deluxe multi surface paint of required shade to give an even shade. Two or more coats applied @ 0.90litre/10sqm over an under coat of primer applied @ 0.80litre/10sqm of approved brand and manufacture
Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. Welded
Provision for sign boards,photographs etc
stage.html
html • 0.01 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .