| 1 | L1₹17.7 LAccepted-AOC | L1 | Accepted-AOC AOC | |
| 2 | L2₹18.9 L+₹1.2 L (7.04%)Rejected-Finance TAMIL NADU | THIRUVALLUR | TAMIL NADU | 600019 | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | S PALANISAMY L2 | R IYAPPAN L1 |
|---|---|---|---|---|---|
| 1.00 | Earthwork excavation and depositing on bank with an initial lead of 10m and lift of 2m in the following classification of soils as directed by Deparment officers. Hard stiff clay, block cotton, hard red earth shales, murram, ordinary gravel, stoney eart (First depth of 2m ) | 263.78 | cum | 60 ₹15,826.8 | 58 ₹15,299.24 Lowest |
| 2.00 | Earthwork excavation and depositing on bank with an initial lead of 10m and lift of 2m in the following classification of soils as directed by Deparment officers. Hard stiff clay, block cotton, hard red earth shales, murram, ordinary gravel, stoney eart (2 nd Depth) | 263.78 | cum | 9 ₹2,374.02 | 8.5 ₹2,242.13 Lowest |
| 3.00 | Sand filling for foundation with clear river sand including cost of sand watering, ramming and consolidation etc complete as directed by Department officers. | 2,214.4 | cum | 5 ₹11,072 | 4.1 ₹9,079.04 Lowest |
| 4.00 | Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete as directed by Department officers. | 6,002.32 | cum | 5 ₹30,011.6 | 4.1 ₹24,609.51 Lowest |
| 5.00 | RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete as directed by Department- For footing below G.L. ( 1,50 to 4,50 below GL ) | 9,361.24 | cum | 13.52 ₹1,26,563.96 | 13.2 ₹1,23,568.37 Lowest |
| 6.00 | For Column and Brace upto G.L ( 0 to1,50 below GL ) | 9,222.47 | cum | 1.75 ₹16,139.32 | 1.7 ₹15,678.2 Lowest |
| 7.00 | For column and brace I 0 to 4.50m from GL | 9,363.54 | cum | 2.83 ₹26,498.82 | 2.75 ₹25,749.74 Lowest |
| 8.00 | For column and brace II 4.50m to 7.32m from GL | 9,641.43 | cum | 2.22 ₹21,403.97 | 2.2 ₹21,211.15 Lowest |
| 9.00 | For column and brace III 7.32 to 10.98m from GL | 9,919.32 | cum | 2.53 ₹25,095.88 | 2.4 ₹23,806.37 Lowest |
| 10.00 | For column beam floor slab side wall from 10.98m to 14.64 m from GL | 10,197.21 | cum | 11.38 ₹1,16,044.25 | 11.3 ₹1,15,228.47 Lowest |
Tender Value
₹18 L
EMD Value
₹18,000
Closing Date
20 Jan 2026, 6:50 pmClosed
Block Development Officer(B.P), Kumaratchi
Block Development Officer(B.P), Kumaratchi
Providing new 30000 Lts capacity OHT at Kaliyammankoil Street in T Puthur Panchayat Kumaratchi PU under PMAGY 2025-26
2026_RDTN_640898_7
PMAGY2026
Open Tender
Civil Works
Works
120 days
PU-Kumaratchi
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹18,000
Yes
10 Mar 2026
9 Jan 2026
20 Jan 2026
9 Jan 2026
20 Jan 2026
9 Jan 2026
Earthwork excavation and depositing on bank with an initial lead of 10m and lift of 2m in the following classification of soils as directed by Deparment officers. Hard stiff clay, block cotton, hard red earth shales, murram, ordinary gravel, stoney eart (First depth of 2m )
Earthwork excavation and depositing on bank with an initial lead of 10m and lift of 2m in the following classification of soils as directed by Deparment officers. Hard stiff clay, block cotton, hard red earth shales, murram, ordinary gravel, stoney eart (2 nd Depth)
Sand filling for foundation with clear river sand including cost of sand watering, ramming and consolidation etc complete as directed by Department officers.
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete as directed by Department officers.
RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete as directed by Department- For footing below G.L. ( 1,50 to 4,50 below GL )
For Column and Brace upto G.L ( 0 to1,50 below GL )
For column and brace I 0 to 4.50m from GL
For column and brace II 4.50m to 7.32m from GL
For column and brace III 7.32 to 10.98m from GL
For column beam floor slab side wall from 10.98m to 14.64 m from GL
For side wall, hance and Roof slab from 14.64 m to 18.30 m from GL
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding- For column footing and GL Brace
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding- For Brace I (GL 0m to 3.30 m)
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding- For Brace II (5.30m to 6.30 m )
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding- For Brace III (8.3. to 9.30 m )
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding- For Floor Beam and Bottm of Floor slab (11.30 to 12.30m )
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding- For Roof Slab (14.30m to 15.30 m )
SQUARE COLUMN- For column Below GL
SQUARE COLUMN- For column GL 0 to 3.30M
SQUARE COLUMN- For column ( 3.31m to 4.30m ).
SQUARE COLUMN- For column ( 4.31m to 5.30m).
SQUARE COLUMN- For Column (5.31m to 6.30m )
SQUARE COLUMN- For Column (6.31m to 7.30m )
SQUARE COLUMN- For Column (7.31m to 8.30m )
SQUARE COLUMN- For Column (8.31m to 9.30m )
SQUARE COLUMN- For Column (9.31m to 10.30m )
SQUARE COLUMN- For Column (10.31m to 11.30m )
SQUARE COLUMN- For Column (11.31m to 11.40m )
For Side Wall, & Floor & Roof slab sides and Haunch (CURVED SURFACE -11.30m to 15.30m)
Supplying, fabricating and placing in position of HSD steel rods for Reinforcement including the cost of steel and binding wire etc., complete and as directed by Deparment officers. (CURVED SURFACE -11.30m to 15.30m)
Painting two coats with approved cement paint over one coat of priming coat over cement plastered exposed surface of the Reservoir including cleaning, preparing the surface and curing etc., complete and as directed by Deparment officers
Providing MS Ladder & Hand rails arrangements in 30,000 Lits. Capacity OHT With 12.00m Staging Height.SOR PG no 90
Providing and fixing of RCC inner access ladder in RCC 1:1.5:3 (one cement, one and half sane! and three aggregates) using 20mm HBG stone for OHT including cost of reinforcement, placing grill in position, centering shuttering charges, mixing concrete cur
Providing GI ventilating arrangements mosquito proof nylon net with 50 mm GI pipes and cowl and as directed by Deparment officers
Supply of GI Pipes for OHT Connections 65 mm dia SOR Pg no 40
Supply and Delivery of G.M.Gate valve 65mm size SOR Pg no 45
Supply & Delivery of 65 mm G.I Tee SOR Pg no 44
Supply & Delivery of 65 mm G.I Coupling SOR Pg no 44
Supply & Delivery of 65 mm G.I bend SOR Pg no 44
Supply & Delivery of 90mm T.Coupler PVC SOR Pg no 27
Supply & Delivery of 80mm x 65mm G.I.Reducer SOR Pg no 41
Supply & Delivery of 80mm x 65mm G.I.Reducer SOR Pg no 41
Labour charges for fixing of G.I. Pipes & Specials for OHT pipe connections as directed by the Deparment Officers,
Refilling of the foundation with execavated soil in layers of thick including ramming watering etc., complete as directed by the Department officers
Construction of Platform (Sub-Estimate)- Earthwork excavation and depositing on bank with an intial lesd & lift in hard stiff clay, gravelly soil, shales, murrams earth mixed soil as per SS 20 B for foundation
Sand filling with good river sand including cost & conveyance of all materials to site and all labour charges for curing, compacting etc., complete.
Cement concrete in 1:4:8 mix using 40 mm metal used for foundation including cost & conveyance of all materials to site and all labour charges for curing, compacting etc., complete.
Cement concrete in 1:3:6 mix using 20 mm metal used for foundation including cost & conveyance of all materials to site and all labour charges for curing, compacting etc., complete.
Plain Cement Concrete 1:2:4 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.
Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid)
Filling the stones in soakpit incluiding the cost and conveyance of materials 40mm
Filling the stones in soakpit incluiding the cost and conveyance of materials 20mm
Filling the stones in soakpit incluiding the cost and conveyance of materials 20mm
Filling the stones in soakpit incluiding the cost and conveyance of materials 20mm
Provision for Chloriner set,Ladder Lockset
Provision for Name Board
Provision for QC Charges
Provision for Photography Charges
Contingencies and P.S. other charges etc.,
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_767568.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.81 MB
BOQ_767568.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .