Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.2 LAccepted-AOC | ₹4.2 L | L1 | Accepted-AOC Being the 1st lowest bidder |
| 2 | L2₹4.2 L+₹5,369.86 (1.29%)Rejected-AOC RIVER SIDE BHURKUNDA RAMGARH JHARKHAND | RAMGARH | RAMGARH | JHARKHAND | ₹4.2 L+₹5,369.86 (1.29%) | L2 | Rejected-AOC Being the 2nd lowest bidder |
| 3 | Rejected-Technical NAI SARAI RAMGARH CANTT DISTT RAMGARH PIN 829122 | RAMGARH | JHARKHAND | 829122 | - | - | Rejected-Technical not accepted for further evaluation |
| Sl No | Description | Qty | Unit | M/S NEW ENTERPRISES L1 | M/S DK ENTERPRISES L2 |
|---|---|---|---|---|---|
| 1.00 | Cost of copper strip
Number of copper strips= 60 No
Weight of one copper strip = 2.4 kg
Total Weight = 2.4 X 60 = 144 kg | 144 | kg | 1,228 ₹1,76,832 Lowest | 1,244 ₹1,79,136 |
| 2.00 | Cost of applying double fibre glass cover on each strip | 60 | No | 421 ₹25,260 Lowest | 426 ₹25,560 |
| 3.00 | Cost of moulding of double fiber glass covered strip | 60 | No | 1,697 ₹1,01,820 Lowest | 1,719 ₹1,03,140 |
| 4.00 | Cost of insulating materials like Nomex tape,Mica tape PGMP , Kapton tape,Polyster tape etc @ 15 % of Sl No 1.1 | 1 | job | 26,524.8 ₹26,524.8 Lowest | 26,870.4 ₹26,870.4 |
| 5.00 | Labour charge @ 15 % of Sl No 1.1 | 1 | job | 26,524.8 ₹26,524.8 Lowest | 26,870.4 ₹26,870.4 |
| 6.00 | Scrap value @ 60 % of Sl No 1.1 | 1 | job | 1,06,099.2 ₹-1,06,099.2 Lowest | 1,07,481.6 ₹-1,07,481.6 |
| 7.00 | Repairing of DE bearing housing | 1 | No | 22,995 ₹22,995 Lowest | 23,289 ₹23,289 |
| 8.00 | Providing and fixing of bearing 6316/C3 | 2 | No | 20,805 ₹41,610 Lowest | 21,071 ₹42,142 |
| 9.00 | Repairing of NDE bearing housing | 1 | No | 22,995 ₹22,995 Lowest | 23,289 ₹23,289 |
| 10.00 | Repairing of Motor fan | 1 | No | 12,045 ₹12,045 Lowest | 12,199 ₹12,199 |
Tender Value
₹4.5 L
EMD Value
₹5,700
Closing Date
25 May 2026, 5:00 pmClosed
P.E. (EnM)
Office of the Project Officer, Birsa Project, Barka-Sayal Area PIN - 825311
Repairing and rewinding of three phase 3.3 KV Marathon make 180 KW Squirrel cage HT induction motor Sl No F331235/2 installed at Birsa Project.
2026_CCL_359612_1
PE(EnM)/BIRSA/ETENDER/26-27/02
Open Tender
Electrical and Maintenance Works
Item Wise
20 days
Birsa Project
Please refer Tender documents.
5 documents required · 5 mandatory
₹5,700
9 Aug 2026
14 May 2026
26 May 2026
15 May 2026
25 May 2026
15 May 2026
15 May 2026 - 18 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cost of copper strip
Number of copper strips= 60 No
Weight of one copper strip = 2.4 kg
Total Weight = 2.4 X 60 = 144 kg | 144 | kg | - | - |
| 2 | Cost of applying double fibre glass cover on each strip | 60 | No | - | - |
| 3 | Cost of moulding of double fiber glass covered strip | 60 | No | - | - |
| 4 | Cost of insulating materials like Nomex tape,Mica tape PGMP , Kapton tape,Polyster tape etc @ 15 % of Sl No 1.1 | 1 | job | - | - |
| 5 | Labour charge @ 15 % of Sl No 1.1 | 1 | job | - | - |
| 6 | Scrap value @ 60 % of Sl No 1.1 | 1 | job | - | - |
| 7 | Repairing of DE bearing housing | 1 | No | - | - |
| 8 | Providing and fixing of bearing 6316/C3 | 2 | No | - | - |
| 9 | Repairing of NDE bearing housing | 1 | No | - | - |
| 10 | Repairing of Motor fan | 1 | No | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.49 MB
BOQ_372474.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .