| 1 | L1₹3.0 LAccepted-Finance 3 605 G F 105 SECTOR 3 VASUNDHARA GHAZIABAD UTTAR PRADESH 201012 | GHAZIABAD | UTTAR PRADESH | 201012 | L1 | Accepted-Finance As per BoQ | |
| 2 | L2₹4.0 L+₹1.0 L (34.0%)Accepted-Finance | L2 | Accepted-Finance As per BoQ | |
| 3 | Rejected-Technical | - | Rejected-Technical Due to proper Document not uploaded |
Tender Value
Refer Docs
EMD Value
₹8,200
Closing Date
29 Dec 2022, 12:00 pmClosed
SE EUDC-3 GZB
SE EUDC 3 GANDHI NAGAR GZB
For the Work of Giving 120 kva Electricity load connection for CT Scan Machine in MMG Hospital Under full Deposit Scheme in the Area of EE, EUDD-VII, Ghaziabad. under the jurisdiction of SE, EUDC-III, Ghaziabad.
2022_PVVNL_758853_1
26/W/2022-23/EUDD-VII/EUDC-III GZB
Open Tender
Electrical Works
Item Rate
90 days
SE EUDC 3 GANDHI NAGAR GZB
Please Refer Tender Document
2 documents required · 2 mandatory
₹1,180
SE EUDC-III GZB
₹8,200
19 Jan 2023
14 Dec 2022
30 Dec 2022
14 Dec 2022
29 Dec 2022
14 Dec 2022
Amount
Carriage of 250 kva 11/0.4 kv T/F from Store center gzb to work site loading and unloading both side
Carriage of 250 kva 33/0.4 kv T/F from Store center gzb to work site loading and unloading both side
Carriage of ST Pole 11 mtr long from Store center gzb to work site loading and unloading both side.
Carriage of Line material as Polymeric pin insulator, Polymeric disc insulator, Top channel. T-off channel, TF Fuse set, TPMO set, Dropper channel, Holding clamp, Nut Bolt Washer, Danger Board with clamp, 33 kv line post structure for post insulator, 33 kv line post structure for fuse set, 33 kv post Insulator, 33 kv lightening arrester, 33 kv fuse set, Earthing strip etc. from Store center gzb to work site loading and unloading both side.
Carriage of 3PX4W LT TVM ct connected cubical 200/5 from Store center gzb to work site loading and unloading both side.
Carriage of LT TVM Meter from Store center gzb to work site loading and unloading both side.
Carriage of ACSR Panther Conductor from Store center gzb to work site loading and unloading both side.
Carriage of GI Pipe 3 mtr long from Store center gzb to work site loading and unloading both side.
Carriage of LT XLPE Cable 3.5x240 sq mm from Store center gzb to work site loading and unloading both side.
Erection of ST pole 11 mtr long for making D/P with all accessories complete in all respect as per RESPO norms.
Fixing of 33 kv line post structure for post insulator, fuse set complete in all respect.
Fixing of 33 kv post Insulator complete in all respect.
Fixing of 33 kv lightening arrester complete in all respect.
Fixing of TPMO set complete in all respect.
Concreating of ST pole as per RESPO norms.
Earthing of Pole complete in all respect as per RESPO norms.
Construction Of plinth for placing of 250 kva 11/0.4 kv T/F and 250 kva 33/0.4 kv T/F size 5"x5"4" above ground level and one fit below the ground level of 9" after excavation of 4" earth. Brick ballast shall be provided and remmering will be done properly. After that a retaining wall of 9" width by first class brick in ratio 1:4:4 of cement and sand shall be made. The earth shall be filled upto one fit below the top of the plinth. After this brick ballast shsall be provided upto 6" from the earth level and proper rammeing shall be done one no jail of 12 mm. KS tal shall be fixed in the holl of plinth and one ft. thick RCC in 1:2:4 ratio of cement, sand and stone ballast shall be laid on the top of the plinth. The 12mm. thick plastering shall be done all around the plinth in 1:4 ratio of cement and sands. The contractor shall be responsible to complete the work as per direction of supervising engineer. it includes the cost of all material labour, T&P carrier etc. required for proper completion of work.
Safley Placing and Fixing of 250 KVA T/F on the plinth by the help of Crane/Chain Cuppie complete in all respect.
Water Level Pipe Earthing of 250 kva 11/0.4 kv transformer shall be done by G.I. Pipe 40mm/1 ¼" , 1 ½" dia by boaring the earth upto Waterl Level and connecting M.S. Flat of size 35x5mm with the transformers. The transformers will be earthed at different points including welding properly after cutting and welding the strips in proper shape size. The contractor shall provide the socket and Cap at upper edge of the pipe for pouring water during summer season and 1 No. cone at the bottom of the pipe for making suitable contact with the water, complete in all respect as per Respo norms.
Water Level Pipe Earthing of 250 kva 33/0.4 kv transformer shall be done by G.I. Pipe 40mm/1 ¼" , 1 ½" dia by boaring the earth upto Waterl Level and connecting M.S. Flat of size 35x5mm with the transformers. The transformers will be earthed at different points including welding properly after cutting and welding the strips in proper shape size. The contractor shall provide the socket and Cap at upper edge of the pipe for pouring water during summer season and 1 No. cone at the bottom of the pipe for making suitable contact with the water, complete in all respect as per Respo norms.
Making of all HT/LT connections 250 kva 11/0.4 kv T/F and 250 kva 33/0.4 kv T/F required to energize theT/F/line properly complete in all respect.
Providing & Fixing of chain link fencing using M.S Pipe, M.S. angle & G.S wire mesh around the distribution transformer 250 kva T/F for safety aspect to cover the DT. GS wire mesh fencing to be fabricated from M.S pipe of square hollow section. M.S Angle/M.S flat & G.I. wire as per standard drawing with vertical support part of M.S. pipe in the ground using standard cement concrete mixture. The entrance door will be fabricated as per standard norms M.S. pipe square hollow will be used of 49.5mm x 49.5mm having wt. 5.95 kg/mtr. With minimum length of 2100 mm chain link. GI wire of 10 SWG & fabrication of mesh 2”x2” with approximate wt. 3kg/sqmtr. including cost of all material, labour & loading unloading both end, as per instructions of Engineer-in-charge.
Laying Lifting and sagging of ACSR Panther Conductor with all accessories complete in all respect as per respo.
Digging of Tranch for Laying of LT XLPE Cable 3.5x240 sq mm with Laying of sand and brics.
Laying Lifting and sagging of LT XLPE Cable 3.5x240 sq mm with all accessories complete in all respect as per respo.
Leveling and restoration of road after execution of Laying of cable work.
Fixing of 3PX4W LT TVM ct connected cubical 200/5 complete in all respect.
Fixing of LT TVM Meter complete in all respect.
Making of all HT/LT connections required to energize the line and restoring of electricity supply to consumer properly complete in all respect.
Bhola electrical enterprises
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .