Tender Value
₹3.0 L
EMD Value
₹3,800
Closing Date
30 Sept 2022, 5:00 pmClosed
Area Engineer EnM
Sonepur Bazari Area, ECL
Renovation/maintenance job at 25 MVA substation under S. B. Project.
2022_ECL_255419_1
GM/SBA/EnM/e- Tender/2022-23/408
Open Tender
Electrical and Maintenance Works
Item Rate
15 days
Sonepur Bazari Area, ECL
Please refer tender documents.
6 documents required · 6 mandatory
₹3,800
31 Oct 2022
19 Sept 2022
1 Oct 2022
20 Sept 2022
30 Sept 2022
20 Sept 2022
20 Sept 2022 - 23 Sept 2022
Amount
Item Description/ Heading
Material Cost
Material cost for Making earth pit, supply of all required materials like 50mm x 300 mm long GI pipe of heavy gauge GI clamp, GI washer and back filling of the pit by homogeneous mixture of agriculture soil & bentonite soil etc.
Material cost for Supply and fixing of 7/10 SWG GI wire for earth continuity pole to earth pit.
Material cost for Supply and painting of two coat of aluminium paint on set poles steels tubular pole.
Material cost for Supply & painting of aluminium paint on shielded tower and strucutre tower etc. at substation yard both long tower and short tower.
Material cost for Supplying & erection/installation of HT stay set complete with stay plate, stay insulator..
Labour Cost:-
Labour cost for Making earth pit, supply of all required materials like 50mm x 300 mm long GI pipe of heavy gauge GI clamp, GI washer and back filling of the pit by homogeneous mixture of agriculture soil & bentonite soil etc.
Labour cost for Supply and fixing of 7/10 SWG GI wire for earth continuity pole to earth pit.
Labour cost for Supply and painting of two coat of aluminium paint on set poles steels tubular pole.
Labour cost for Supply & painting of aluminium paint on shielded tower and strucutre tower etc. at substation yard both long tower and short tower.
Labour cost for Supplying & erection/installation of HT stay set complete with stay plate, stay insulator..
P. F. amount for labour cost
Total impact of GST for the purpose of CTC
EVERGREEN ENTERPRISE
ELECTRO POWER INDUSTRIES
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_264217.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .