Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical ok |
| 2 | Accepted-Technical | Accepted-Technical ok |
| 3 | Accepted-Technical | Accepted-Technical ok |
| 4 | Accepted-Technical | Accepted-Technical ok |
Tender Value
Refer Docs
EMD Value
₹1 L
Closing Date
6 Apr 2026, 12:00 pmClosed
OFFICE OF RFC DEVIPATAN GONDA
OFFICE OF RFC DEVIPATAN GONDA
SINGLE STAGE DOOR STEP DELIVERY WORK FOR BLOCK BELSAR IN GONDA
2026_DOFCS_1125209_22
3340/13.03.2026
Open Tender
Miscellaneous
OFFICE OF RFC DEVIPATAN GONDA
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
RAO FOOD DEVIPATAN (GONDA)
₹1 L
14 May 2026
14 Mar 2026
6 Apr 2026
14 Mar 2026
6 Apr 2026
14 Mar 2026
Select, At Par, Excess (+), Less (-) IOCL
Tender Inviting Authority: REGIONAL FOOD CONTROLLER, DEVIPATAN REGION, GONDA
Name of Work: Single Stage Door Step Delivery Handling Transport Work in Devipatan Region, Gonda
Contract No: 3340 DATE: 13-03-2026
Name of the Bidder/ Bidding Firm / Company : Block's Name:
Sl. No. Work Description Item Code / Make Quantity Select Percentage Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category
1 Single Stage Door Step Delivery Handling Transport Work in Devipatan Region, Gonda For 2026-27 And 2027-28 BI01010001010000000000000515BI0100001112
1.01 Brick work in C.M 1:5 mix including all labour charges etc complete BI01010001010000000000000515BI0100001113 0.000 Nos 0.000 Excess(+) Full Conversion INR
1.02 Brick work in C.M 1:5 mix using 2nd class ground moulded chamber burnt bricks with including cost and conveyance of all materials and including all labour charges etc complete BI01010001010000000000000515BI0100001114 0.000 Nos 0.000 Excess(+) Full Conversion INR
1.03 Plastering in C.M 1:5-12 mm thick with including cost and conveyance of all materials and including all labour charges etc complete BI01010001010000000000000515BI0100001115 0.000 Nos 0.000 Excess(+) Full Conversion INR
1.04 Plastering in C.M 1:5-12 mm thick with including cost and conveyance of all materials and in BI01010001010000000000000515BI0100001116 0.000 Nos 0.000 Excess(+) Full Conversion INR
1.05 b) CI bend 22.5° (250mm dia) BI01010001010000000000000515BI0100001117 0.999 Nos 0.000 Excess(+) Full Conversion INR
2 Construction of chamber for 100mm sluice plates BI01010001010000000000000515BI0100001118 0.000 Nos 0.000 Excess(+) Full Conversion INR
3 Construction of chamber for 100mm sluices valve BI01010001010000000000000515BI0100001119 0.000 Nos 0.000 Excess(+) Full Conversion INR
4 Supplying, Conveying and fixing spls. Including ea BI01010001010000000000000515BI0100001120 0.000 Nos 0.800 Excess(+) Full Conversion INR
5 Supplying, Conveying and fixing spls. Including eart BI01010001010000000000000515BI0100001121 0.000 Nos 0.000 Excess(+) Full Conversion INR
6 Construction of chamber for 100mm sluice plates BI01010001010000000000000515BI0100001122 0.000 Nos 0.000 Excess(+) Full Conversion INR
7 Construction of chamber for 100mm sluices valve BI01010001010000000000000515BI0100001123 0.000 Nos 0.000 Excess(+) Full Conversion INR
8 Laying and Jointing PVC Pipe. Heading BI01010001010000000000000515BI0100001124
8.01 Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using BI01010001010000000000000515BI0100001125 0.000 Nos 0.000 Excess(+) Full Conversion INR
8.02 Brick work in C.M 1:5 mix using 2nd class ground moulded chamber burnt bricks with including cost BI01010001010000000000000515BI0100001126 0.000 Nos 0.000 Excess(+) Full Conversion INR
8.03 Construction of chamber for 100mm sluices valve BI01010001010000000000000515BI0100001127 0.000 Nos 0.000 Excess(+) Full Conversion INR
9 The Total value of Schedule1 BI01010001010000000000000515BI0100001128 0.000 Nos 0.000 Excess(+) Full Conversion INR
10 The Total value of Schedule4 BI01010001010000000000000515BI0100001129 0.000 Nos 0.000 Excess(+) Full Conversion INR
Total in Figures
Quoted Rate in Figures Select
Please Enable Macros to View BoQ information
stage.html
html • 0.02 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 12.88 MB
nitnotice.pdf
Additional Documents • 12.87 MB
BOQ_2097472.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid