Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹40.8 LAdmitted-Finance | +1.00% | ₹40.8 L | L1 | Admitted-Finance |
| 2 | L2₹42.4 LAdmitted-Finance | +5.00% | ₹42.4 L | L2 | Admitted-Finance |
Tender Value
₹40.4 L
EMD Value
₹80,708
Closing Date
11 May 2026, 12:00 pmClosed
V P SARPANCH
V P AGARWADA PERNEM GOA
Repair and renovation of existing Panchayat hall of Village Panchayat Agarwada Chopdem situated at Agarwada Pernem Goa under Atmanirbhar Bharat Swayampurna Goa
2026_VP_28991_1
VP/AC/Per/Tender Notice/2026-27/11
Open Tender
Civil Works
Percentage
150 days
V P AGARWADA PERNEM GOA
AS PER TENDER NOTICE
2 documents required · 2 mandatory
₹6,000
₹80,708
15 May 2026
29 Apr 2026
14 May 2026
29 Apr 2026
11 May 2026
29 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing R.C.C. work including stacking of steel bars & disposal of unserviceable within 50 mts. lead. | 16.2 | m3 | 1,618 | ₹26,211.6 |
| 2 | Demolishing laterite stone masonry in cement mortar including stacking of serviceable material & disposal of unserviceable material within 50 mts. lead | 34.5 | m3 | 1,136 | ₹39,192 |
| 3 | Dismantling asbestos sheet roofing including ridges, hips valley and gutters and stacking the material within 50 meters lead. | 174.8 | m3 | 38 | ₹6,642.4 |
| 4 | Earthwork in excavation by mechanical means (hydraulic excavator)/manual means in foundation pipeline trenches drain (not exceeding 1.5 m in width or 10 sq.m. on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m. a) All kinds of soil. | 179.26 | m3 | 291 | ₹52,164.66 |
| 5 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 25.2 | m3 | 2,211 | ₹55,717.2 |
| 6 | Providing & laying cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded granitic or basaltic stone aggrt. 40 mm. nominal size) excluding cost of centering, shuttering and finishing in: a)All works upto plinth level | 16.8 | m3 | 6,192 | ₹1,04,025.6 |
| 7 | Laterite masonry in neatly dressed stones of size as specified in cement mortar 1: 4 (1 cement : 4 coarse sand) in foundation and basement. | 4.54 | m3 | 5,186 | ₹23,544.44 |
| 8 | Refilling the pipeline/foundation trenches plinth sides, foundation etc. with available excavated earth in layers not exceeding 20 cm depth consolidating each layer ramming and watering lead upto 50 M and all lifts and disposal of surplus earth as directed by Engineer in Charge | 93.15 | m3 | 245 | ₹22,821.75 |
| 9 | Laterite masonry in neatly dressed stones of size as specified in cement mortar 1: 4 (1 cement : 4 coarse sand) in foundation and basement.
Extra for laterite masonry in all sizes in superstructure from floor I level upto floor V level. | 8.61 | m3 | 6,115 | ₹52,650.15 |
| 10 | Providing and laying in position (1:11/2:3) Reinforced cement conrete excluding the cost of centering, shuttering, finishing and reinfrocement (1 cement: 1½ coarse sand:3 graded stone agg 20mm nominal size) a) All works upto plinth level | 47.54 | m3 | 7,178 | ₹3,41,242.12 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.79 MB
BOQ_29425.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].