| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹8.7 L
EMD Value
₹9,000
Closing Date
4 Nov 2022, 3:00 pmClosed
BDO VP
UNION OFFICE TIRUPPUR COURT STREET TIRUPPUR
Construction of Waiting Shed, Compound wall ,CC Pathway and Water Supply Facilities at Samathuvapuram Burial Ground H/O sokkanur
2022_RDTN_258695_22
2971/2022/a1 dtd26.10.2022
Open Tender
Civil Works - Roads
Item Rate
120 days
Sokkanur pt
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹9,000
Yes
UNION OFFICE TIRUPPUR
30 Nov 2022
29 Oct 2022
4 Nov 2022
29 Oct 2022
4 Nov 2022
29 Oct 2022
31 Oct 2022
Amount
Construction of waiting shed,Compound wall, CC pathway and water supply at samathuva Burial ground H/o Sokkanur
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement concrete in 1:4:8 mix using 40 mm metal used for foundation including cost & conveyance of all materials to site and all labour charges for curing, compacting etc., complete.
Cement concrete in 1:2:4 mix using 20 mm metal used for foundation including cost & conveyance of all materials to site and all labour charges for curing, compacting etc., complete.
Fillingwith carted gravel including cost and conveyance and all labour charges etc complete as per standard specification.
Brick work in following Cement Mortar using best quality Fly ash bricks of size 23x11x7cm for foundation and basement including curing etc.,complete complying with standard specification.
Supplying and erecting centering shuttering including necessary supports for plane surface including conveyance of all materials to site and proper centering etc complete. (Below G.L)
Supplying and erecting centering shuttering including necessary supports for plane surface including conveyance of all materials to site and proper centering etc complete. (Above G.L)
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete
Weathering course concrete using 20mm broken brick jelly in pure slacked lime
Finishing the top of roof with one course of Machine pressed tiles of size 23x23x2cm in 1:3 12mm thick using WCC
Plastering with cement mortar 1:3 mix to 10 mm thick including cost and conveyance of all materials to site and all labour charges etc complete
Plastering with cement 1:5-12mm thick including cost and conveyance of al materials to site and all labour charges etc complete.
Paving the Floor with Plain ceramic tiles size 305x305x6mm in CM 1:3 20mm thick
Interior / Exterior Emulsion Two coats over priming coat including cost and conveyance of all materials and labour charges etc complete.
CC Pathway
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement concrete in 1:4:8 mix using 40 mm metal used for foundation including cost & conveyance of all materials to site and all labour charges for curing, compacting etc., complete.
Supply and erecting of steel shuttering for RCC works using MS sheets and angles and strutting up to 3.00 in height including cost and conveyance of all materials to site and all labour charges etc. complete.
Cement concrete 1 : 3 : 6 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Plain Cement concrete 1:2:4 mix using 20mm ISS metal including all cost and conveyance of all materials to site and all labour charges etc complete.
Compound Wall
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement concrete in 1:4:8 mix using 40 mm metal used for foundation including cost & conveyance of all materials to site and all labour charges for curing, compacting etc., complete.
Supplying and erecting centering shuttering including necessary supports for plane surface including conveyance of all materials to site and proper centering etc complete. (Below G.L)
Supplying and erecting centering shuttering including necessary supports for plane surface including conveyance of all materials to site and proper centering etc complete. (Above G.L)
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete
Brick work in following Cement Mortar using best quality Fly ash bricks of size 23x11x7cm for foundation and basement including curing etc.,complete complying with standard specification. In Cement Mortar 1:5
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Exterior Emulsion painting two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete.
Provision for Name Board charges
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Sakadevan
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .