Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹69.4 LAdmitted-Finance | ₹69.4 L | L1 | Admitted-Finance |
| 2 | L2₹73.2 L+₹3.8 L (5.52%)Admitted-Finance | ₹73.2 L+₹3.8 L (5.52%) | L2 | Admitted-Finance |
| 3 | L3₹81.6 L+₹12.3 L (17.7%)Admitted-Finance | ₹81.6 L+₹12.3 L (17.7%) | L3 | Admitted-Finance |
| 4 | L4₹1.1 Cr+₹37.1 L (53.5%)Admitted-Finance | ₹1.1 Cr+₹37.1 L (53.5%) | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | CHENDUR INFRASTRUCTURE P LTD L4 | NPK Associates L2 | AMMAN BUILDERS L1 | CHITHRAVARSINI AND CO L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling the damaged weathering course with pressed clay tile | 30 | m3 | 800 ₹24,000 | 54 ₹1,620 | 46 ₹1,380 Lowest | 54.12 ₹1,623.6 |
| 2.00 | Earth work excavation for foundations in hard stiff clay, stiff black cotton, hard red earth mixed with small size boulders SS.20B and sand, silt or other loose soil, wet sand, or silt not under water, light back cotton soil,sandy loam ordinary soil and tofull depth as may be directed expert in hardrock reruiring blasting inclusive of shorting shuttering, and baling out water wherever necessary refilling the sides of foundation with excavated soil other than sand in layer of 15cm thick well rammed and completed depositing the surplus excavated soil with in the compound in places shown by the departmental officers with initial lead and lifts and claening and levelling the site etc., complete. | 30 | m3 | 220 ₹6,600 | 220 ₹6,600 | 187 ₹5,610 Lowest | 220 ₹6,600 |
| 3.00 | Plain cement concrete 1:4:8 mix (one part of cement, four parts of sand and eight parts of 40mm hard blue granite metal by volume) for levelling course in foundation trenches, manholes, inspection chambers etc., includig charges for scaffolding, shoring, strutting, bailing out water if necessary, ramming, consolidating, curing etc., cost and conveyance of all materials complete in all respects complying with the relevant standard specifications, including at all leads & depths inside the building. | 32 | m3 | 6,000 ₹1,92,000 | 5,600 ₹1,79,200 | 5,068 ₹1,62,176 Lowest | 5,962.42 ₹1,90,797.44 |
| 4.00 | Supplying and Erecting and centering shuttering for sides and sofits of plain surface such as Rcc slab rectangular , T beam lintel , bed blocks, staircase waist slab , etc. including strutting shuttering , and remaining same etc. complete as per drawing | 15 | m2 | 800 ₹12,000 Lowest | 1,181 ₹17,715 | 1,003 ₹15,045 | 1,181 ₹17,715 |
| 5.00 | Reinforced cement concrete M20 1:1.5:3 granite metal by volume, characteristic strength not less than 20N/sqmm) machine mixed for all reinforced cement concrete works, including scaffolding, cost of all materials, machine mixing, vibrating, lifting, curing, labour charges for laying & finishing etc., but excluding the cost and fabrication of reinforcements and also excluding centering and formwork etc., complete complying with relevant standard specifications at all leads inside the building. | 8 | m3 | 8,500 ₹68,000 | 9,841 ₹78,728 | 8,366 ₹66,928 Lowest | 9,841.99 ₹78,735.92 |
| 6.00 | Supplying, cutting, bending and placing of reinforcement stel of MS, HYSD bars for all type of RCC works at all levels including cost of 18 gauge GI binding wire cost, labour etc., as per design and details complete. | 8 | qtl | 9,500 ₹76,000 | 9,542 ₹76,336 | 8,111 ₹64,888 Lowest | 9,542.15 ₹76,337.2 |
| 7.00 | Random rubble masonry in cement motor 1:5 (one Part of cement ,Five part of Crushed Stone Sand (M-Sand)) mix using all granite stone sand bond stones for foundation and basement from approved quarry including watering, curing, and labour charges etc., completed as per standard specification | 3 | m3 | 6,000 ₹18,000 | 6,383 ₹19,149 | 5,426 ₹16,278 Lowest | 6,383.8 ₹19,151.4 |
| 8.00 | Brick work in cement mortor 1:5 mix (one cement,five sand) using II class country bricks to a size of 9"x4 3/8"x2 3/4" including cost and conveyance of all materials and labour charges for mixing the mortor, constructing, curing to required period and wherever the masonry projection is necessary for elevation shall be done with out extra cost etc complete as per std spn.upto basement . | 10 | m3 | 7,000 ₹70,000 | 7,077 ₹70,770 | 6,016 ₹60,160 Lowest | 7,077.32 ₹70,773.2 |
| 9.00 | Supply and fixing of Steel grill for window, door with square rod , iron flat including cutting, bending,welding and including labour charges for fixing in position etc complete | 2,000 | Kgs | 125 ₹2,50,000 | 113 ₹2,26,000 | 96 ₹1,92,000 Lowest | 113.21 ₹2,26,420 |
| 10.00 | Plastering in cement mortor 1:3 mix (one cement,threee sand) 10mm thick including cost and conveyance of all materials and labour charges for mixing the martor, and the surface rubbed for smooth and curing to required period, etc complete as per std Specification TNSS No.61,V,VI,(S4)3. | 175 | m2 | 950 ₹1,66,250 | 355 ₹62,125 | 301 ₹52,675 Lowest | 355.11 ₹62,144.25 |
Tender Value
₹1 Cr
EMD Value
₹1 L
Closing Date
22 Jun 2026, 3:00 pmClosed
The commissioner, coimbatore
Coimbatore Corporation, Main Office, Big bazaar street, Town hall, Coimbatore-1
Improvement Works to the R.K.Bai Hospital Building at Subramaniayam street in ward no.72, west zone.
2026_MAWS_679597_5
e37/2026-two cover
Open Tender
Civil Works
Works
180 days
Coimbatore corporation
AS PER THE TENDER DOCUMENT
4 documents required · 4 mandatory
₹0
₹1 L
The Chief Engineer Office, Coimbatore Corporation
3 Jul 2026
9 Jun 2026
23 Jun 2026
9 Jun 2026
22 Jun 2026
9 Jun 2026
12 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling the damaged weathering course with pressed clay tile | 30 | m3 | - | - |
| 2 | Earth work excavation for foundations in hard stiff clay, stiff black cotton, hard red earth mixed with small size boulders SS.20B and sand, silt or other loose soil, wet sand, or silt not under water, light back cotton soil,sandy loam ordinary soil and tofull depth as may be directed expert in hardrock reruiring blasting inclusive of shorting shuttering, and baling out water wherever necessary refilling the sides of foundation with excavated soil other than sand in layer of 15cm thick well rammed and completed depositing the surplus excavated soil with in the compound in places shown by the departmental officers with initial lead and lifts and claening and levelling the site etc., complete. | 30 | m3 | - | - |
| 3 | Plain cement concrete 1:4:8 mix (one part of cement, four parts of sand and eight parts of 40mm hard blue granite metal by volume) for levelling course in foundation trenches, manholes, inspection chambers etc., includig charges for scaffolding, shoring, strutting, bailing out water if necessary, ramming, consolidating, curing etc., cost and conveyance of all materials complete in all respects complying with the relevant standard specifications, including at all leads & depths inside the building. | 32 | m3 | - | - |
| 4 | Supplying and Erecting and centering shuttering for sides and sofits of plain surface such as Rcc slab rectangular , T beam lintel , bed blocks, staircase waist slab , etc. including strutting shuttering , and remaining same etc. complete as per drawing | 15 | m2 | - | - |
| 5 | Reinforced cement concrete M20 1:1.5:3 granite metal by volume, characteristic strength not less than 20N/sqmm) machine mixed for all reinforced cement concrete works, including scaffolding, cost of all materials, machine mixing, vibrating, lifting, curing, labour charges for laying & finishing etc., but excluding the cost and fabrication of reinforcements and also excluding centering and formwork etc., complete complying with relevant standard specifications at all leads inside the building. | 8 | m3 | - | - |
| 6 | Supplying, cutting, bending and placing of reinforcement stel of MS, HYSD bars for all type of RCC works at all levels including cost of 18 gauge GI binding wire cost, labour etc., as per design and details complete. | 8 | qtl | - | - |
| 7 | Random rubble masonry in cement motor 1:5 (one Part of cement ,Five part of Crushed Stone Sand (M-Sand)) mix using all granite stone sand bond stones for foundation and basement from approved quarry including watering, curing, and labour charges etc., completed as per standard specification | 3 | m3 | - | - |
| 8 | Brick work in cement mortor 1:5 mix (one cement,five sand) using II class country bricks to a size of 9"x4 3/8"x2 3/4" including cost and conveyance of all materials and labour charges for mixing the mortor, constructing, curing to required period and wherever the masonry projection is necessary for elevation shall be done with out extra cost etc complete as per std spn.upto basement . | 10 | m3 | - | - |
| 9 | Supply and fixing of Steel grill for window, door with square rod , iron flat including cutting, bending,welding and including labour charges for fixing in position etc complete | 2,000 | Kgs | - | - |
| 10 | Plastering in cement mortor 1:3 mix (one cement,threee sand) 10mm thick including cost and conveyance of all materials and labour charges for mixing the martor, and the surface rubbed for smooth and curing to required period, etc complete as per std Specification TNSS No.61,V,VI,(S4)3. | 175 | m2 | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.47 MB
ITB.pdf
Additional Documents • 0.19 MB
Above50.pdf
Tender Documents • 1.35 MB
BOQ_817110.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .