Loading…
Loading…
Tender Value
₹6.4 L
EMD Value
₹6,500
Closing Date
9 Jun 2026, 12:00 pmClosed
SE ETC-I Kanpur
SE ETC-I Kanpur
Revetment of tower foundation of tower No 631 A of 132 KV S/C Rania - Jainpur Line under ETD - I Kanpur
2026_UPTCL_1139937_1
ET-05/ETC-I(K)/2026-27
Open Tender
Electrical Works
Fixed-rate
90 days
SE ETC-I Kanpur
Please refer Tender documents.
3 documents required · 3 mandatory
₹590
PNB A/C-0727002100004177
₹6,500
Yes
21 Apr 2026
21 Apr 2026
10 Jun 2026
21 Apr 2026
9 Jun 2026
21 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Revetment of tower foundation of tower No- 631 A of 132 KV S/C Rania - Jainpur Line under ETSD - II Kanpur as per drawing and specification. The Job Includes the following works:- | - | - | - | - |
| 1.1 | Excavation of rockey earth(hard rock) with the help of suitable T & P (hydraulic breaker)and labour, watering and ramming of excavated earth. | 60.84 | m3 | 133.71 | ₹8,134.92 |
| 1.2 | Concrete with 40 mm stone ballast, coarse sand and cement mortar in ratio 8:4:1 ratio in foundation and under floor including the cost of all material/ Labour and T & P etc. required for proper completion of work satisfactority. | 13.9 | m3 | 4,050.49 | ₹56,301.81 |
| 1.3 | Ist class brick work for the construction of retaining wall in 1:4 ratio cement, and sand including the cost of all material, labour & T&P etc. required for proper completion of job satisfactorily. | 85.54 | m3 | 4,632.49 | ₹3,96,263.19 |
| 1.4 | Concrete in plinth with 20mm stone ballast coarse sand and cement mortar in ratio 4:2:1 including the cost of all material. Labour and T&P etc. required for proper completion of work satisfactorily. | 2.64 | m3 | 5,426.85 | ₹14,326.88 |
| 1.5 | Earth filling under floor and in area between tower foundation and retaining wall including the cost of soil to be obtained by the contractor from outside including watering, ramming and dressing of earth etc. complete including the cost of earth rayalty, taxes, freight etc and cost of material labour and T&P required for proper completion of work satisfactorily. | 80.32 | m3 | 287.07 | ₹23,057.46 |
| 1.6 | Ist class brick on edge floor laid including preparation of base to proper slope including supply of all material, labour & T&P etc. required for proper completion of job satisfactorily. | 107.14 | m3 | 287.07 | ₹30,756.68 |
| 1.7 | 12 mm plaster work on wall with cement and sand in ratio 1:4 including cost of all material, labour and T&P required for proper completion of work satisfactorily. | 104.35 | m2 | 149.44 | ₹15,594.06 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
Tendernotice_2.pdf
PDF • 1.14 MB
BOQ_2128516.xls
BOQ • 0.24 MB
05.pdf
PDF • 0.21 MB
55d.pdf
PDF • 0.21 MB
Corg05.pdf
PDF • 0.21 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .