| 1 | L1₹48.8 LAccepted-AOC NO 68 D BLOCK 2ND FLOOR S 1 FRONTIER HOMES ALIPH MAJITH NAGAR KELAMBAKKAM CHENGALPATTU DIST CHENNAI 603 103 | CHENGALPATTU | TAMIL NADU | 603103 | L1 | Accepted-AOC The L1 Bidder issued of AOC | |
| 2 | L2₹54.1 L+₹2.2 L (4.27%)Rejected-AOC FLAT NO G 406 HANSA COURTYARD THIRUVOTTIYUR CHENNAI 600 019 | CHENNAI | TAMIL NADU | 600019 | L2 | Rejected-AOC L2 Bidder Rejected |
Tender Value
Refer Docs
EMD Value
₹43,000
Closing Date
30 Aug 2024, 2:00 pmClosed
CE/NCTPS-I
North Chennai Thermal Power Station I, Chennai 600 120
ICHS Dn Renewal of severely Corroded weaken ladder bracings and Strengthening of Trestle Tr No 7 Column of Conveyor 12 A B
2024_EB_473970_1
CE/NCTPSI/SE/MII/SpN45/2024-25
Open Tender
Power/Energy Projects/Products
Works
60 days
work
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹43,000
Yes
2 Apr 2025
17 Aug 2024
31 Aug 2024
17 Aug 2024
30 Aug 2024
17 Aug 2024
Amount
Material Portion :I I. Supply of Materials:- MS Plate 12mm Tk
MS Angle 90X90X10
MS Angle 75X75X8
MS Angle 50X50X6
Labour Portion :II Dismantling of existing severely corroded/weaken ladder bracing angles (Tie,Cross & Support),Gusset Plates and Cleats of Trestle (Tr-7) column of Conveyor-12A/B: work involves cutting, leading and removal of severley corroded/weaken portion of stucturals, including crane, winch hire charges, T&P charges consumables etc..,
Utilizing iron & steel structural materials and supporting structurals for arresting, by leading, lifting, loading, transporting from stores and unloading in the work spot including all hire charges.
Fabrication of Ladder bracing, Gusset Plates & Cleats and M.S Plates for Strengthening of Trestle (Tr-7) column of Conveyor-12A/B by marking, cutting & fabrication of column and supporting structures by utilizing iron & steel structural including crane, winch hire charges, consumables and T&P hire charges.
Erection of fabricated Ladder bracing, Gusset Plates and Cleats and M.S plates for trestle strengthening and supporting structure for (Tr-7) column of Conveyor-12A/B of coal handling plant including crane, winch hire charges, consumables and T&P hire charges.
Cleaning the surface with shot blasting the structures of corroded/weaken trestle column beams, ladder bracings, gusset plates and cleats including cost of shots, hire charges of compressor, Scaffolding including consumables and T&P hire charges.
Labour charges for painting three coats of epoxy paints (one coat of primer and two coat of epoxy paint) including epoxy thinner, consumables and T&P hire charges.
Cost of paint for one coat of zinc phosphate epoxy primer (60 - 70 microns DFT), in the structures of corroded/weaken trestle column beams, ladder bracings, gusset plates and cleats, including cost of epoxy paints.
Cost of paint with one coat of MIO epoxy under coat (100 - 120 microns DFT), in the structures of corroded/weaken trestle column beams, ladder bracings, gusset plates and cleats, including cost of epoxy paints.
Cost of paint with one coat of Aromatic polyurethane (30 - 35 microns DFT) with a total DFT of 190 to 225 microns in the structures of corroded/weaken trestle column beams, ladder bracings, gusset plates and cleats, including cost of epoxy paints.
Providing scaffolding for renewal of severely corroded/weaken Ladder bracings, gusset plates and cleats and Strengthening of Trestle (Tr-7) column of Conveyor-12A/B including cost of consumable & T&P's.
Gold Engineering Works (BID ID -1124699)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .