Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.6 CrAccepted-AOC | ₹5.6 Cr Quoted ₹6.1 Cr | L1 | Accepted-AOC Lowest Rate Quoted |
| 2 | L2₹6.2 Cr+₹11.1 L (1.83%)Rejected-Finance | ₹6.2 Cr+₹11.1 L (1.83%) | L2 | Rejected-Finance Highest rate quoted |
| 3 | L3₹6.3 Cr+₹16.0 L (2.62%)Rejected-Finance | ₹6.3 Cr+₹16.0 L (2.62%) | L3 | Rejected-Finance Highest rate quoted |
Tender Value
₹5.7 Cr
EMD Value
₹3.0 L
Closing Date
8 Jul 2020, 3:00 pmClosed
Superintending Engineer , Coimbatore
Superintending Engineer Office Highways Department Construction and Maintenance Coimbatore 641018
Widening and strengthening Improvements to riding quality CD Works Retaining wall and Up Keeping for a period of 60 months to Government Highways roads in ANAIMALAI H CM Sub Division Jurisdiction Package No 41
2020_HWAY_166148_1
p14
Open Tender
Civil Works - Highways
Percentage
270 days
Pollachi
Refer pre qualification document volume I
12 documents required · 12 mandatory
₹0
₹3.0 L
24 Dec 2020
5 Jun 2020
10 Jul 2020
8 Jun 2020
8 Jul 2020
15 Jun 2020
10 Jun 2020 - 12 Jun 2020
eProcurement System Government of Tamil Nadu Created By: kala Govindharajan Created Date/Time: 14-Jul-2020 06:14 PM Tender Title: CRIDP - 2020-2021 Tender ID: 2020_HWAY_166148_1
Tender Inviting Authority: Superintending Engineer Highways Construction and Maintenance Coimbatore Circle
Widening and strengthening, Improvements to riding quality, CD Works, Retaining wall and Up Keeping for a period of 60 months to Government Highways roads in ANAIMALAI (H) C&M Sub Division Jurisdiction – Package No. 41 A) Widening from Intermediate lane to Two lane and Strengthening of Anaimalai - Poolankinar Road. at km 0/0 - 1/0 and 2/6 - 3/4 including Widening of RCC Slab Culvert at Km 2/6 (PAP) and Construction of Retaining wall at Km 2/8 (MD 22) including upkeeping for a period of 60 months B) Widening from Intermediate lane to Two lane and Strengthening of Anaimalai - Poolankinar Road. at km 6/6 - 8/500 including Widening of Pipe Culvert at Km 7/4 (PAP), 8/4, 8/5 (MD 22) including upkeeping for a period of 60 months C)Widening from Intermediate lane to Two lane and Strengthening of Anaimalai - Poolankinar Road. at km 8/700 - 10/0 including Widening of Pipe Culvert at Km 8/8 (MD 22) including upkeeping for a period of 60 months D) Widening from Intermediate lane to Two lane and Strengthening of Anaimalai - Poolankinar Road. at km 10/0 - 11/0 including Widening of Pipe Culvert at Km 10/4 (PAP) (MD 22) including upkeeping for a period of 60 months E) Improvements to Riding Quality at km 0/0 - 4/780 of Reddiyarmadam - Andiyur road. including upkeeping for a period of 60 months F) Improvements to Riding Quality at km 0/0 - 2/380 of Manchanaickanur Ring Road. including upkeeping for a period of 60 months
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words
1.00 SriMuthulakshmi and co 50915680.490 6.800 60903301.000 Six Crore Nine Lakh Three Thousand Three Hundred and One
2.00 KCP Engineers Private Limited 50915680.490 8.750 62015299.000 Six Crore Twenty Lakh Fifteen Thousand Two Hundred and Ninty Nine
3.00 VRAMASAMY 50915680.490 9.600 62500016.000 Six Crore Twenty Five Lakh Sixteen
Lowest Amount Quoted BY: SriMuthulakshmi and co(60903301.000)
BOQ Summary Details Tender Title: CRIDP - 2020-2021 Tender ID: 2020_HWAY_166148_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 SriMuthulakshmi and co 60903301.000 L1
2 KCP Engineers Private Limited 62015299.000 L2
3 VRAMASAMY 62500016.000 L3
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .