| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹49.5 LAccepted-Finance | ₹49.5 L | L1 | Accepted-Finance ACCEPTED BEING LOWEST RATE FOUND |
| 2 | L2₹51.0 LRejected-Finance LUCKNOW | UTTAR PRADESH | 226001 | ₹51.0 L | L2 | Rejected-Finance REJECTED BEING HIGHER RATE FOUND |
| 3 | L3₹59.9 LRejected-Finance | ₹59.9 L | L3 | Rejected-Finance REJECTED BEING HIGHER RATE FOUND |
Tender Value
₹60 L
EMD Value
₹5 L
Closing Date
2 Apr 2026, 12:00 pmClosed
OFFICE OF SE SUL-AMETHI CIRCLE PWD SULTANPUR
OFFICE OF SE SUL-AMETHI CIRCLE PWD SULTANPUR
BOQ
2026_CEUFZ_1131954_1
1226/1com-Sul.A.Cir./2025-26 Date 23.03.2026
Open Tender
Civil Works - Roads
180 days
SULTANPUR
NIT
2 documents required · 2 mandatory
₹2,714
₹5 L
OFFICE OF SE SUL-AMETHI CIRCLE PWD SULTANPUR
20 Apr 2026
31 Mar 2026
2 Apr 2026
31 Mar 2026
2 Apr 2026
31 Mar 2026
1 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Dismentalling brick work or stone work in lime or cement mortar and including stacking of material as directed by E/I within a distance of 60 meter (200Feet) as per S.I. No. 692 | |||||
| 2For Dewatering during Construction by 10 HP Dewatering pump. | |||||
| 3Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. As per MoRT&H Specification. S.I. No.-12.1 & Clause 304 | |||||
| 4Plain/reinforced cement concrete in open foundation complete as per drawing and technical specification. As per MoRT&H S.I. No.-12.8 & Clause 1500,1700 & 2100 (M-15) A-40 | |||||
| 5Plain/reinforced cement concrete in foundation concrete as per drawing and technical specification. As per MoRT&H S.I. No.-13.5 (F) & Clause 1500,1700 & 2200 (M-25) | |||||
| 6Plain/reinforced cement concrete in open foundation complete as per drawing and technical specification. As per MoRT&H S.I. No.-12.8 & Clause 1500,1700 & 2100 (M-30) | |||||
| 7Plain/reinforced cement concrete in sub structure concrete as per drawing and technical specification. As per MoRT&H S.I. No.-13.5 (F) & Clause 1500,1700 & 2200 (M-30) | |||||
| 8Providing concrete for plain/reinforced concrete complete in super structure as per drawing and technical specification. As per MoRT&H S.I. No.-14.1 (B) & Clause 1500,1600 & 1700 (M-30) | |||||
| 9Supplying, fitting & placing HYSD bar reinforcement in foundation complete as per drawing & technical specifications. As per MoRT&H S.I. No.-12.4 & Clause 1600 | |||||
| 10Supplying, fitting & placing HYSD bar reinforcement in sub structure complete as per drawing & technical specifications. As per MoRT&H S.I. No.-13.6 & Clause 1600 & 2200 | |||||
stage.html
html • 0.04 MB
techsummary_2112520.pdf
BOQ Comparative Chart
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.36 MB
BOQ_2112520.xls
BOQ • 0.49 MB
bid.pdf
Additional Documents • 1.18 MB
Download all tender documents and submit your bid