Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹64.4 LAdmitted-Finance | -13.87% | ₹64.4 L | L1 | Admitted-Finance |
| 2 | L2₹68.2 LAdmitted-Finance | -8.87% | ₹68.2 L | L2 | Admitted-Finance |
| 3 | L3₹69.0 LAdmitted-Finance | -7.77% | ₹69.0 L | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | - | Rejected-Technical Not Qualified |
| 5 | Rejected-Technical BUNDI | RAJASTHAN | 323001 | - | - | - | Rejected-Technical Not Qualified |
Tender Value
₹74.8 L
EMD Value
₹1.5 L
Closing Date
20 Apr 2026, 9:00 amClosed
Executive Engineer
WDSC DEOGARH
Construction of Pakaa checkdam,anicut ,Nadi retaining wall, mpt in PMKSY 2.O PS BHIM AREA
2026_WDSC_550192_3
WDSC/Deogarh/2026-27/ENIT/1-3
Open Tender
Civil Works
Bhim
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
SE Cum Project Manager, WCDC Watershed
₹1.5 L
Yes
5 May 2026
6 Apr 2026
20 Apr 2026
6 Apr 2026
20 Apr 2026
6 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | जे.सी.बी. मशीन/ट्रेक्टर मय स्क्रेपर द्वारा मिटटी खुदाई कार्य, खोदी हुई मिटटी के डगलों को तोडने (Breaking of clods), घास एवं कंकर, पत्थर को अलग करना (Sorting of grass & pebbles) एवं बण्ड (Bund) का सेक्शन (काट क्षेत्रफल में)/प्रोफाइल संधारित करना मय चढाना एवं उतारना प्रारंभिक लीड 250 मी. एवं लिफ्ट 3 मी. तक। Draft based on chapter 5th of irrigation page number 32 to 34 (दिनाँक 01/02/2017 से मान्य) ईकाई 1 घन मी. (BSR 2025-26item no. 196 B | - | CUM | - | - |
| 2 | नीव, खाई,परनाला में 1.5 गहराई तक मिट्टी की खुदाई करना , तल को कूटना , पानी डालना, बगल को संवारना , खुदी मिट्टी को बाहर निकालना, नीव भरने के बाद खाली स्थानों को पुन: मिट्टी से भरना तथा बची हुई मिटटी को 50 मीटर की दूरी तक निस्तारण करना (GKN 2025 ITEM #2(ब) | - | CUM | - | - |
| 3 | lhesUV daØhV uhao ;k Q'kZ esa 40 fe- eh- ukHkh; eki dh iRFkj fxÍh@bZV fxÍh] lhesUV jsr elkyk esa 1 lhesUV % 4 jsr % 8 fxÍh vuqikr eas feykdj Mkyuk rFkk dqVkbZ djuk] rjkbZ lesrA Jfed fefJrA (RDPR BSR 2025-26 Item No. 15a) | - | CUM | 1 | - |
| 4 | एनीकट हेतु पत्थर की चिनाई सीमेंट-बजरी मसाले में। 1%6 vuqikr (RDPR BSR 2025-26 Item No. 166 A) | - | CUM | - | - |
| 5 | ,uhdV gsrq iRFkj dh fpukbZ 1%6 vuqikr lhesaV&ctjh elkys esaA lwijLV`Dpj esa (RDPR BSR 2025-26 Item No. 166 a) | - | CUM | - | - |
| 6 | सीमेन्ट प्लस्टर दीवार पर 1:4 अनुपात में सीमेन्ट - बजरी मिलाकर जोडों को कुरेदने तथा 14 दिन तक नियमित तराई सहित। 25 मि.मी. मोटाई (केवल जलरोधी संरचनाओ के उपयोग हेतु) (GKN 2025-26 Item no.-76a) | - | SQM | 1 | - |
| 7 | lhesaV daadzhV 1 lhesaV % 2 ctjh % 4 iRFkj ,xzhxsV vuqikr es 12 fe-eh- ukHkh; eki dh ,xzhxsV ds lkFk MkyukA (RDPR BSR 2025-26 Item No. 16) | - | CUM | 1 | - |
| 8 | जे.सी.बी. मशीन/ट्रेक्टर मय स्क्रेपर द्वारा मिटटी खुदाई कार्य, खोदी हुई मिटटी के डगलों को तोडने (Breaking of clods), घास एवं कंकर, पत्थर को अलग करना (Sorting of grass & pebbles) एवं बण्ड (Bund) का सेक्शन (काट क्षेत्रफल में)/प्रोफाइल संधारित करना मय चढाना एवं उतारना प्रारंभिक लीड 250 मी. एवं लिफ्ट 3 मी. तक। Draft based on chapter 5th of irrigation page number 32 to 34 (दिनाँक 01/02/2017 से मान्य) ईकाई 1 घन मी. मशीनरी कार्य सख्त मिट्टी (in Hard Soil)RDPR BSR 2025-26 Item No. 196 b | - | CUM | - | - |
| 9 | taxy dh lQkbZ] lk/kkj.k ouLifr rFkk >kfM;ksa dks dkaVus lfgr A RDPR BSR 2025 Item No191 | - | SQM | 1 | - |
| 10 | 5 ls 7-5 lseh- xgjkbZ dk Mkxcsfyax dk;Z GKN 2025 Item No. (6B) | - | RM | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.94 MB
BOQ_980917.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid