| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-AOC | ₹1.1 Cr | L1 | Accepted-AOC Awarded |
| 2 | L2₹1.3 Cr+₹12.5 L (11.1%)Rejected-AOC | ₹1.3 Cr+₹12.5 L (11.1%) | L2 | Rejected-AOC Not Awarded |
Tender Value
₹1.3 Cr
EMD Value
₹2.5 L
Closing Date
27 Jan 2025, 2:00 pmClosed
Chief Engineer,PWRD,Chandmari,Guwahati-03
O/o the Chief Engineer,PWRD,Chandmari,Guwahati-03
Improvement of 18 nos of road under SOPD-G for the year 24-25 under Goreswar LAC
2025_PWD_42183_4
CE/Commn/125/SOPD-G/24-25/02
Open Tender
Civil Works – Roads
Item Rate
90 days
Goreswar
Please refer Tender documents.
4 documents required · 4 mandatory
₹2,500
₹2.5 L
Yes
23 Apr 2025
17 Jan 2025
27 Jan 2025
17 Jan 2025
27 Jan 2025
17 Jan 2025
17 Jan 2025 - 27 Jan 2025
Amount
Heavy Dressing Heavy Dressing of the existing road including dressing high spots, filling low spots and making up loss of material/irregularities, removing of all vegetation, cambering, watering, rollong with 8 to 10 tonne roller to obtain a specified compaction etc. to obtain a uniform formation surface with cross fall from the road centre line to the outer shoulder edge with allowance, made for required quantity of shoulder materials to remain in place to contain the new gravel layer. Works to be carried out in accordance with Technical Specification and as directed by the Engineer.
Gravel/Soil-Aggregregate surface course (table 400.3 By Mix in place method Construction of granular surface course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 402.
Gravel/Soil-Aggregregate surface course (table 400.3 By Mix in place method Construction of granular surface course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 402.
Gravel/Soil-Aggregregate surface course (table 400.3 By Mix in place method Construction of granular surface course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 402.
Gravel/Soil-Aggregregate surface course (table 400.3 By Mix in place method Construction of granular surface course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 402.
Gravel/Soil-Aggregregate surface course (table 400.3 By Mix in place method Construction of granular surface course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 402.
Gravel/Soil-Aggregregate surface course (table 400.3 By Mix in place method Construction of granular surface course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 402.
Gravel/Soil-Aggregregate surface course (table 400.3 By Mix in place method Construction of granular surface course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 402.
Gravel/Soil-Aggregregate surface course (table 400.3 By Mix in place method Construction of granular surface course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 402.
Gravel/Soil-Aggregregate surface course (table 400.3 By Mix in place method Construction of granular surface course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 402.
Gravel/Soil-Aggregregate surface course (table 400.3 By Mix in place method Construction of granular surface course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 402.
Gravel/Soil-Aggregregate surface course (table 400.3 By Mix in place method Construction of granular surface course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 402.
Gravel/Soil-Aggregregate surface course (table 400.3 By Mix in place method Construction of granular surface course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 402.
Gravel/Soil-Aggregregate surface course (table 400.3 By Mix in place method Construction of granular surface course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 402.
Construction of 1000M dia Double opening HPC 1 Nos ,Construction of 1000M dia Single opening HPC 4 Nos,(Only laying)Construction of 600M dia single opening HPC 7 No(Only laying) , Earth work in excavation of foundation of structures as per drawing and technical specifications Clause 305.1, including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50m, dressing of sides and bottom and backfilling with approved material. I. Ordinary soil upto 3 m depth
PCC M10 (1:3:6) in levelling course below open Foundation of Head walls as per drawing and technical specifications Clauses 1109.
Brick msonry work in cement mortar in substructure complete excluding pointing and plastering, as per drawing and technical specification Clauses 602, 603, 604, 1202 & 1204 ii) In 1:4 cement mortar
Laying 1st class bedding on well compacted sand, moorum as per clause 115(ii) Granular bedding
Plastering with cement morter(1:4) 15 mm thick on brick work in sub structure as per technical specification.
Providing and Laying RCC NP-3 in Single Row Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of grannular material in single row including fixing collar with cement mortar 1;2 but excluding excavatiuon, protection works, backfilling, concrete and masonary works, in head walls and parapets Clause 1106. B) 1000MM Dia
Providing and Laying RCC NP-3 in Single Row Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of grannular material in single row including fixing collar with cement mortar 1;2 but excluding excavatiuon, protection works, backfilling, concrete and masonary works, in head walls and parapets Clause 1106. B) 600MM Dia
MOMAI BORO (BID ID -256267)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .