Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 LAccepted-AOC | L1 | Accepted-AOC L1 Tender Awarded | |
| 2 | L2₹3.0 L+₹50,062 (20.1%)Rejected-AOC 6 5 77 THOTTILPATTY SALEM CAMP PO METTUR DAM 636456 | METTUR DAM | SALEM | TAMIL NADU | 636456 | L2 | Rejected-AOC L2 Tender Rejected |
Tender Value
Refer Docs
EMD Value
₹2,500
Closing Date
19 Jan 2024, 2:00 pmClosed
O/o SE/Civil/MTPS-II
SE/Civil/MTPS-II
Providing concrete coping to the column pedestals of Conveyor 7 in the Coal yard and raising of floor level in the Vehicle bay area of Bull Dozer shed of MTPS-II.
2024_EB_406756_1
SE/ P and A / MTPS-II / OT.No. 71 /2023 -2024.
Open Tender
Civil Works
Works
90 days
MTPS-II/Mettur Dam
Tender specification
2 documents required · 2 mandatory
₹0
₹2,500
Yes
19 Jul 2024
6 Jan 2024
20 Jan 2024
6 Jan 2024
19 Jan 2024
6 Jan 2024
Amount
Earth work excavation and depositing on bank with initial lead of 10m & initial lift of 2 m in all types of soil as directed by the Engineer at site, including cost of tools and plants, labour charges, leads, lifts, transport, etc., complete.
Providing PCC 1:2:4 using 12 to 20 mm HBG metal for providing coping and flooring as directed by the Engineer at site, including shuttering charges, cost of all materials, labour charges, curing, lead, lift, etc. complete.
Providing floor finish with C.M 1:3, 20mm thick as directed by the Engineer at site including cost of all materials, labour charges, curing, lead, lift, etc., complete.
R.K.CONTRACTOR
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .