| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.6 LAccepted-Finance | ₹7.6 L | L1 | Accepted-Finance Rates of Bidder are below estimated rates and also 1st lowest among three. |
| 2 | L2₹7.7 LRejected-Finance | ₹7.7 L | L2 | Rejected-Finance Rates of Bidder are below estimated rates and also higher among three. |
| 3 | L3₹7.7 LRejected-Finance | ₹7.7 L | L3 | Rejected-Finance Rates of Bidder are below estimated rates and also higher among three. |
| Sl No | Description | Qty | Unit | PIYUSH CONTRACTORS L1 | M/S SAVERA BUILDCON L2 | M/S DIVINE BLESSED ENTERPRISES L3 |
|---|---|---|---|---|---|---|
| 1.00 | Earthwork in Excavation of foundation in ordinary soil including all lift & lead and including back filling, watering and ramming excavated earth into the trenches or into the space between the structure and the side of foundation trenches or into the plinth with removal and disposal of surplus earth as direction of engineer-in-charge from the foundation trenches including cost of labour, all T & P, leads and lift etc | 172.62 | Cum | 126 ₹21,750.12 | 127 ₹21,922.74 | 129 ₹22,267.98 |
| 2.00 | Ordinary centering and shuttering or steel shuttering for C.C. work | 14.93 | Sqm | 480 ₹7,166.40 | 485 ₹7,241.05 | 490 ₹7,315.70 |
| 3.00 | Laying C.C. 1:2:4 Mix (M-15) cement, coarse sand & 20 mm down graded stone grit including cost of all material, labour and T&P etc. complete but excludiing cost of shuttering. | 17.09 | Cum | 5,829 ₹99,617.61 | 5,920 ₹1.0 L | 5,950 ₹1.0 L |
| 4.00 | Laying C.C. 1:6:12 Mix cement, coarse sand & 20 mm down graded stone grit including cost of all material, labour and T&P etc. complete but excludiing cost of shuttering. | 6.34 | cum | 5,128 ₹32,511.52 | 5,205 ₹32,999.70 | 5,230 ₹33,158.20 |
| 5.00 | Brick work in 1:4 cement mortar in Abutment, Wing wall & Parapet etc.up to 3 m lift and 60 M lead including cost of all material, labour and T&P required for proper completion of work. | 51.56 | Cum | 5,031 ₹2.6 L | 5,110 ₹2.6 L | 5,130 ₹2.6 L |
| 6.00 | Cement pointing in 1:2 cement mortar (struck deep) on brick masonary including cost of all material, labour and T&P etc. required for proper completion of work. | 52.05 | Sqm | 110 ₹5,725.50 | 113 ₹5,881.65 | 113 ₹5,881.65 |
| 7.00 | Centering and shuttering (steel shuttering) for R.C.C. work up to 3.0 m height including cost of all labour, material and T&P etc. required for proper completion of work. | 63.89 | Sqm | 788 ₹50,345.32 | 802 ₹51,239.78 | 805 ₹51,431.45 |
| 8.00 | Reinforcement including cutting, bending & binding in position including cost of bindingwire and also including all cost of labour, material and T&P etc. required for proper completion of work. | 0.89 | M.T | 62,535 ₹55,668.66 | 63,151 ₹56,217.02 | 63,835 ₹56,825.92 |
| 9.00 | R.C.C. M-20(1:1.5:3) with cement, coarse sand & 20 mm down graded stone grit in deck slab and approach slab including cost of material, labour T&P etc. but excluding cost of centering shuttering and reinforcement required for proper completion of work. | 10.07 | Cum | 6,673 ₹67,197.11 | 6,777 ₹68,244.39 | 6,812 ₹68,596.84 |
| 10.00 | Laying R.C.C. 1:1:2 Mix (M-25) with Cement, coarse sand & 20 mm down graded stone grit in wearing coat including cost of all material, labour and T&P etc. complete but excludiing cost of Centering, shuttering & Reinforcement. | 1.82 | Cum | 7,467 ₹13,589.94 | 7,584 ₹13,802.88 | 7,622 ₹13,872.04 |
Tender Value
₹7.9 L
EMD Value
₹15,800
Closing Date
27 Apr 2026, 11:00 amClosed
RAJEEV KUMAR EXECUTIVE ENGINER
O/O EXECUTIE ENGINEER MADHYA GANGA CANAL CONSTRUCTION DIVISION-9 SAMBHAL
CONSTRUCTION OF V.R.B AT KM 4.574 OF MOHD.PUR TANDA MINOR.
2026_UPIDC_1139103_1
01/EE/2026-27
Open Tender
Civil Works - Canal
45 days
MOHAMMADPUR TANDA SAMBHAL
PLEASE REFER TENDER DOCUMENT
3 documents required · 3 mandatory
₹516
Yes
₹15,800
SAMBHAL
14 May 2026
20 Apr 2026
27 Apr 2026
20 Apr 2026
27 Apr 2026
20 Apr 2026
21 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in Excavation of foundation in ordinary soil including all lift & lead and including back filling, watering and ramming excavated earth into the trenches or into the space between the structure and the side of foundation trenches or into the plinth with removal and disposal of surplus earth as direction of engineer-in-charge from the foundation trenches including cost of labour, all T & P, leads and lift etc | - | Cum | - | - |
| 2 | Ordinary centering and shuttering or steel shuttering for C.C. work | - | Sqm | - | - |
| 3 | Laying C.C. 1:2:4 Mix (M-15) cement, coarse sand & 20 mm down graded stone grit including cost of all material, labour and T&P etc. complete but excludiing cost of shuttering. | - | Cum | - | - |
| 4 | Laying C.C. 1:6:12 Mix cement, coarse sand & 20 mm down graded stone grit including cost of all material, labour and T&P etc. complete but excludiing cost of shuttering. | - | cum | - | - |
| 5 | Brick work in 1:4 cement mortar in Abutment, Wing wall & Parapet etc.up to 3 m lift and 60 M lead including cost of all material, labour and T&P required for proper completion of work. | - | Cum | - | - |
| 6 | Cement pointing in 1:2 cement mortar (struck deep) on brick masonary including cost of all material, labour and T&P etc. required for proper completion of work. | - | Sqm | - | - |
| 7 | Centering and shuttering (steel shuttering) for R.C.C. work up to 3.0 m height including cost of all labour, material and T&P etc. required for proper completion of work. | - | Sqm | - | - |
| 8 | Reinforcement including cutting, bending & binding in position including cost of bindingwire and also including all cost of labour, material and T&P etc. required for proper completion of work. | - | M.T | - | - |
| 9 | R.C.C. M-20(1:1.5:3) with cement, coarse sand & 20 mm down graded stone grit in deck slab and approach slab including cost of material, labour T&P etc. but excluding cost of centering shuttering and reinforcement required for proper completion of work. | - | Cum | - | - |
| 10 | Laying R.C.C. 1:1:2 Mix (M-25) with Cement, coarse sand & 20 mm down graded stone grit in wearing coat including cost of all material, labour and T&P etc. complete but excludiing cost of Centering, shuttering & Reinforcement. | - | Cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.81 MB
Tendernotice_2.pdf
PDF • 3.60 MB
BOQ_2126846.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid