| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹7.2 CrAccepted-AOC | ₹7.2 Cr | L-1 | Accepted-AOC L-1 |
| 2 | L-2₹7.3 Cr+₹12.9 L (1.79%)Rejected-Finance | ₹7.3 Cr+₹12.9 L (1.79%) | L-2 | Rejected-Finance L-2 |
| 3 | L-3₹7.5 Cr+₹26.5 L (3.69%)Rejected-Finance | ₹7.5 Cr+₹26.5 L (3.69%) | L-3 | Rejected-Finance L-3 |
| 4 | L-4₹7.7 Cr+₹54.6 L (7.58%)Rejected-Finance 142 | ₹7.7 Cr+₹54.6 L (7.58%) | L-4 | Rejected-Finance L-4 |
| 5 | L-5₹7.8 Cr+₹60.7 L (8.43%)Rejected-Finance | ₹7.8 Cr+₹60.7 L (8.43%) | L-5 | Rejected-Finance L-5 |
Tender Value
₹9.2 Cr
EMD Value
₹18.4 L
Closing Date
19 Aug 2020, 4:00 pmClosed
Superintending Engineer
Superintending Engineer Barrage Construction Circle Kanpur
Construction of C.C. Lining in Feeder Channel Km. 1.00 to 6.400 at UPCP-II
2020_UPIDC_497536_1
03/SE/2020-21
Open Tender
Civil Works
Item Wise
120 days
Kanpur
Please Refer Tender Document
2 documents required · 2 mandatory
₹2,590
Executive Engineer Barrage Construction Division-2
₹18.4 L
7 Dec 2020
12 Aug 2020
20 Aug 2020
12 Aug 2020
19 Aug 2020
12 Aug 2020
Amount
Preparation of subgrade excluding cost of earth work
Earth work in foundation in dry ordinary soil (Loam, clay or sand) including lift upto 1.50 m. and lead upto 30 m. and including filling, watering and ramming of excavated earth into the trenches or into the space between the structure and the sides of foundation trenches or into the plinth with removal and disposal of surplus earth as directed by the Engineer - in - charge upto a distance of 30 m. from the foundation trenches.
Providing/Laying Cement concrete M-15, A-20, Coarse sand (FM 2.25) with mechanical mixing by batching plant including all cost of materials, labour & T&P etc. required for proper completion of work.
Providing/Fixing shuttering for cement concrete work including all cost of materials, labour & T&P etc. required for proper completion of work.
Providing/Laying 50 mm thick local sand for making subgrade with proper compaction and dressing including all material, labour, T&P etc. required for proper completion of work.
Providing/Laying 12.50MM thick Cement plaster with 1:4 Cement mortor with Coarse sand (Fm 2.25) i/c all cost of labour & T&P etc. for proper completion of work.
Supplying /Laying two coat Bitumen (Grade 80/100) painting on sleeper top i/c cost of material, labour, fuel, T&P etc. required for proper completion of work.
Supplying/laying LDPE Film 200 micron Ist grade including all labour and T.&P. etc./Sqm below C.C. lining for proper completion of work.
Supplying/Filling sealing compound in expansion joint i/c all material, labour, T&P etc. required for proper completion of work.
Providing/Laying 75 mm thick Cement concrete lining by paver machine with M-15 A-20 grade concrete i/c all material, labour, T&P etc. required for proper completion of work.
Class Ist M-150 Brick work in1:4 cement and coarse sand mortar in foundation and plinth including supply of all material labour and T&P etc required for proper completion of work.
MSA CONSTRUCTION PRIVATE LIMITED
lallan singh contractor (P) ltd
M/S SHIV SHAKTI CONSTRUCTION
M/s Jagat Singh Contractor and Suppliers
m/s satish chandra jaiswal
M/S ANMOL ASSOCIATES
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .