| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAccepted-AOC R O VILLAGE SHEKHAL P O DHADI GHUNSA TEHSIL ROHRU DISTT SHIMLA | ₹1.4 Cr | L1 | Accepted-AOC Accepted |
| 2 | L2₹1.4 Cr+₹956 (<0.01%)Rejected-Finance R O AGNIHOTRI NIWAS DEV NAGAR KASUMPTI SHIMLA 9 | ₹1.4 Cr+₹956 (<0.01%) | L2 | Rejected-Finance Rejected |
| 3 | L3₹1.6 Cr+₹28.6 L (21.1%)Rejected-Finance SHIMLA MUNICIPAL CORPORATION | SHIMLA | HIMACHAL PRADESH | 171001 | ₹1.6 Cr+₹28.6 L (21.1%) | L3 | Rejected-Finance Rejected |
| 4 | L4₹1.7 Cr+₹30.4 L (22.4%)Rejected-Finance SHIMLA MUNICIPAL CORPORATION | ₹1.7 Cr+₹30.4 L (22.4%) | L4 | Rejected-Finance Rejected |
| 5 | L5₹2.0 Cr+₹65.2 L (48.0%)Rejected-Finance SHIMLA MUNICIPAL CORPORATION | SHIMLA | HIMACHAL PRADESH | 171001 | ₹2.0 Cr+₹65.2 L (48.0%) | L5 | Rejected-Finance Rejected |
Tender Value
₹2.1 Cr
EMD Value
₹4.2 L
Closing Date
19 Jan 2024, 5:00 pmClosed
Executive Engineer R B M C Shimla
Executive Engineer R B M C Shimla
Development of Parking near St Xavier School Sanjauli under AMRUT
2024_MC_83683_3
18-21dated02012024
Open Tender
Civil Works
Item Rate
360 days
Shimla
please refer tender documents
8 documents required · 8 mandatory
₹5,000
Executive Engineer R B M C Shimla
₹4.2 L
27 Mar 2024
8 Jan 2024
20 Jan 2024
8 Jan 2024
19 Jan 2024
8 Jan 2024
Amount
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. Ordinary rock
Excavation in foundations, trenches etc. in all kinds of earth work including spade work, pick work, jumper work blasting work including where blasting is prohibited and chiselling/wedging out of rock etc. upto all lifts stacking the excavated soil not more than 3 metres clear from the edge of the excavation and then returning the stacked soil in 15 cm. layer when required into plinths, sides of foundation etc. consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth within all leads and lifts as directed by Engineer-in-charge.
Excavation in earth work and filling in 15cm layers in foundation and plinths including ramming, watering and consolidting up to a lead of 20 meters and lift up to 1.5 meters.
Carriage of material by mechanical transport including Loading & unloading & stacking of Muck/Debries in M.C. Dumping site at bharyal free of cost Tansporation charges will be paid extra (10km)
Centering and shuttering including strutting, propping etc. and removal of form work for : Foundation footing and basis of coulmn ,etc. and mass concrete.
Flat surfaces such as soffits of suspended floors, roofs, landings and the like - Floors etc. upto all thickness
Column ,pillers , posts and struts
Beams ,cantilever, griders and lintels.Sides and soffits of beams , beam haunching cantilevers, brssumers and lintels not exceeding.
Stair cases with slopping or stepped excluding landing:
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:4:8 (1 cement : 4 coarse sand) : 8 graded stone aggregate 40 mm nominal size)
Providing and laying cement concrete 1:1.2 (1cement :1 sand :2graded stone aggregate 20mm. Nominal size) and curing complete excluding cost of form work and reinforcement for reinforced concrete work in.Foundation and plinth.
Providing and laying reinforced cement concrete 1:1.2( 1 cement :1 sand :2 graded stone aggregate 20mm nominal size) to give smooth and even surface including centring and shuttering etc. but excluding cost of reinforceme Suspended floors roofs, landings and shelves and their supports, balconies, beams, girders, bressumers and cantilevers upto floor two level.
Providing and laying cement concrete 1:1:2 (1cement :1sand :2graded stone aggregate 20mmnominal size) and curing complete excluding cost of form work.lintels beam bottom
Providing and laying reinforced cement concrete 1:1:2( 1 cement :1 sand :2 graded stone aggregate 20mm nominal size) to give smooth and even surface including centring and shuttering etc. but excluding cost of reinforcement in:Columns, pillars posts and struts upto all floor level.
Providing and laying reinforced cement concrete 1:1:2( 1 cement :1 sand :2graded stone aggregate 20mm nominal size) to give smooth and even surface including centring and shuttering etc. but excluding cost of reinforcement in:Stair cases ( except spiral stair case) excluding landing but including preparing of the surface and finishing of nosing upto floor two level.
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Mild steel and Medium Tensile steel bars
Applying cement slurry on RCC slab or cement concrete work using 2.75 kg of cement per squaremetre of floor area before laying cement concrete flooring including roughening clening of the concrete surface complete
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in : Cement mortar 1:4 (1 cement : 4 coarse sand) II nd Class
40mm thick cement concrete flooring 1:2:4 (one cement:2sand:4graded stone 20mm size) laid in one layer finished with a floting coat of neat cement.
6 mm cement plaster to celling in cement mortar 1:3 (1 Cement :3 sand)
15 mm cement plaster in single coat on fair side of brick/Concrete /stone walls for interior plastering up to all floor level including arises internal rounded angles chamfers and or rounded angles not exceeding 80 mm in grith and finished even and smooth in cement motar 1:6 (1 cement : 6 Sand)
15 mm cement plaster in single coat on Rough side of brick/Concrete /stone walls for interior plastering up to all floor level including arises internal rounded angles chamfers and or rounded angles not exceeding 80 mm in grith and finished even and smooth in cement motar 1:6 (1 cement : 6 Sand)
Mantu Kumar
Ashu Chauhan
devinder
Gurcharan Industries
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .