Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.1 CrAdmitted-Finance 815 MUGHALCHAK ALINAGAR MUGHALSARAI CHANDAULI UTTAR PRADESH 232101 | CHANDAULI | UTTAR PRADESH | 232101 | -21.19% | ₹5.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹5.7 Cr+₹59.6 L (11.7%)Admitted-Finance | -11.99% | ₹5.7 Cr+₹59.6 L (11.7%) | L2 | Admitted-Finance |
| 3 | L3₹6.1 Cr+₹95.1 L (18.6%)Admitted-Finance | -6.50% | ₹6.1 Cr+₹95.1 L (18.6%) | L3 | Admitted-Finance |
| 4 | L4₹6.2 Cr+₹1.1 Cr (21.1%)Admitted-Finance | -4.56% | ₹6.2 Cr+₹1.1 Cr (21.1%) | L4 | Admitted-Finance |
| 5 | L5₹6.3 Cr+₹1.2 Cr (24.2%)Admitted-Finance | -2.09% | ₹6.3 Cr+₹1.2 Cr (24.2%) | L5 | Admitted-Finance |
Tender Value
₹6.6 Cr
EMD Value
₹6.6 L
Closing Date
19 Sept 2025, 5:00 pmClosed
SUPERINTENDING ENGINEER (TALOJA , KAMOTHE)
CIDCO OF MAHARASHTRA LIMITED, GROUND FLOOR, CIDCO NODAL OFFICE, SECTOR - 5E, KALAMBOLI, NAVI MUMBAI.
Development of Integrated Infrastructure works of Roads (1st Stage), S.W. drain, Footpath, Water Supply and Sewerage Network in Sector - 25, balance S.W. Drain at Sector - 24, balance Water Supply and Sewer line network at Sector - 26
2025_CIDCO_1211626_1
CA02/CIDCO/EE(KMT)/2025-26
Open Tender
Civil Works
Percentage
548 days
CIDCO LTD
Please refer Tender documents.
5 documents required · 5 mandatory
₹21,240
₹6.6 L
Yes
11 Feb 2026
19 Aug 2025
22 Sept 2025
19 Aug 2025
19 Sept 2025
19 Aug 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.21 MB
TENDERDOCUMENTCA022526KMT.pdf
Tender Documents • 17.70 MB
BOQ_2094454.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .