Loading…
Loading…
Tender Value
₹24.9 L
EMD Value
₹49,900
Closing Date
16 Jan 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (M & P)
Above/Below/Par
TENDER
26 conditions · 8 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Address of tenderer: The address, email - Id and Mobile phone, other phone nos. and other details given in the portal while registering will be considered as official address and all correspondences to the tenderer will be made in these registered modes. All communication sent in time to the tenderer by post at the said address shall be deemed to have reached the tenderer duly and in time. Important documents shall be sent by Registered Post. However, an undertaking has to be given in the enclosed annexure by uploading a scanned copy of duly filled in form in the portal.
In case of above / below/at par is not mentioned or multiple rates the offer will be summarily rejected.
If tender(s) deliberately gives wrong information in his/their tender, or creates circumstances for the acceptance of his/their tender, the Railway reserves the right to reject such tender at any stage.
If the tenderer expires after the submission of his tender after the acceptance of his tender the Railway shall deem, such tender as cancelled. If a partner of a firm expires after the acceptance of their tender the railway shall deem such tender as cancelled unless the firm retains its character.
It is to be clearly understood that this is on a rough assessment. The railway administration reserves the right either not to award any or all the works to the contractor to increase or decrease the value of works without assigning any reasons. For such curtailment or increase in the works the contractor will not be entitled to any compensation whatsoever.
The tenderer shall keep the offer open for a minimum period of 45 (Forty five) days from the date of opening of the tender, during which the tenderer cannot withdraw his offer, subject to the period being extended further, if required by an agreement from time to time. Any contravention on the above condition will make the tenderer liable forfeiture of his security deposit for the due performance of the forgoing stipulation.
The tenderer(s) shall quote his/their rates inclusive of all charges including all taxes levied by the union of India or State Government including sales tax etc.
It shall be understood that every endeavor has been made to avoid any error which can materially affect the basis of the tender and the successful tender shall take open himself and provide for the risk of any error which may subsequently be discovered and shall not make subsequently claim on account, thereof.
If the work is cancelled before the commencement or is terminated during execution in accordance with the condition prescribed in Indian Railways General Conditions of Contract for works- 2022, with correction slip upto date. The railway administration reserves the right to invite fresh tenders for the whole or any portion of work.
Security Deposit: The Security Deposit shall be 5% of the contract value. The Bid Security submitted by the Contractor with his tender will be retained/encashed by the Railways as part of security for the due and faithful fulfillment of the contract by the Contractor. Provided further that, if Contractor submits the Cash or Term Deposit Receipt issued from a Scheduled commercial bank of India or irrevocable Bank Guarantee Bond from a Scheduled commercial bank of India, either towards the Full Security Depositor the Part Security Deposit equal to or more than Bid Security, the Railway shall return the Bid Security, to the Contractor. Balance of Security Deposit may be deposited by the Contractor in cash or Term Deposit Receipt issued from Scheduled commercial bank of India or irrevocable Bank Guarantee bond issued from Scheduled commercial bank of India, or may be recovered at the rate of 6% of the bill amount till the full Security Deposit is recovered. Provided also that in case of defaulting Contractor, the Railway may retain any amount due for payment to the Contractor on the pending "on account bills" so that the amounts so retained (including amount guaranteed through Performance Guarantee) may not exceed 10% of the total value of the contract.
Performance Guarantee: The successful bidder shall have to submit a Performance Guarantee (PG) within 21 (Twenty one) days from the date of issue of Letter of Acceptance (LOA). Extension of time for submission of PG beyond 21 (Twenty one) days and upto 60 days from the date of issue of LOA may be given by the Authority who is competent to sign the contract agreement. However, a penal interest of 12% per annum shall be charged for the delay beyond 21(Twenty one) days, i.e. from 22ndday after the date of issue of LOA. Further, if the 60thday happens to be a declared holiday in the concerned office of the Railway, submission of PG can be accepted on the next working day. In all other cases, if the Contractor fails to submit the requisite PG even after 60 days from the date of issue of LOA, the contract is liable to be terminated. In case contract is terminated railway shall be entitled to forfeit Bid Security and other dues payable to the contractor against that particular contract, subject to maximum of PG amount. In case a tenderer has not submitted Bid Security on the strength of their registration as a Startup recognized by Department of Industrial Policy and Promotion (DIPP) under Ministry of Commerce and Industry, DIPP shall be informed to this effect. The failed Contractor shall be debarred from participating in re-tender for that work.
(e)The Performance Guarantee (PG) shall be released after physical completion of the work based on 'Completion Certificate' issued by the competent authority stating that the Contractor has completed the work in all respects satisfactorily.
SETTLEMENT OF DISPUTES - INDIAN RAILWAY ARBITRATION AND CONCILIATION RULES : SETTLEMENT OF DISPUTES - INDIAN RAILWAY ARBITRATION AND CONCILIATION RULES will be governed as per Indian Railways Standard General Conditions of Contract,2018 corrected upto date.
Supply, Installation, and commissioning of Hot Axle Box detection system with real time data transfer to common server/computer at divisional control office NGP for 05 locations of NGP Division along with associated accessories on turnkey basis.
Mech_Cont_HABD_Nagpur~SECR
Mech_Cont_HABD_Nagpur
Open
Works - General
2 Months
Nagpur, Maharashtra
₹0
₹49,900
16 Jan 2026
18 Dec 2025
2 Jan 2026
5 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 24,94,494 | ||
| Supply, installation and commissioning of Hot axle box detector system | — | — | — | 19,74,995 | |
| — | 500.00 | — | — | ||
| Electric cable 4 core x 10 sqm. Aluminium armoured ISI mark per mtr along with trenching & laying of cable work complete installation & fittings @ 295 inclusive of 18% GST. | — | — | — | 1,64,000 | |
| GST on item no. 1 | — | — | — | 3,55,499 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
GCC_April-2022_27.04.22.pdf
ATTACHMENT
TenderDocumentHABD1.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .