Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 CrAdmitted-Finance | ₹2.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.2 Cr+₹73,112.86 (0.33%)Admitted-Finance NO 2 325 SOUTH STREET Z KULATHUR POST ANDIMADAM TALUK ARIYALUR DISTRICT | ARIYALUR | TAMIL NADU | ₹2.2 Cr+₹73,112.86 (0.33%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Shuruthi Engineering L2 | SUBBU INFRA PROJECTS PRIVATE LIMITED L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation in all classes of soil except hard rock requiring blasting and depositing on bank as per SS20B with all leads and lifts and all other incidental charges such as bailing out water shoring strutting, walling and forming protective bunds whereever necessary etc., complete as per relevent standard specification for DRESSING THE BED UP TO SILL LEVEL AND FLEXIBLE APRONS. | 205.67 | Cum | 180 ₹37,020.6 | 169 ₹34,758.23 Lowest |
| 2.00 | Earthwork excavation in all classes of soil except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labor, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION OF RAFT, CUT OF WALLS AND FLEXIBLE APRONS ON U/S SIDE AND D/S SIDE. | 1,221.5 | Cum | 420 ₹5,13,030 | 400 ₹4,88,600 Lowest |
| 3.00 | Vibrated Cement Concrete of Grade M15, using 20mm ISS size HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labor charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for Base course of RCC Raft slab. | 52.48 | Cum | 6,735 ₹3,53,452.8 Lowest | 6,735 ₹3,53,452.8 Lowest |
| 4.00 | Vibrated reinforced Cement Concrete of grade M 30 Design Mix using 20 & 12mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for Raft AND CUT OFF WALLS BELOW SILL LEVEL. | 146.88 | Cum | 9,890 ₹14,52,643.2 Lowest | 9,890 ₹14,52,643.2 Lowest |
| 5.00 | Vibrated reinforced Cement Concrete of grade M 30 Design Mix using 20 & 12mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for Raft Slab | 213.41 | Cum | 9,016 ₹19,24,104.56 | 9,015 ₹19,23,891.15 Lowest |
| 6.00 | Filling in side the raft with clean good course sand including cost and conveyance of sand to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering, with all leads for water and all other incidental charges etc, complete for filling inside the raft. | 524.79 | Cum | 1,760 ₹9,23,630.4 Lowest | 1,760 ₹9,23,630.4 Lowest |
| 7.00 | Providing and making Gabion structure with Mechanically Woven Double Twisted Hexagonal Shaped Wire mesh Gabion Boxes as per IS 16014:2012, MORTH Clause 2500, of required size Mesh Type 10 x 12 (D=100mm with tolerance of +-2%) Zinc Coated, Mesh Wire diameter 3.0mm, perpenducular to twist, tying with lacing wire of diameter 2.2mm, supplied @ 3% by wieght of Gabion boxes, filled with boulders with least dimension of 200mm as per drawing, all complete as per direction of Engineer - in - Charge | 257.98 | Cum | 3,445 ₹8,88,741.1 Lowest | 3,445 ₹8,88,741.1 Lowest |
| 8.00 | Vibrated Cement Concrete of Grade M20, using 20 & 12mm ISS size HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labor charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and including all other incidental charges etc; complete as per relevant standard specifications, for SUBSTRUCTURE OF ABUTMENTS, WINGS, AND PIERS ABOVE SILL LEVEL. | 145.32 | Cum | 8,585 ₹12,47,572.2 Lowest | 8,585 ₹12,47,572.2 Lowest |
| 9.00 | Vibrated Reinforced Cement Concrete of Grade M30, Design Mix, using ISS size HBG graded metal including cost and conveyance of all materials to site including cost of cement at site excluding cost and fabrication of steel but including cost of formwork, soft water, labor charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants including all other incidental charges etc; complete as per relevant standard specifications, for DIRT WALL CUM BED BLOCK OVER ABUTMENTS AND BED BLOCK OVER PIERS | 9.3 | Cum | 9,700 ₹90,210 Lowest | 9,700 ₹90,210 Lowest |
| 10.00 | Providing and fixing seepage pipes of 100mm dia. PVC pipes of required lengths for abutments and wings including cost and conveyance of all materials to work site, cost and labor for 900mm dia. semi-spherical back fill arrangements with 100mm size broken granite chips at the periphery and labor charges for fixing, etc., to drain of the backfill IN THE ABUTMENTS AND WINGS. | 72 | Nos | 185 ₹13,320 | 177 ₹12,744 Lowest |
Tender Value
₹2.3 Cr
EMD Value
₹2.3 L
Closing Date
27 Dec 2023, 3:00 pmClosed
The Project Director
DRDA, Ariyalur.
Construction of Bridge across Kulumur odai along Vanjinapuram to Nakkambadi road in Vanjinapuram Panchayat in Sendurai Block of Ariyalur District under NABARD RIDF XXIX (2023-24 Package No. TN 30-04 .
2023_RDTN_401559_1
DIPR/6574/TENDER/2023 Dated.12.12.2023
Open Tender
Civil Works - Bridges
Works
365 days
DRDA
As per tender document
4 documents required · 4 mandatory
₹0
₹2.3 L
DRDA, Ariyalur.
2 Jan 2024
20 Dec 2023
27 Dec 2023
20 Dec 2023
27 Dec 2023
20 Dec 2023
20 Dec 2023
Amount
Earth work excavation in all classes of soil except hard rock requiring blasting and depositing on bank as per SS20B with all leads and lifts and all other incidental charges such as bailing out water shoring strutting, walling and forming protective bunds whereever necessary etc., complete as per relevent standard specification for DRESSING THE BED UP TO SILL LEVEL AND FLEXIBLE APRONS.
Earthwork excavation in all classes of soil except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labor, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION OF RAFT, CUT OF WALLS AND FLEXIBLE APRONS ON U/S SIDE AND D/S SIDE.
Vibrated Cement Concrete of Grade M15, using 20mm ISS size HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labor charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for Base course of RCC Raft slab.
Vibrated reinforced Cement Concrete of grade M 30 Design Mix using 20 & 12mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for Raft AND CUT OFF WALLS BELOW SILL LEVEL.
Vibrated reinforced Cement Concrete of grade M 30 Design Mix using 20 & 12mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for Raft Slab
Filling in side the raft with clean good course sand including cost and conveyance of sand to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering, with all leads for water and all other incidental charges etc, complete for filling inside the raft.
Providing and making Gabion structure with Mechanically Woven Double Twisted Hexagonal Shaped Wire mesh Gabion Boxes as per IS 16014:2012, MORTH Clause 2500, of required size Mesh Type 10 x 12 (D=100mm with tolerance of +-2%) Zinc Coated, Mesh Wire diameter 3.0mm, perpenducular to twist, tying with lacing wire of diameter 2.2mm, supplied @ 3% by wieght of Gabion boxes, filled with boulders with least dimension of 200mm as per drawing, all complete as per direction of Engineer - in - Charge
Vibrated Cement Concrete of Grade M20, using 20 & 12mm ISS size HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labor charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and including all other incidental charges etc; complete as per relevant standard specifications, for SUBSTRUCTURE OF ABUTMENTS, WINGS, AND PIERS ABOVE SILL LEVEL.
Vibrated Reinforced Cement Concrete of Grade M30, Design Mix, using ISS size HBG graded metal including cost and conveyance of all materials to site including cost of cement at site excluding cost and fabrication of steel but including cost of formwork, soft water, labor charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants including all other incidental charges etc; complete as per relevant standard specifications, for DIRT WALL CUM BED BLOCK OVER ABUTMENTS AND BED BLOCK OVER PIERS
Providing and fixing seepage pipes of 100mm dia. PVC pipes of required lengths for abutments and wings including cost and conveyance of all materials to work site, cost and labor for 900mm dia. semi-spherical back fill arrangements with 100mm size broken granite chips at the periphery and labor charges for fixing, etc., to drain of the backfill IN THE ABUTMENTS AND WINGS.
Providing and fixing Kraft Paper for full width of seating of deck slab and including including cost and conveyance to work site Labour for fixing the same in correct position and all other incidental charges etc., complete.
Vibrated Reinforced Cement Concrete of Grade M-30, Design Mix, using 20mm & 12mm ISS size HBG graded metal including cost and conveyance of all materials to site including cost of cement at site excluding cost and fabrication of steel but including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants including all other incidental charges etc; complete as per relevant standard specifications, for DECK SLAB AND KERBS.
Providing filter media behind the abutments and wings with clean III graded material 53mm to 5.6mm to 600mm thick and well compacted in layers with smaller sized towards the soil and bigger size towards the wall including cost and conveyance to work site including all labours and other incidental charges including hire charges for tools and plants employed etc., for filter media as per MORT's (Roads Wing) specifications for Roads and Bridges " Fourth Revision Cl. 309-3-2-13 and 305 -4-4 etc., complete.
Filling behind Abutments and wings with clean gritty gravel including cost and conveyance of gravel to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering with all leads for water and all other incidental charges etc., complete for filling behind the abutment and wings
Provinding and fixing PVC EXPANSION JOINT in between deck slabs over abutments and piers as shown in the drawing including cost and conveyance of expeansion joints oncluding shallimar pad and joimt sealent etc., complete
Supply and fabrication of Fe-500 steel required for all RCC items of works involved in the schedule cost of steel at site fabrication,labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings,including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc,complete, Fe-500 grade-1 MT
Vibrated Cement Concrete of M-15 Grade, Nominal Mix, 1:2:4, using 20mm ISS hard granite broken metal including cost and conveyance of all materials to site and cement at site including cost of formwork, lead for soft water, labour charges for mixing , transporting, laying, and curing concrete working in heights and hire charges for tools and plants, and all other incidental charges etc complete as per relevant specification for BASE COURSE BELOW APPROACH SLAB.
Vibrated reinforced cement concrete M30 design mix using 20mm &12mm ISS graded hard granite broken metal including cost and conveyance of all materials to site including cement at site including labour charges for mixing, laying, curing concrete, working at heights,hire charges for tools and plants, including all other incidental chages etc., complete for Approach Slab.
Vibrated Cement Concrete of M-30 Grade, Design Mix, using 65% of 25mm, 25% of 12mm and 10% of 6mm IRC size HBG graded metal including cost and conveyance of all materials to worksite and cement at site including all labour charges for fixing concrete, laying, vibrating, hire charges for tools and plants, compacting, curing with all leads for soft water, including all other incidental charges, formwork, cost of remolded expansion joints and fixing the same in position etc., complete for wearing cost of 75mm uniform thickness over deck slab and approach slab.
Vibrated Reinforced Cement Concrete of M-25 Grade, Design Mix, using 20&12mm ISS size hard granite broken graded metal including cost and conveyance of all materials to site including cement at site excluding cost and fabrication of steel but including labour charges for mixing, transporting, laying, and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges, etc.,, complete for RCC HAND RAILS AND POSTS OVER DECK SLAB..
Vibrated Cement Concrete of M-20 Grade,nominal mix, using 20&12mm graded metal including cost and conveyance of all materials to site and cement at site including labour charges for mixing, transporting, laying, and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges, etc., complete as per standard specification for PCC PARAPET OVER APPROACHES..
Providing and fixing of cast iron drainage spouts 100mm dia as per MOST drawing SD/205 with grating arrangements at top as shown in the drawing using 12mm x 25mm flats for grating arrangements, and 100mm dia drainage spout projecting beyond the bottom of deck slab as shown in the drawing including cost and conveyance of cast iron pipes and flats and fixing them in position etc,complete.
Dismantling the existing Structure Dismantling the existing PCC in the existing bridge and clearing away from the work site and carefully stacking the useful materials for reuse on the road side as directed by the departmental officers including all labour and incidental charges etc., complete.
Dismantling the existing RCC in the existing bridge and clearing away from the work site and carefully stacking the useful materials for reuse on the road side as directed by the departmental officers including all labour and incidental charges etc., complete.
Approach Road. Excavation including removal and satisfactory disposal of all materials necessary for the constructionof road way and side drains in accordance with specifications and the lines , grades and cross sections shown in thedrawings or as indicated by the Engineer using Carted Eath with a lead of 3km for formation of Approach Road.
98% COMPACTION
100% COMPACTION
Providing and laying Granular Sub base as per table no 400-1/400-2 and gradung III of MORTH Revison IV with and any other Granular material or a combination those of for 150 mm thick to give a CBR of 20 on prepared sub grade in accordance with the requirements of the Specifications For Sand ,Gravel & 6mm Aggregate mix
Provding and Laying Water bound macadam Grading - II consisting of clean crused aggregates mechanically interlocked by rolling and bonding together with Screening binding materials and finised in acordance with the requirements of the specifications and thickness as per approved plans or as directed by engineer.
Provding and Laying Water bound macadam Grading - III consisting of clean crused aggregates mechanically interlocked by rolling and bonding together with Screening binding materials and finised in acordance with the requirements of the specifications and thickness as per approved plans or as directed by engineer.
Proivding and laying of Prime coat using Emulsion Bitumen at the rate of 7.00kg/sq.m over the WBM surface preparatory to another construction over it.
Proivding and laying of Tack coat using Emulsion Bitumen at the rate of 4.00kg/sq.m over the WBM surface preparatory to another construction over it.
Providing laying and compacting Open graded premix carpet 20mm thick with a liauid seal coat which is shall consist of open graded carpet of 20mm thickness in a single course composed of suitable small sized aggregated premixed with bituminous binder with application of lquid seal coat for sealing the viods in a bituminous surface conforming to the specifications.
Providing and laying of Gravel for berms including cost and conveyance of all materials to site and all labour charges for spreading, levelling and watering etc., complete.
Retaining Wall. Earthwork excavation in all classes of soil except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling out water, providing and maintaining necessary cofffer dams, sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation, backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specifications for FOUNDATION UNDER RETAINING WALL.
Filling inside the Foundation with clean coarse sand including cost and conveyance of gravel to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering with all leads for water and all other incidental charges etc., complete for filling inside the Foundation.
Vibrated Cement Concrete of Grade M 15 using 20 mm size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for FOUNDATION BELOW.
Vibrated Cement Concrete Grade M 20 using 20 & 10 mm ISS size HBG graded metal including cost and conveyance of all materials to site and cement at site but excluding cost and fabrication of steel but including form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete working at heights, hire charges for tools and plants, including all other incidental charges etc., complete as per standard specifications for RETAINING WALL FOUNDATION.
Vibrated Cement Concrete of Grade M 20 using 20 mm & 10 mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and including all other incidental charges etc; complete as per relevant standard specifications, for SUBSTRUCTURE OF RETAINING WALL ABOVE SILL LEVEL -
Providing and fixing seepage pipes of 100 mm dia. PVC pipes of required lengths for Retaining Wall including cost and conveyance of all materials to work site and labour charges for fixing, complete
Provision for Name board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Shuruthi Engineering
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.38 MB
BOQ_477967.xls
BOQ • 0.31 MB
TechnicalBid4.pdf
Tender Documents • 0.82 MB
PriceBid4.pdf
Tender Documents • 1.17 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .