| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹72.3 LAccepted-AOC 138 SEC 21 A MANDI GOBINDGARH | ₹72.3 L | L1 | Accepted-AOC Lowest Quoted Amount |
Tender Value
₹73.4 L
EMD Value
₹1.5 L
Closing Date
26 Feb 2026, 1:00 pmClosed
DSCO Keshav Kumar
Opposite Aggarwal Hospital, Kishanpura Road, Sangrur
Laying and Jointing of RCC UGPL Wroks, Fixing of ARV, AAV, GV/Sluice Valves, Construction of Haudies and all other allied works.
2026_DOA_157615_4
DSWC/SGR/2025-26/26
Open Tender
Pipe Laying Works
365 days
Sangrur
Please refer tender documents.
3 documents required · 3 mandatory
₹2,000
₹1.5 L
16 Apr 2026
18 Feb 2026
26 Feb 2026
18 Feb 2026
26 Feb 2026
18 Feb 2026
DEPARTMENT OF SOIL AND WATER CONSERVATION, PUNJAB
Divisional Soil Conservation Officer, Sangrur
Tender No: DSWC/SGR/2025-26/26
Name of the Firm/Bidder
Address of Firm/Bidder
Mobile No of Firm/Bidder Email ID of Firm
Total Estimated Amount of Works Rs. Rupees Seventy Three Lakh Forty Four Thousand Three Hundred Eighty Five only
Quoted by Contractor {- or + to estimated amount, in figure upto 2 dcimal point only} Quote (-/+)
Note: Please quote only figure (upto 2 decimal points) in above blue colour box in minus or plus. Do not put %age sign after this figure. Please check Quoted Rate in Next cell.
Note: Please refer to DNIT for item wise rate and details.
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline, lowering and jointing of 600 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village -Kumbarwal (C/o 8825/R), Tehsil Dhuri and District- Sangrur.
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 10032 /Cum 93.78 Rupees Ninty Three and Seventy Eight Paise Only
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 5225 /Mtrs 74 Rupees Seventy four Only
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . 2090 /Joints Three Hundered thirty one and sixty four paise
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (600 mm) 55 /Cut hole 150 one fifty rupees only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 20 /Cut hole 41 Rupees Forty One Only
Fixing of Riser Pipe & Fixing of Alfa Alfa valves with C.C 1:2:4 (600 mm) 55 /Riser & Valve 947.91 Nine Hundred Fourty seven and ninety one
Fixing of Air vent Pipes with C.C 1:2:4 (150mm) 20 /Air pipe Two Eighty Five and Fourty one
Fixing of gate valve (600 mm) 7 each 2748.08 Twenty seven Hundred and Fourty Eight and Eight paise
Estimate of Charges for Haudi (1.20 X 1.20 X 3 m)
Earth work in Excavation 8 cum 93.78 Rupees Ninty Three and Seventy Eight Paise Only 10845400
B.B.C 1:8:16 0.6 cum 3848.5 Three thousand Fourty Eight and Fifty Paise
Plain Cement Concrete 1:2:4 0.14 cum Five thousand fifty seven and Fourty paise
First Class burnt brick work laid in Cement sand mortar in 1:4 in foundation and plinth 4.75 cum 5031.5 Rupees Five Thousand Thirty Two and Twenty One Paise Only
12.5 mm thick cement plaster work 1:4 15.32 cum 201.2 Rupees Two Hundred One and Twenty Paise Only ok
RCC Slab 1:2:4 0.21 cum 8157.48 Rupees Eight Thousand One Hundered Fifty seven and Fourty Eight Paise Only
Foot rest (Item No. 29.37) 6 No 100 Rupees One Hundred Only
Total Cost for ONE Haudi
Total Cost for eight Haudi B
Providing and Fixing of jaal 1 each 4000 Rupees Four Thousand Only
Sign Board (5' X 3') 1 each 4000 Rupees Four Thousand Only
Nimar for jointing the pipe (600mm) 712.69 Per kg 60 Rupees Sixty Only
Road Cut 0 Per Cut 15000 Fifteen thousand only
Provision for Carriage of Pipe for lead upto 2 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less) as per CSR 5.2 (13 b,c,d) of 2013 1059 per tonnes 209.85 Rupees Two Hundred nine and Eighty Five
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline , lowering and jointing of 450 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village - Bimbri and Phumanwal (C/o 5311/L), Tehsil-Bhawanigarh and District- Sangrur.
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 12181.72 /Cum 93.78 Rupees Ninety Three and Seventy Eight Paise Only
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 7392 /Mtrs 71 Rupee Seventy One Only
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . 2957 /Joints 234.18 Rupees Two Hundred Thirty Four and Eighteen Paise Only
Supplying, Lowering and Jointing of class N.P.-3 R.C.C pipes (450mm) in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge. (Through Rate) 10 /Meter 3274.28 Rupees Three Thousand Two Hundred Seventy Four and Twenty Eight Paise Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (450 mm) 50 /Cut hole 116 Rupees One hundered Sixteen Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 25 /Cut hole 41 Rupees Forty One Only
Fixing of Riser Pipe & Fixing of Alfa Alfa valves with C.C 1:2:4 (450mm) 50 /Riser & Valve 757.57 Rupees Seven Hundred Fifty Seven and Fifty Seven Paise Only
Fixing of Air vent Pipes with C.C 1:2:4 (150mm) 25 /Air pipe 284.73 Rupees Two Hundred Eighty Four and Seventy Three Paise Only
Fixing of gatevalve(450mm) 15 /Air pipe 2162.17 Rupees Two Thousand One Hundred Sixty Two and Seventeen Paise Only
Estimate of Charges for Haudi (1.20 X 1.20 X 3 m)
Earth work in Excavation 8 cum 93.78 Rupees Ninety Three and Seventy Eight Paise Only
B.B.C 1:8:16 0.6 cum 3848.69 Rupees Three Thousand Eight Hundred Forty Eight And Sixty Nine Paise Only
Plain Cement Concrete 1:2:4 0.14 cum Rupees Five Thousand Forty Five and Forty Paise Only
First Class burnt brick work laid in Cement sand mortar in 1:4 in foundation and plinth 4.75 cum 5034.8 Rupees Five Thousand Thirty Four and Eighty Paise Only
12.5 mm thick cement plaster work 1:4 15.32 cum 201.27 Rupees Two Hundred One and Twenty Seven Paise Only
RCC Slab 1:2:4 0.21 cum 8147.08 Rupees Eight Thousand One Hundred Forty Seven And Eight Paise Only
Foot rest (Item No. 29.37) 6 No 100 Rupees One Hundred Only
Total Cost for ONE Haudi
Total Cost for Thirteen Haudis
Cost of Other Items
Providing and Fixing of jaal 1 each 4000 Rupees Four Thousand Only
Sign Board (5' X 3') 1 each 4000 Rupees Four Thousand Only
Nimar for jointing the pipe 452.982 Per kg 60 Rupees Sixty Only
Provision for Carriage of Pipe for lead upto 2 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less) as per CSR 5.2 (13 b,c,d) of 2013 888.636 per tonnes 172.94 Rupees One Hundred Seventy Two and Ninty Four paise only
Credit of damaged lined water channel existing on site to be deducted from the bill of Agency 30289
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline, lowering and jointing of 250 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village -Kila Hakima (C/o 365/R), Tehsil Dhuri and District- Sangrur.
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 638.4 /Cum 93.78 Rupees Ninty Three and Seventy Eight Paise Only
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 560 /Mtrs 70 Rupees Seventy Only
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . 280 /Joints 90.89 Rupees Ninety And Eighty nine Paise Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (250 mm) 7 /Cut hole 62 Sixty two RupeesOnly
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 4 /Cut hole 41 Rupees Forty One Only
Fixing of Riser Pipe & Fixing of Alfa Alfa valves with C.C 1:2:4 (250 mm) 7 /Riser & Valve 432.38 Rupees Four Hundred Thirty Two And Thirty Eight Paise Only
Fixing of Air vent Pipes with C.C 1:2:4 (150mm) 4 /Air pipe Rupees Two Hundred Eighty Four and Twenty Two Paise Only
Estimate of Charges for Haudi (1.20 X 1.20 X 3 m)
Earth work in Excavation 8 cum 93.78 Rupees Ninty Three and Seventy Eight Paise Only
B.B.C 1:8:16 0.6 cum 3784.95 Rupees Three Thousand Seven Hundred Egihty Four and Nighnty Five Paise Only
Plain Cement Concrete 1:2:4 0.14 cum 5048.21 Rupees Five Thousand Fourty Eight and Twenty One Paise Only
First Class burnt brick work laid in Cement sand mortar in 1:4 in foundation and plinth 4.75 cum 5032.21 Rupees Five Thousand Thirty Two and Twenty One Paise Only
12.5 mm thick cement plaster work 1:4 15.32 cum 201.18 Rupees Two Hundred One and Eighteen Paise Only
RCC Slab 1:2:4 0.21 cum 8149.42 Rupees Eight Thousand One Hundered Fourty Nine and Fourty Two Paise Only
Foot rest (Item No. 29.37) 6 No 100 Rupees One Hundred Only
Total Cost for ONE Haudi
Total Cost for One Haudi B
Cost of Other Items
Providing and Fixing of jaal 1 each 4000 Rupees Four Thousand Only
Sign Board (5' X 3') 1 each 4000 Rupees Four Thousand Only
Nimar for jointing the pipe (250mm) 18.2 Per kg 60 Rupees Sixty Only
Road Cut 0 Per Cut 15000 Fifteen thousand only
Provision for Carriage of Pipe for lead upto 2 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less) as per CSR 5.2 (13 b,c,d) of 2013 38 per tonnes Rupees One Hundred Sixty and Thirty paise only
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline, lowering and jointing of 400 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village - Majhi and Nakta (C/o 13540/L Extension) Tehsil-Bhawanigarh, District- Sangrur.
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 5680.13 /Cum 93.78 Rupees Ninety Three and Seventy Eight Paise Only
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 3825 /Mtrs 71 Rupee Seventy One Only
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . 1530 /Joints Rupees Two Hundred Seven and Fifty Seven Paise Only
Supplying, Lowering and Jointing of class N.P.-3 R.C.C pipes (400mm) in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge. (Through Rate) 20 /Meter 2777.03 Two Thousand Seven Hundered Seventy Seven Rupees and Three Paise Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (400 mm) 30 /Cut hole 105 One Hundred Five Rupees And Zero Paisa Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 16 /Cut hole 41 Rupees Fourty One Only
Fixing of Riser Pipe & Fixing of Alfa Alfa valves with C.C 1:2:4 400 mm) 30 /Riser & Valve 701.01 Seven Hundred One Rupees And One Paisa Only
Fixing of Air vent Pipes with C.C 1:2:4 (150 mm) 16 /Air pipe Two Hundred Eighty Four Rupees And Ninety Paisa Only
Fixing of pump stand with C.C 1:2:4 (1000 mm) 2 /pump stand Two Thousand Three Hundred Ninety Rupees And Twenty Six Paisa Only
Fixing of Gate valves with C.C 1:2:4 (400 mm) 10 /Gate Valve 2042.9 Two Thousand Forty Two Rupees And Eighty Ninety Paisa Only
Estimate of Charges for Haudi (1.20 X 1.20 X 3 m)
Earth work in Excavation 8 cum 93.78 Rupees Ninety Three and Seventy Eight Paise Only
B.B.C 1:8:16 0.6 cum 3892.16 Three Thousand Eight Hundred Ninety Two Rupees And Sixteen Paise Only
Plain Cement Concrete 1:2:4 0.14 cum 5156 Five Thousand One Hundered Fifty Six Rupees Only
First Class burnt brick work laid in Cement sand mortar in 1:4 in foundation and plinth 4.75 cum Four Thousand Twenty Three Rupees And Ninety Paisa Only
12.5 mm thick cement plaster work 1:4 15.32 cum 202.69 Two Hundred Two Rupees And Sixty Nine Paisa Only
RCC Slab 1:2:4 0.21 cum 8200 Eight Thousand Two Hundred Rupees Only
Foot rest (Item No. 29.37) 6 No 100 Rupees One Hundred Only
Total Cost for ONE Haudi
Total Cost for Five Haudis
Cost of Other Items
Providing and Fixing of jaal 1 each 4000 Rupees Four Thousand Only
Sign Board (5' X 3') 1 each 4000 Rupees Three Thousand Only
Nimar for jointing the pipe 211.14 Kg 60 Rupees Sixty Only
Provision for Carriage of Pipe for lead upto 2 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less) as per CSR 5.2 (13 b,c,d) of 2020 376.98 Ton 172.94 One Hundred Seventy Two Rupees And Ninety Four Paisa Only
Total Credit of Damaged Lined Water Channel Existing on Site to be Deducted from the Bill of Agency 25927
Grand Total (A+B+C+D)
Grand Total Credit of damaged lined water channel existing on site to be deducted from the bill of Agency
stage.html
html • 0.04 MB
technical_326775.pdf
techsummary_326775.pdf
finance_326775.pdf
finsummary_326775.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.52 MB
NITUGPL252626.pdf
Tender Documents • 0.50 MB
DNITUGPL252626.pdf
Tender Documents • 1.18 MB
FBUGPL252626.xls
Additional Documents • 0.16 MB
Download all tender documents and submit your bid